---
kind: "unit"
title: "40"
title_heading: "Protection of Environment"
key: "chI/subchC/part60/subpartLLLL"
level: "subpart"
label: "Subpart LLLL"
heading: "Standards of Performance for New Sewage Sludge Incineration Units"
release: "ecfr-current"
date: "2026-08-27"
url: "https://uscodex.org/cfr/40/chI-subchC-part60-subpartLLLL"
sections_count: 36
---

# Subpart LLLL — Standards of Performance for New Sewage Sludge Incineration Units

Title 40 C.F.R. — Protection of Environment › Chapter I — Environmental Protection Agency › Subchapter C — Air Programs › Part 60 — Standards of Performance for New Stationary Sources

## Sections

- [§60.4760. What does this subpart do?](/cfr/40/60.4760.md)
- [§60.4765. When does this subpart become effective?](/cfr/40/60.4765.md)
- [§60.4770. Does this subpart apply to my sewage sludge incineration unit?](/cfr/40/60.4770.md)
- [§60.4775. What is a new sewage sludge incineration unit?](/cfr/40/60.4775.md)
- [§60.4780. What sewage sludge incineration units are exempt from this subpart?](/cfr/40/60.4780.md)
- [§60.4785. Who implements and enforces this subpart?](/cfr/40/60.4785.md)
- [§60.4790. How are these new source performance standards structured?](/cfr/40/60.4790.md)
- [§60.4795. Do all nine components of these new source performance standards apply at the same time?](/cfr/40/60.4795.md)
- [§60.4800. Who must prepare a siting analysis?](/cfr/40/60.4800.md)
- [§60.4805. What is a siting analysis?](/cfr/40/60.4805.md)
- [§60.4810. What are the operator training and qualification requirements?](/cfr/40/60.4810.md)
- [§60.4815. When must the operator training course be completed?](/cfr/40/60.4815.md)
- [§60.4820. How do I obtain my operator qualification?](/cfr/40/60.4820.md)
- [§60.4825. How do I maintain my operator qualification?](/cfr/40/60.4825.md)
- [§60.4830. How do I renew my lapsed operator qualification?](/cfr/40/60.4830.md)
- [§60.4835. What if all the qualified operators are temporarily not accessible?](/cfr/40/60.4835.md)
- [§60.4840. What site-specific documentation is required and how often must it be reviewed by qualified operators and plant personnel?](/cfr/40/60.4840.md)
- [§60.4845. What emission limits and standards must I meet and by when?](/cfr/40/60.4845.md)
- [§60.4850. What operating limits and requirements must I meet and by when?](/cfr/40/60.4850.md)
- [§60.4855. How do I establish operating limits if I do not use a wet scrubber, fabric filter, electrostatic precipitator, or activated carbon injection, or if I limit emissions in some other manner, to comply with the emission limits?](/cfr/40/60.4855.md)
- [§60.4860. Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction?](/cfr/40/60.4860.md)
- [§60.4861. How do I establish an affirmative defense for exceedance of an emission limit or standard during malfunction?](/cfr/40/60.4861.md)
- [§60.4865. How and when do I demonstrate initial compliance with the emission limits and standards?](/cfr/40/60.4865.md)
- [§60.4870. How do I establish my operating limits?](/cfr/40/60.4870.md)
- [§60.4875. By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?](/cfr/40/60.4875.md)
- [§60.4880. How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?](/cfr/40/60.4880.md)
- [§60.4885. How and when do I demonstrate continuous compliance with the emission limits and standards?](/cfr/40/60.4885.md)
- [§60.4890. How do I demonstrate continuous compliance with my operating limits?](/cfr/40/60.4890.md)
- [§60.4895. By what date must I conduct annual air pollution control device inspections and make any necessary repairs?](/cfr/40/60.4895.md)
- [§60.4900. What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?](/cfr/40/60.4900.md)
- [§60.4905. What are the monitoring and calibration requirements for compliance with my operating limits?](/cfr/40/60.4905.md)
- [§60.4910. What records must I keep?](/cfr/40/60.4910.md)
- [§60.4915. What reports must I submit?](/cfr/40/60.4915.md)
- [§60.4920. Am I required to apply for and obtain a title V operating permit for my unit?](/cfr/40/60.4920.md)
- [§60.4925. When must I submit a title V permit application for my new SSI unit?](/cfr/40/60.4925.md)
- [§60.4930. What definitions must I know?](/cfr/40/60.4930.md)
