# §63.7885. What are the general standards I must meet for my affected process vents?

- (a) For the process vents that comprise the affected source designated under [§ 63.7882](/cfr/40/63.7882.md), you must select and meet the requirements under one of the options specified in [paragraph (b)](#b) of this section.
- (b) For each affected process vent, except as exempted under [paragraph (c)](#c) of this section, you must meet one of the options in [paragraphs (b)(1) through (3)](#b-1..b-3) of this section.
  - (1) You control HAP emissions from the affected process vents according to the standards specified in [§§ 63.7890 through 63.7893](/cfr/40/63.7890..63.7893.md).
  - (2) You determine for the remediation material treated or managed by the process vented through the affected process vents that the average total volatile organic hazardous air pollutant (VOHAP) concentration, as defined in [§ 63.7957](/cfr/40/63.7957.md), of this material is less than 10 parts per million by weight (ppmw). Determination of the VOHAP concentration is made using the procedures specified in [§ 63.7943](/cfr/40/63.7943.md).
  - (3) If the process vent is also subject to another subpart under 40 CFR part [61](/cfr/40/part61.md) or [40](/cfr/40/part40.md) CFR [part 63](/cfr/40/part63.md), you control emissions of the HAP listed in Table 1 of this subpart from the affected process vent in compliance with the standards specified in the applicable subpart. This means you are complying with all applicable emissions limitations and work practice standards under the other subpart (e.g., you install and operate the required air pollution controls or have implemented the required work practice to reduce HAP emissions to levels specified by the applicable subpart). This provision does not apply to any exemption of the affected source from the emissions limitations and work practice standards allowed by the other applicable subpart.
- (c) A process vent that meets the exemption requirements in paragraphs [(c)(1)](#c-1) and [(2)](#c-2) of this section is exempted from the requirements in [paragraph (b)](#b) of this section.
  - (1) The process vent stream exiting the process vent meets the conditions in either paragraph [(c)(1)(i)](#c-1-i) or [(ii)](#c-1-ii) of this section.
    - (i) The process vent stream flow rate is less than 0.005 cubic meters per minute (m 3/min) at standard conditions (as defined in [40 CFR 63.2](/cfr/40/63.2.md)); or
    - (ii) The process vent stream flow rate is less than 6.0 m 3/min at standard conditions (as defined in [40 CFR 63.2](/cfr/40/63.2.md)) and the total concentration of HAP listed in Table 1 of this subpart is less than 20 parts per million by volume (ppmv).
  - (2) You must demonstrate that the process vent stream meets the applicable exemption conditions in [paragraph (c)(1)](#c-1) of this section using the procedures specified in [§ 63.694(m)](/cfr/40/63.694.md?p=m). You must prepare and maintain documentation at your facility to support your determination of the process vent stream flow rate. This documentation must include identification of each process vent exempted under this paragraph and the test results used to determine the process vent stream flow rate and total HAP concentration, as applicable to the exemption conditions for your process vent. You must perform a new determination of the process vent stream flow rate and total HAP concentration, as applicable to the exemption conditions for your process vent, whenever changes to operation of the unit on which the process vent is used could cause the process vent stream conditions to exceed the maximum limits of the exemption.

