---
kind: "unit"
title: "40"
title_heading: "Protection of Environment"
key: "chI/subchC/part60/subpartEEEE"
level: "subpart"
label: "Subpart EEEE"
heading: "Standards of Performance for Other Solid Waste Incineration Units"
release: "ecfr-current"
date: "2026-08-27"
url: "https://uscodex.org/cfr/40/chI-subchC-part60-subpartEEEE"
sections_count: 65
---

# Subpart EEEE — Standards of Performance for Other Solid Waste Incineration Units

Title 40 C.F.R. — Protection of Environment › Chapter I — Environmental Protection Agency › Subchapter C — Air Programs › Part 60 — Standards of Performance for New Stationary Sources

## Sections

- [§60.2880. What does this subpart do?](/cfr/40/60.2880.md)
- [§60.2881. When does this subpart become effective?](/cfr/40/60.2881.md)
- [§60.2885. Does this subpart apply to my incineration unit?](/cfr/40/60.2885.md)
- [§60.2886. What is a new incineration unit?](/cfr/40/60.2886.md)
- [§60.2887. What combustion units are excluded from this subpart?](/cfr/40/60.2887.md)
- [§60.2888. Are air curtain incinerators regulated under this subpart?](/cfr/40/60.2888.md)
- [§60.2889. Who implements and enforces this subpart?](/cfr/40/60.2889.md)
- [§60.2890. How are these new source performance standards structured?](/cfr/40/60.2890.md)
- [§60.2891. Do all components of these new source performance standards apply at the same time?](/cfr/40/60.2891.md)
- [§60.2894. Who must prepare a siting analysis?](/cfr/40/60.2894.md)
- [§60.2895. What is a siting analysis?](/cfr/40/60.2895.md)
- [§60.2899. What is a waste management plan?](/cfr/40/60.2899.md)
- [§60.2900. When must I submit my waste management plan?](/cfr/40/60.2900.md)
- [§60.2901. What should I include in my waste management plan?](/cfr/40/60.2901.md)
- [§60.2905. What are the operator training and qualification requirements?](/cfr/40/60.2905.md)
- [§60.2906. When must the operator training course be completed?](/cfr/40/60.2906.md)
- [§60.2907. How do I obtain my operator qualification?](/cfr/40/60.2907.md)
- [§60.2908. How do I maintain my operator qualification?](/cfr/40/60.2908.md)
- [§60.2909. How do I renew my lapsed operator qualification?](/cfr/40/60.2909.md)
- [§60.2910. What site-specific documentation is required?](/cfr/40/60.2910.md)
- [§60.2911. What if all the qualified operators are temporarily not accessible?](/cfr/40/60.2911.md)
- [§60.2915. What emission limitations must I meet and by when?](/cfr/40/60.2915.md)
- [§60.2916. What operating limits must I meet and by when?](/cfr/40/60.2916.md)
- [§60.2917. What if I do not use a wet scrubber, dry scrubber, electrostatic precipitator, or fabric filter to comply with the emission limitations?](/cfr/40/60.2917.md)
- [§60.2918. Reserved](/cfr/40/60.2918.md)
- [§60.2922. How do I conduct the initial and annual performance test?](/cfr/40/60.2922.md)
- [§60.2923. How are the performance test data used?](/cfr/40/60.2923.md)
- [§60.2927. How do I demonstrate initial compliance with the emission limitations and establish the operating limits?](/cfr/40/60.2927.md)
- [§60.2928. By what date must I conduct the initial performance test?](/cfr/40/60.2928.md)
- [§60.2929. What are the substitute means of compliance demonstration requirements for very small municipal waste combustion units and institutional waste incineration units with capacities less than or equal to 10 tons per day?](/cfr/40/60.2929.md)
- [§60.2932. How do I demonstrate continuous compliance with the emission limitations and the operating limits?](/cfr/40/60.2932.md)
- [§60.2933. By what date must I conduct the annual performance test?](/cfr/40/60.2933.md)
- [§60.2934. May I conduct performance testing less often?](/cfr/40/60.2934.md)
- [§60.2935. May I conduct a repeat performance test to establish new operating limits?](/cfr/40/60.2935.md)
- [§60.2939. What continuous emission monitoring systems must I install?](/cfr/40/60.2939.md)
- [§60.2940. How do I make sure my continuous emission monitoring systems are operating correctly?](/cfr/40/60.2940.md)
- [§60.2941. What is my schedule for evaluating continuous emission monitoring systems?](/cfr/40/60.2941.md)
- [§60.2942. What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?](/cfr/40/60.2942.md)
- [§60.2943. How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?](/cfr/40/60.2943.md)
- [§60.2944. What operating parameter monitoring equipment must I install, or what operating parameters must I monitor?](/cfr/40/60.2944.md)
- [§60.2945. Is there a minimum amount of operating parameter monitoring data I must obtain?](/cfr/40/60.2945.md)
- [§60.2949. What records must I keep?](/cfr/40/60.2949.md)
- [§60.2950. Where and in what format must I keep my records?](/cfr/40/60.2950.md)
- [§60.2951. What reports must I submit?](/cfr/40/60.2951.md)
- [§60.2952. What must I submit prior to commencing construction?](/cfr/40/60.2952.md)
- [§60.2953. What information must I submit prior to initial startup?](/cfr/40/60.2953.md)
- [§60.2954. What information must I submit following my initial performance test?](/cfr/40/60.2954.md)
- [§60.2955. When must I submit my annual report?](/cfr/40/60.2955.md)
- [§60.2956. What information must I include in my annual report?](/cfr/40/60.2956.md)
- [§60.2957. What other reports must I submit if I have a deviation?](/cfr/40/60.2957.md)
- [§60.2958. What must I include in the deviation report?](/cfr/40/60.2958.md)
- [§60.2959. What else must I report if I have a deviation from the requirement to have a qualified operator accessible?](/cfr/40/60.2959.md)
- [§60.2960. Are there any other notifications or reports that I must submit?](/cfr/40/60.2960.md)
- [§60.2961. In what form can I submit my reports?](/cfr/40/60.2961.md)
- [§60.2962. Can reporting dates be changed?](/cfr/40/60.2962.md)
- [§60.2966. Am I required to apply for and obtain a title V permit for my unit?](/cfr/40/60.2966.md)
- [§60.2967. When must I submit a title V permit application for my new unit?](/cfr/40/60.2967.md)
- [§60.2969. What are the requirements for temporary-use incinerators and air curtain incinerators used in disaster recovery?](/cfr/40/60.2969.md)
- [§60.2970. What is an air curtain incinerator?](/cfr/40/60.2970.md)
- [§60.2971. What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?](/cfr/40/60.2971.md)
- [§60.2972. How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?](/cfr/40/60.2972.md)
- [§60.2973. What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?](/cfr/40/60.2973.md)
- [§60.2974. Reserved](/cfr/40/60.2974.md)
- [§60.2975. What equations must I use?](/cfr/40/60.2975.md)
- [§60.2977. What definitions must I know?](/cfr/40/60.2977.md)
