---
kind: "section"
citation: "40 C.F.R. § 63.7902"
title: "40"
number: "63.7902"
heading: "What are my inspection and monitoring requirements for containers?"
url: "https://uscodex.org/cfr/40/63.7902"
---

# §63.7902. What are my inspection and monitoring requirements for containers?

- (a) You must inspect each container using Container Level 1 or Container Level 2 controls according to the requirements in [§ 63.926(a)](/cfr/40/63.926.md?p=a).
- (b) If you use Container Level 3 controls, you must meet requirements in paragraphs [(b)(1)](#b-1) and [(2)](#b-2) of this section, as applicable to your site remediation.
  - (1) You must perform the verification procedure for each permanent total enclosure annually according to the requirements in [§ 63.924(c)(1)](/cfr/40/63.924.md?p=c-1).
  - (2) You must monitor and inspect each closed vent system and control device according to the requirements in [§ 63.7927](/cfr/40/63.7927.md) that apply to you.

## Notes

### Source

Source: 68 FR 58190, Oct. 8, 2003, unless otherwise noted.

### Authority

Authority: 42 U.S.C. 7401 et seq.

### Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.