# §63.7886. What are the general standards I must meet for my affected remediation material management units?

- (a) For each remediation material management unit that is part of an affected source designated by [§ 63.7882](/cfr/40/63.7882.md), you must select and meet the requirements under one of the options specified in [paragraph (b)](#b) of this section except for those remediation material management units exempted under paragraph [(c)](#c) or [(d)](#d) of this section.
- (b) For each affected remediation material management unit, you must meet one of the options in [paragraphs (b)(1) through (4)](#b-1..b-4) of this section.
  - (1) You control HAP emissions from the affected remediation material management unit according to the standards specified in [paragraphs (b)(1)(i) through (v)](#b-1-i..b-1-v) of this section, as applicable to the unit.
    - (i) If the remediation material management unit is a tank, then you control HAP emissions according to the standards specified in [§§ 63.7895 through 63.7898](/cfr/40/63.7895..63.7898.md).
    - (ii) If the remediation material management unit is a container, then you control HAP emissions according to the standards specified in [§§ 63.7900 through 63.7903](/cfr/40/63.7900..63.7903.md).
    - (iii) If the remediation material management unit is a surface impoundment, then you control HAP emissions according to the standards specified in [§§ 63.7905 through 63.7908](/cfr/40/63.7905..63.7908.md).
    - (iv) If the remediation material management unit is an oil-water or organic-water separator, then you control HAP emissions according to the standards specified in [§§ 63.7910 through 63.7913](/cfr/40/63.7910..63.7913.md).
    - (v) If the remediation material management unit is a transfer system, then you control HAP emissions according to the standards specified in [§§ 63.7915 through 63.7918](/cfr/40/63.7915..63.7918.md).
  - (2) You determine that the average total VOHAP concentration, as defined in [§ 63.7957](/cfr/40/63.7957.md), of the remediation material managed in the remediation material management unit material is less than 500 ppmw. You must follow the requirements in [§ 63.7943](/cfr/40/63.7943.md) to demonstrate that the VOHAP concentration of the remediation material is less than 500 ppmw. Once the VOHAP concentration for a remediation material has been determined to be less than 500 ppmw, all remediation material management units downstream from the point of determination managing this material meet the requirements of this paragraph unless a remediation process is used that concentrates all, or part of, the remediation material being managed in the unit such that the VOHAP concentration of the material could increase. Any free product returned to the manufacturing process (e.g., recovered oil returned to a storage tank at a refinery) is no longer subject to this subpart.
  - (3) If the remediation material management unit is also subject to another subpart under 40 CFR part [61](/cfr/40/part61.md) or [40](/cfr/40/part40.md) CFR [part 63](/cfr/40/part63.md), you control emissions of the HAP listed in Table 1 of this subpart from the affected remediation material management unit in compliance with the standards specified in the applicable subpart. This means you are complying with all applicable emissions limitations and work practice standards under the other subpart (e.g., you install and operate the required air pollution controls or have implemented the required work practice to reduce HAP emissions to levels specified by the applicable subpart). This provision does not apply to any exemption of the affected source from the emissions limitations and work practice standards allowed by the other applicable subpart.
  - (4) If the remediation material management unit is an open tank or surface impoundment used for a biological treatment process, you meet the requirements as specified in paragraphs [(b)(4)(i)](#b-4-i) and [(ii)](#b-4-ii) of this section.
    - (i) You demonstrate that the biological treatment process conducted in the open tank or surface impoundment meets the performance levels specified in either § [63.684(b)(4)(i)](/cfr/40/63.684.md?p=b-4-i) or [(ii)](/cfr/40/63.684.md?p=b-4-ii).
    - (ii) You monitor the biological treatment process conducted in the open tank or surface impoundment according to the requirements in [§ 63.684(e)(4)](/cfr/40/63.684.md?p=e-4).
- (c) A remediation material management unit is exempted from the requirements in [paragraph (b)](#b) of this section if this unit is used for cleanup of radioactive mixed waste, as defined in [§ 63.7957](/cfr/40/63.7957.md), that is subject to applicable regulations, directives, and other requirements under the Atomic Energy Act, the Nuclear Waste Policy Act, or the Waste Isolation Pilot Plant Land Withdrawal Act.
- (d) One or a combination of remediation material management units may be exempted at your discretion from the requirements in [paragraph (b)](#b) of this section provided that the total annual quantity of HAP listed in Table 1 of this subpart contained in the remediation material placed in all of the remediation material management units exempted under this paragraph is less than 1 Mg/yr. For each remediation material management unit you select to be exempted under this provision, you must meet the requirements in paragraphs [(d)(1)](#d-1) and [(2)](#d-2) of this section.
  - (1) You must designate each of the remediation material management units you are selecting to be exempted under this paragraph by either submitting to the Administrator a written notification identifying the exempt units or permanently marking the exempt units at the faculty site. If you choose to prepare and submit a written notification, this notification must include a site plan, process diagram, or other appropriate documentation identifying each of the exempt units. If you choose to permanently mark the exempt units, each exempt unit must be marked in such a manner that it can be readily identified as an exempt unit from the other remediation material management units located at the site.
  - (2) You must prepare an initial determination of the total annual HAP quantity in the remediation material placed in the units exempted under this paragraph. This determination is based on the total quantity of the HAP listed in Table 1 of this subpart as determined at the point where the remediation material is placed in each exempted unit. You must perform a new determination whenever the extent of changes to the quantity or composition of the remediation material placed in the exempted units could cause the total annual HAP content in the remediation material to exceed 1 Mg/yr. You must maintain documentation to support the most recent determination of the total annual HAP quantity. This documentation must include the basis and data used for determining the organic HAP content of the remediation material.

