---
kind: "section"
citation: "47 C.F.R. § 90.551"
title: "47"
number: "90.551"
heading: "Construction requirements."
url: "https://uscodex.org/cfr/47/90.551"
---

# §90.551. Construction requirements.


Each station authorized under this subpart to operate in the 769-775 MHz and 799-805 MHz frequency bands must be constructed and placed into operation within 12 months from the date of grant of the authorization, except for State channels. However, licensees may request a longer construction period, up to but not exceeding 5 years, pursuant to [§ 90.155(b)](/cfr/47/90.155.md?p=b). State channels are subject to the build-out requirements in [§ 90.529](/cfr/47/90.529.md).


## Notes

### Amendments

[72 FR 48863, Aug. 24, 2007]

### Source

Source: 63 FR 58651, Nov. 2, 1998, unless otherwise noted.

### Authority

Authority: 47 U.S.C. 154(i), 161, 303(g), 303(r), 332(c)(7), 1401-1473

### Source

Source: 43 FR 54791, Nov. 22, 1978, unless otherwise noted.

### Amendments

[72 FR 48863, Aug. 24, 2007]
