---
kind: "section"
citation: "46 C.F.R. § 62.20-1"
title: "46"
number: "62.20-1"
heading: "Plans for approval."
url: "https://uscodex.org/cfr/46/62.20-1"
---

# §62.20-1. Plans for approval.

- (a) The following plans must be submitted to the Coast Guard for approval in accordance with §§ [50.20-5](/cfr/46/50.20-5.md) and [50.20-10](/cfr/46/50.20-10.md) of this chapter:
  - (1) A general arrangement plan of control and monitoring equipment, control locations, and the systems served.
  - (2) **Control and monitoring console, panel, and enclosure layouts.**
  - (3) Schematic or logic diagrams including functional relationships, a written description of operation, and sequences of events for all modes of operation.
  - (4) **A description of control or monitoring system connections to non-vital systems.**
  - (5) **A description of programmable features.**
  - (6) **A description of built-in test features and diagnostics.**
  - (7) Design Verification and Periodic Safety test procedures described in [subpart 61.40](/cfr/46/subpart61.40.md) of this subchapter.
  - (8) **Control system normal and emergency operating instructions.**
- (b) [Reserved]

## Notes

### Amendments

[CGD 81-030, 53 FR 17838, May 18, 1988, as amended by USCG-2014-0688, 79 FR 58280, Sept. 29, 2014]

### Source

Source: CGD 81-030, 53 FR 17838, May 18, 1988, as amended by USCG-2020-0634, 89 FR 50190, June 12, 2024, unless otherwise noted.

### Authority

Authority: 46 U.S.C. 3306, 3703, 8105; sec. 617, Pub. L. 111-281, 124 Stat. 2905; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; DHS Delegation No. 00170.1, Revision No. 01.4.

### Source

Source: CGD 81-030, 53 FR 17838, May 18, 1988, unless otherwise noted.

### Amendments

[CGD 81-030, 53 FR 17838, May 18, 1988, as amended by USCG-2014-0688, 79 FR 58280, Sept. 29, 2014]