# §63.7887. What are the general standards I must meet for my affected equipment leak sources?

- (a) You must control HAP emissions from equipment leaks from each equipment component that is part of the affected source by implementing leak detection and control measures according to the standards specified in [§§ 63.7920 through 63.7922](/cfr/40/63.7920..63.7922.md) unless you elect to meet the requirements in [paragraph (b)](#b) of this section.
- (b) If the affected equipment leak source is also subject to another subpart in 40 CFR part [61](/cfr/40/part61.md) or [40](/cfr/40/part40.md) CFR [part 63](/cfr/40/part63.md), you may control emissions of the HAP listed in Table 1 to this subpart from the affected equipment leak source in compliance with the standards specified in the other applicable subpart. This means you are complying with all applicable emissions limitations and work practice standards under the other subpart (e.g., you implement leak detection and control measures to reduce HAP emissions as specified by the applicable subpart). This provision does not apply to any exemption of the affected source from the emissions limitations and work practice standards allowed by the other applicable subpart.

# §63.7888. How do I implement this rule at my facility using the cross-referenced requirements in other subparts?

- (a) For the purposes of this subpart, when you read the term “HAP listed in Table 1 of this subpart” in a cross-referenced section under [40 CFR part 63](/cfr/40/part63.md), [subpart DD](/cfr/40/subpartDD.md)—National Emission Standards for Hazardous Air Pollutants from Off-Site Waste and Recovery Operations, you should refer to Table 1 of this subpart.
- (b) For the purposes of this subpart, when you read the term off-site material in a cross-referenced section under [40 CFR part 63](/cfr/40/part63.md), [subpart DD](/cfr/40/subpartDD.md)—National Emission Standards for Hazardous Air Pollutants from Off-Site Waste and Recovery Operations you should substitute the term remediation material, as defined in [§ 63.7957](/cfr/40/63.7957.md).
- (c) For the purposes of this subpart, when you read the term regulated material in a cross-referenced section under [40 CFR part 63](/cfr/40/part63.md), subparts [OO](/cfr/40/subpartOO.md), [PP](/cfr/40/subpartPP.md), QQ, RR, TT, UU, WW, and VV you should substitute the term remediation material, as defined in [§ 63.7957](/cfr/40/63.7957.md).

# §63.7890. What emissions limitations and work practice standards must I meet for process vents?

- (a) You must control HAP emissions from each new and existing process vent subject to [§ 63.7885(b)(1)](/cfr/40/63.7885.md?p=b-1) according to emissions limitations and work practice standards in this section that apply to your affected process vents.
- (b) For your affected process vents, you must meet one of the facility-wide emission limit options specified in [paragraphs (b)(1) through (4)](#b-1..b-4) of this section. If you have multiple affected process vent streams, you may comply with this paragraph using a combination of controlled and uncontrolled process vent streams that achieve the facility-wide emission limit that applies to you.
  - (1) Reduce from all affected process vents the total emissions of the HAP listed in Table 1 of this subpart to a level less than 1.4 kilograms per hour (kg/hr) and 2.8 Mg/yr (3.0 pounds per hour (lb/hr) and 3.1 tpy); or
  - (2) Reduce from all affected process vents the emissions of total organic compounds (TOC) (minus methane and ethane) to a level below 1.4 kg/hr and 2.8 Mg/yr (3.0 lb/hr and 3.1 tpy); or
  - (3) Reduce from all affected process vents the total emissions of the HAP listed in Table 1 of this subpart by 95 percent by weight or more; or
  - (4) Reduce from all affected process vents the emissions of TOC (minus methane and ethane) by 95 percent by weight or more.
- (c) For each closed vent system and control device you use to comply with [paragraph (b)](#b) of this section, you must meet the operating limit requirements and work practice standards in [§ 63.7925(c) through (j)](/cfr/40/63.7925.md?p=c..j) that apply to your closed vent system and control device.

