---
kind: "section"
citation: "40 C.F.R. § 93.114"
title: "40"
number: "93.114"
heading: "Criteria and procedures: Currently conforming transportation plan and TIP."
url: "https://uscodex.org/cfr/40/93.114"
---

# §93.114. Criteria and procedures: Currently conforming transportation plan and TIP.


There must be a currently conforming transportation plan and currently conforming TIP at the time of project approval, or a project must meet the requirements in [§ 93.104(f)](/cfr/40/93.104.md?p=f) during the 12-month lapse grace period.

- (a) Only one conforming transportation plan or TIP may exist in an area at any time; conformity determinations of a previous transportation plan or TIP expire once the current plan or TIP is found to conform by DOT. The conformity determination on a transportation plan or TIP will also lapse if conformity is not determined according to the frequency requirements specified in [§ 93.104](/cfr/40/93.104.md).
- (b) This criterion is not required to be satisfied at the time of project approval for a TCM specifically included in the applicable implementation plan, provided that all other relevant criteria of this subpart are satisfied.

## Notes

### Amendments

[62 FR 43801, Aug. 15, 1997, as amended at 73 FR 4440, Jan. 24, 2008]

### Source

Source: 62 FR 43801, Aug. 15, 1997, unless otherwise noted.

### Authority

Authority: 42 U.S.C. 7401-7671q.

### Source

Source: 58 FR 62235, Nov. 24, 1993, unless otherwise noted.

### Amendments

[62 FR 43801, Aug. 15, 1997, as amended at 73 FR 4440, Jan. 24, 2008]
