---
kind: "section"
citation: "46 C.F.R. § 111.33-5"
title: "46"
number: "111.33-5"
heading: "Installation."
url: "https://uscodex.org/cfr/46/111.33-5"
---

# §111.33-5. Installation.


Each semiconductor converter system must meet the installation requirements, as appropriate, of—

- (a) Sections [4.31.19.2](/cfr/46/4.31.19.2.md), [4.31.19.7](/cfr/46/4.31.19.7.md), and [4.31.19.8](/cfr/46/4.31.19.8.md) of IEEE 45.2-2011 (incorporated by reference; see [§ 110.10-1](/cfr/46/110.10-1.md) of this subchapter); or
- (b) **IEC 60092-304—** 1980 (incorporated by reference; see [§ 110.10-1](/cfr/46/110.10-1.md) of this subchapter).

## Notes

### Amendments

[USCG-2020-0075, 88 FR 16361, Mar. 18, 2023]

### Authority

Authority: 46 U.S.C. 3306, 3703; DHS Delegation No. 00170.1, Revision No. 01.2. Section 111.05-20 and Subpart 111.106 also issued under sec. 617, Pub. L. 111-281, 124 Stat. 2905.

### Source

Source: CGD 74-125A, 47 FR 15236, Apr. 8, 1982, unless otherwise noted.

### Amendments

[USCG-2020-0075, 88 FR 16361, Mar. 18, 2023]