# §63.7891. How do I demonstrate initial compliance with the emissions limitations and work practice standards for process vents?

- (a) You must demonstrate initial compliance with the emissions limitations and work practice standards in [§ 63.7890(b)](/cfr/40/63.7890.md?p=b) applicable to your affected process vents by meeting the requirements in [paragraphs (b) through (d)](#b..d) of this section.
- (b) You have measured or determined using the procedures for performance tests and design evaluations in [§ 63.7941](/cfr/40/63.7941.md) that emission levels from all of your affected process vents meet the facility-wide emission limits in [§ 63.7890(b)](/cfr/40/63.7890.md?p=b) that apply to you, as follows in [paragraphs (b)(1) through (4)](#b-1..b-4) of this section.
  - (1) If you elect to meet [§ 63.7890(b)(1)](/cfr/40/63.7890.md?p=b-1), you demonstrate that the total emissions of the HAP listed in Table 1 of this subpart from all affected process vents at your facility are less than 1.4 kg/hr and 2.8 Mg/yr (3.0 lb/hr and 3.1 tpy).
  - (2) If you elect to meet [§ 63.7890(b)(2)](/cfr/40/63.7890.md?p=b-2), you demonstrate that emissions of TOC (minus methane and ethane) from all affected process vents at your facility are less than 1.4 kg/hr and 2.8 Mg/yr (3.0 lb/hr and 3.1 tpy).
  - (3) If you elect to meet [§ 63.7890(b)(3)](/cfr/40/63.7890.md?p=b-3), you demonstrate that the total emissions of the HAP listed in Table 1 of this subpart from all affected process vents are reduced by 95 percent by weight or more.
  - (4) If you elect to meet [§ 63.7890(b)(4)](/cfr/40/63.7890.md?p=b-4), you demonstrate that the emissions of TOC (minus methane and ethane) from all affected process vents are reduced by 95 percent by weight or more.
- (c) For each closed vent system and control device you use to comply with [§ 63.7890(b)](/cfr/40/63.7890.md?p=b), you have met each requirement for demonstrating initial compliance with the emission limitations and work practice standards for a closed vent system and control device in [§ 63.7926](/cfr/40/63.7926.md).
- (d) You have submitted a notification of compliance status according to the requirements in [§ 63.7950](/cfr/40/63.7950.md).

# §63.7892. What are my inspection and monitoring requirements for process vents?


For each closed vent system and control device you use to comply with [§ 63.7890(b)](/cfr/40/63.7890.md?p=b), you must monitor and inspect the closed vent system and control device according to the requirements in [§ 63.7927](/cfr/40/63.7927.md) that apply to you.


# §63.7893. How do I demonstrate continuous compliance with the emissions limitations and work practice standards for process vents?

