---
kind: "section"
citation: "48 C.F.R. § 1425.202"
title: "48"
number: "1425.202"
heading: "Exceptions."
url: "https://uscodex.org/cfr/48/1425.202"
---

# §1425.202. Exceptions.

- (a)
  - (1) The CO may determine the reasonableness of cost as determined by the formula in 1425.203-70.
  - (2) The Director, PAM has the authority to make the determination that use of U.S. construction material would be impracticable. Failure of the Director, PAM to issue a determination within 30 days after receipt of a request will be deemed approval for use of the cited foreign material.
  - (3) For items not on the list at FAR 25.108(d), the CCO may make the non-availability determination if the items cost less than the SAT. The HCA may make the non-availability determination when the cost of the items exceeds the SAT.
- (b) [Reserved]

## Notes

### Authority

Authority: Sec. 205(c), 63 Stat. 390, 40 U.S.C. 486(c); and 5 U.S.C. 301.

### Source

Source: 75 FR 19829, Apr. 15, 2010, unless otherwise noted.
