# §58.30-40. Plans.

- (a) Diagrammatic plans and lists of materials must be submitted for each of the fluid power and control systems listed in [§ 58.30-1(a)](/cfr/46/58.30-1.md?p=a) that is installed on the vessel. Plan submission must be in accordance with [subpart 50.20](/cfr/46/subpart50.20.md) of this subchapter and must include the following:
  - (1) **The purpose of the system.**
  - (2) **Its location on the vessel.**
  - (3) **The maximum allowable working pressure.**
  - (4) **The fluid used in the system.**
  - (5) Details of the system components in accordance with [§ 56.01-10(d)](/cfr/46/56.01-10.md?p=d) of this subchapter.
- (b) [Reserved]

## Notes

### Source

Source: USCG-2020-0634, 89 FR 50179, June 12, 2024, unless otherwise noted.

### Authority

Authority: 43 U.S.C. 1333; 46 U.S.C. 3306, 3703; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; DHS Delegation No. 00170.1, Revision No. 01.4.

### Source

Source: CGFR 68-82, 33 FR 18878, Dec. 18, 1968, unless otherwise noted.