- (a) You must demonstrate continuous compliance with the emissions limitations and work practice standards in [§ 63.7890](/cfr/40/63.7890.md) applicable to your affected process vents by meeting the requirements in [paragraphs (b) through (d)](#b..d) of this section.
- (b) You must maintain emission levels from all of your affected process vents to meet the facilitywide emission limits in [§ 63.7890(b)](/cfr/40/63.7890.md?p=b) that apply to you, as specified in [paragraphs (b)(1) through (4)](#b-1..b-4) of this section.
  - (1) If you elect to meet [§ 63.7890(b)(1)](/cfr/40/63.7890.md?p=b-1), you maintain the total emissions of the HAP listed in Table 1 of this subpart from all affected process vents at your facility are less than 1.4 kg/hr and 2.8 Mg/yr (3.0 lb/hr and 3.1 tpy).
  - (2) If you elect to meet [§ 63.7890(b)(2)](/cfr/40/63.7890.md?p=b-2), you maintain emissions of TOC (minus methane and ethane) from all affected process vents at your facility are less than 1.4 kg/hr and 2.8 Mg/yr (3.0 lb/hr and 3.1 tpy).
  - (3) If you elect to meet [§ 63.7890(b)(3)](/cfr/40/63.7890.md?p=b-3), you maintain the total emissions of the HAP listed in Table 1 of this subpart from all affected process vents are reduced by 95 percent by weight or more.
  - (4) If you elect to meet [§ 63.7890(b)(4)](/cfr/40/63.7890.md?p=b-4), you maintain that the emissions of TOC (minus methane and ethane) from all affected process vents are reduced by 95 percent by weight or more.
- (c) For each closed vent system and control device you use to comply with [§ 63.7890(b)](/cfr/40/63.7890.md?p=b), you have met each requirement for demonstrating continuous compliance with the emission limitations and work practice standards for a closed vent system and control device in [§ 63.7928](/cfr/40/63.7928.md).
- (d) Keeping records to document continuous compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).

