---
kind: "section"
citation: "40 C.F.R. § 65.67"
title: "40"
number: "65.67"
heading: "Reporting provisions."
url: "https://uscodex.org/cfr/40/65.67"
---

# §65.67. Reporting provisions.

- (a) **Initial compliance status report.** The owner or operator shall submit as part of the Initial Compliance Status Report specified in [§ 65.5(d)](/cfr/40/65.5.md?p=d) the information recorded in § [65.66(a)](/cfr/40/65.66.md?p=a), [(b)](/cfr/40/65.66.md?p=b), and [(c)](/cfr/40/65.66.md?p=c), as applicable.
- (b) **Process change.**
  - (1) Whenever a process change, as described in [§ 65.63(f)](/cfr/40/65.63.md?p=f), is made that causes a Group 2A or 2B process vent to become a Group 1 process vent or a Group 2B process vent to become a Group 2A process vent, the owner or operator shall either submit a report within 60 days after the performance test or group determination or submit a report included as part of the next periodic report. The report shall include the following information:
    - (i) A description of the process change;
    - (ii) The results of the recalculation of the flow rate, organic HAP or TOC concentration, and/or TRE index value required under [§ 65.63(f)](/cfr/40/65.63.md?p=f) and recorded under [§ 65.66(d)](/cfr/40/65.66.md?p=d); and
    - (iii) A statement that the owner or operator will comply with the provisions of [§ 65.63](/cfr/40/65.63.md) by the schedules specified in [§ 65.63(f)(4) through (6)](/cfr/40/65.63.md?p=f-4..f-6).
  - (2) For process vents that become Group 1 process vents after a process change requiring a performance test to be conducted for the control device being used as specified in [subpart G](/cfr/40/subpartG.md) of this part, the owner or operator shall specify that the performance test has become necessary due to a process change. This specification shall be made in the notification to the Administrator of the intent to conduct a performance test as provided in [§ 65.164(b)(1)](/cfr/40/65.164.md?p=b-1).
  - (3) Whenever a process change as described in [§ 65.63(f)](/cfr/40/65.63.md?p=f) is made that changes the group status of a process vent from Group 1 to Group 2A, or from Group 1 to Group 2B, or from Group 2A to Group 2B, the owner or operator shall include a statement in the next periodic report after the process change that a process change has been made and the new group status of the process vents.
  - (4) The owner or operator is not required to submit a report of a process change if one of the following conditions is met:
    - (i) The change does not meet the definition of a process change in [§ 65.63(f)](/cfr/40/65.63.md?p=f); or
    - (ii) For a Group 2B process vent, the vent stream flow rate is recalculated according to [§ 65.63(f)](/cfr/40/65.63.md?p=f) and the recalculated value is less than 0.011 standard cubic meter per minute (0.40 standard cubic foot per minute); or
    - (iii) For a Group 2B process vent, the organic HAP or TOC concentration of the vent stream is recalculated according to [§ 65.63(f)](/cfr/40/65.63.md?p=f), and the recalculated value is less than the applicable value in table 1 to this subpart; or
    - (iv) For a Group 2B process vent, the TRE index value is recalculated according to [§ 65.63(f)](/cfr/40/65.63.md?p=f) and the recalculated value is greater than 4.0.
- (c) **Parameters for Group 2A without a recovery device.** An owner or operator of a Group 2A process vent maintaining a TRE index value greater than 1.0 without using a recovery device shall report the information specified in the approved plan under [§ 65.63(d)](/cfr/40/65.63.md?p=d).

## Notes

### Authority

Authority: 42 U.S.C. 7401 et seq.

### Source

Source: 65 FR 78285, Dec. 14, 2000, unless otherwise noted.
