# §64.81. 30-month inspection of an MPT.

- (a) The 30-month inspection of an MPT required in [§ 64.77(b)](/cfr/46/64.77.md?p=b) must include—
  - (1) **An internal and external examination for—**
    - (i) Corrosion;
    - (ii) Cracking of base material; and
    - (iii) Weld defects; and
  - (2) A visual inspection for defective parts and a manual operation of the gauging device, remote operating mechanism, and each valve, except the pressure relief device.
- (b) If the tank passes the inspection required in [paragraph (a)](#a) of this section, the owner or his representative may stencil the date of the inspection on the MPT near the metal identification plate that is required in [§ 64.53](/cfr/46/64.53.md) in durable and legible letters that are 1 1/4 inch in height or larger.