# §63.7895. What emissions limitations and work practice standards must I meet for tanks?

- (a) You must control HAP emissions from each new and existing tank subject to [§ 63.7886(b)(1)(i)](/cfr/40/63.7886.md?p=b-1-i) according to emissions limitations and work practice standards in this section that apply to your affected tanks.
- (b) For each affected tank, you must install and operate air pollution controls that meet the requirements in [paragraphs (b)(1) through (4)](#b-1..b-4) of this section that apply to your tank.
  - (1) Unless your tank is used for a waste stabilization process, as defined in [§ 63.7957](/cfr/40/63.7957.md), you must determine the maximum HAP vapor pressure (expressed in kilopascals (kPa)) of the remediation material placed in your tank using the procedures specified in [§ 63.7944](/cfr/40/63.7944.md).
  - (2) If the maximum HAP vapor pressure of the remediation material you place in your tank is less than 76.6 kPa, then you must determine which tank level controls (i.e., Tank Level 1 or Tank Level 2) apply to your tank as shown in Table 2 of this subpart, and based on your tank's design capacity (expressed in cubic meters (m 3)) and the maximum HAP vapor pressure of the remediation material you place in this tank. If your tank is required by Table 2 of this subpart to use Tank Level 1 controls, then you must meet the requirements in [paragraph (c)](#c) of this section. If your tank is required by Table 2 of this subpart to use Tank Level 2 controls, then you must meet the requirements in [paragraph (d)](#d) of this section
  - (3) If maximum HAP vapor pressure of the remediation material you place in your tank is 76.6 kPa or greater, then the tank must use one of the Tank Level 2 controls specified in [paragraphs (d)(3) through (5)](#d-3..d-5) of this section. Use of floating roofs under paragraph [(d)(1)](#d-1) or [(2)](#d-2) of this section is not allowed for tanks managing these remediation materials.
  - (4) A tank used for a waste stabilization process, as defined in [§ 63.7957](/cfr/40/63.7957.md), must use one of Tank Level 2 controls, as specified in [paragraph (d)](#d) of this section, that is appropriate for your waste stabilization process.
- (c) If you use Tank Level 1 controls, you must install and operate a fixed roof according to the requirements in [§ 63.902](/cfr/40/63.902.md), with the exceptions specified in paragraphs [(c)(1)](#c-1) and [(2)](#c-2) of this section. As an alternative to using this fixed roof, you may choose to use one of Tank Level 2 controls in [paragraph (d)](#d) of this section.
  - (1) Where [§ 63.902(c)(2)](/cfr/40/63.902.md?p=c-2) provides an exception for a spring-loaded pressure-vacuum relief valve, conservation vent, or similar type of pressure relief device which vents to the atmosphere, for any source for the purposes of this subpart, only a conservation vent is eligible for the exception after January 6, 2021. If your initial startup date is after September 3, 2019, the exception for a spring-loaded pressure-vacuum relief valve, conservation vent, or similar type of pressure relief device does not apply, with the exception of a conservation vent, for the purposes of this subpart after July 10, 2020.
  - (2) The provisions of [§ 63.902(c)(3)](/cfr/40/63.902.md?p=c-3) do not apply for the purposes of this subpart if your initial startup date is after September 3, 2019; for any source the provisions of [§ 63.902(c)(3)](/cfr/40/63.902.md?p=c-3) do not apply for the purposes of this subpart after January 6, 2021.
- (d) If you use Tank Level 2 controls, you must meet the requirements of one of the options in [paragraphs (d)(1) through (5)](#d-1..d-5) of this section.
  - (1) Install and operate a fixed roof with an internal floating roof according to the requirements in § [63.1063(a)(1)(i)](/cfr/40/63.1063.md?p=a-1-i), [(a)(2)](/cfr/40/63.1063.md?p=a-a-2), and [(b)](/cfr/40/63.1063.md?p=a-a-b); or
  - (2) Install and operate an external floating roof according to the requirements in § [63.1063(a)(1)(ii)](/cfr/40/63.1063.md?p=a-1-ii), [(a)(2)](/cfr/40/63.1063.md?p=a-a-2), and [(b)](/cfr/40/63.1063.md?p=a-a-b); or
  - (3) Install and operate a fixed roof vented through a closed vent system to a control device according to the requirements in [§ 63.685(g)](/cfr/40/63.685.md?p=g). You must meet the emissions limitations and work practice standards in [§ 63.7925](/cfr/40/63.7925.md) that apply to your closed vent system and control device; or
  - (4) Install and operate a pressure tank according to the requirements in [§ 63.685(h)](/cfr/40/63.685.md?p=h); or
  - (5) Locate the tank inside a permanent total enclosure and vent emissions from the enclosure through a closed vent system to a control device that is an enclosed combustion device according to the requirements in [§ 63.685(i)](/cfr/40/63.685.md?p=i). You must meet the emissions limitations and work practice standards in [§ 63.7925](/cfr/40/63.7925.md) that apply to your closed vent system and control device.
- (e) As provided in [§ 63.6(g)](/cfr/40/63.6.md?p=g), you may request approval from the EPA to use an alternative to the work practice standards in this section that apply to your tanks. If you request for permission to use an alternative to the work practice standards, you must submit the information described in [§ 63.6(g)(2)](/cfr/40/63.6.md?p=g-2).

# §63.7896. How do I demonstrate initial compliance with the emissions limitations and work practice standards for tanks?

