---
kind: "section"
citation: "43 C.F.R. § 3173.22"
title: "43"
number: "3173.22"
heading: "Requirements for off-lease measurement."
url: "https://uscodex.org/cfr/43/3173.22"
---

# §3173.22. Requirements for off-lease measurement.


The BLM will consider granting a request for off-lease measurement if the request:

- (a) Involves only production from a single lease, unit PA, CA, or CAA;
- (b) Provides for accurate production accountability;
- (c) Is in the public interest (considering factors such as BMPs, topographic and environmental conditions that make on-lease measurement physically impractical, and maximum ultimate economic recovery); and
- (d) **Occurs at an approved FMP.** A request for approval of an FMP (see [§ 3173.12](/cfr/43/3173.12.md)) may be filed concurrently with the request for off-lease measurement.

## Notes

### Authority

Authority: 25 U.S.C. 396d and 2107; 30 U.S.C. 189, 306, 359, and 1751; and 43 U.S.C. 1732(b), 1733, and 1740.

### Source

Source: 81 FR 81421, Nov. 17, 2016, unless otherwise noted.