- (a) You must demonstrate initial compliance with the emissions limitations and work practice standards in [§ 63.7895](/cfr/40/63.7895.md) that apply to your affected tanks by meeting the requirements in [paragraphs (b) through (h)](#b..h) of this section, as applicable to your containers.
- (b) You have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(b)(1)](#b-1) and [(2)](#b-2) of this section.
  - (1) You have determined the applicable tank control levels specified in [§ 63.7895(b)](/cfr/40/63.7895.md?p=b) for the tanks to be used for your site remediation.
  - (2) You have determined, according to the procedures in [§ 63.7944](/cfr/40/63.7944.md), and recorded the maximum HAP vapor pressure of the remediation material placed in each affected tank subject to [§ 63.7886(b)(1)(i)](/cfr/40/63.7886.md?p=b-1-i) that does not use Tank Level 2 controls.
- (c) You must demonstrate initial compliance of each tank determined under [paragraph (b)](#b) of this section to require Tank Level 1 controls if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in [paragraphs (c)(1) through (3)](#c-1..c-3) of this section.
  - (1) Each tank using Tank Level 1 controls is equipped with a fixed roof and closure devices according to the requirements in § [63.902(b)](/cfr/40/63.902.md?p=b) and [(c)](/cfr/40/63.902.md?p=c), with the exceptions specified in § [63.7895(c)(1)](/cfr/40/63.7895.md?p=c-1) and [(2)](/cfr/40/63.7895.md?p=c-2), and you have records documenting the design.
  - (2) You have performed an initial visual inspection of the fixed roof and closure devices for defects according to the requirements in [§ 63.906(a)](/cfr/40/63.906.md?p=a) and you have records documenting the inspection results.
  - (3) You will operate the fixed roof and closure devices according to the requirements in [§ 63.902](/cfr/40/63.902.md), with the exceptions specified in § [63.7895(c)(1)](/cfr/40/63.7895.md?p=c-1) and [(2)](/cfr/40/63.7895.md?p=c-2).
- (d) You must demonstrate initial compliance of each tank determined under [paragraph (b)](#b) of this section to require Tank Level 2 controls and using a fixed roof with an internal floating roof according to [§ 63.7895(d)(1)](/cfr/40/63.7895.md?p=d-1) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in [paragraphs (d)(1) through (3)](#d-1..d-3) of this section.
  - (1) Each tank is equipped with an internal floating roof that meets the requirements in [§ 63.1063(a)](/cfr/40/63.1063.md?p=a) and you have records documenting the design.
  - (2) You will operate the internal floating roof according to the requirements in [§ 63.1063(b)](/cfr/40/63.1063.md?p=b).
  - (3) You have performed an initial visual inspection according to the requirements in [§ 63.1063(d)(1)](/cfr/40/63.1063.md?p=d-1) and you have a record of the inspection results.
- (e) You must demonstrate initial compliance of each tank determined under [paragraph (b)](#b) of this section to require Tank Level 2 controls and using an external floating roof according to [§ 63.7895(d)(2)](/cfr/40/63.7895.md?p=d-2) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in [paragraphs (e)(1) through (3)](#e-1..e-3) of this section.
  - (1) Each tank is equipped with an external floating roof that meets the requirements in [§ 63.1063(a)](/cfr/40/63.1063.md?p=a) and you have records documenting the design.
  - (2) You will operate the external floating roof according to the requirements in [§ 63.1063(b)](/cfr/40/63.1063.md?p=b).
  - (3) You have performed an initial seal gap measurement inspection according to the requirements in [§ 63.1063(d)(3)](/cfr/40/63.1063.md?p=d-3) and you have records of the measurement results.
- (f) You must demonstrate initial compliance of each tank determined under [paragraph (b)](#b) of this section to require Tank Level 2 controls and using a fixed roof vented to a control device according to [§ 63.7895(d)(3)](/cfr/40/63.7895.md?p=d-3) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in [paragraphs (f)(1) through (4)](#f-1..f-4) of this section.
  - (1) Each tank is equipped with a fixed roof and closure devices according to the requirements in [§ 63.685(g)](/cfr/40/63.685.md?p=g), with the exceptions specified in § [63.7895(c)(1)](/cfr/40/63.7895.md?p=c-1) and [(2)](/cfr/40/63.7895.md?p=c-2), and you have records documenting the design.
  - (2) You have performed an initial visual inspection of fixed roof and closure devices for defects according to the requirements in [§ 63.695(b)(3)](/cfr/40/63.695.md?p=b-3) and you have records documenting the inspection results.
  - (3) You will operate the fixed roof and closure devices according to the requirements in [§ 63.685(g)](/cfr/40/63.685.md?p=g).
  - (4) You have met each applicable requirement for demonstrating initial compliance with the emission limitations and work practice standards for a closed vent system and control device in [§ 63.7926](/cfr/40/63.7926.md).
- (g) You must demonstrate initial compliance of each tank determined under [paragraph (b)](#b) of this section to require Tank Level 2 controls and operates as a pressure tank according to [§ 63.7895(d)(4)](/cfr/40/63.7895.md?p=d-4) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(g)(1)](#g-1) and [(2)](#g-2) of this section.
  - (1) Each tank is designed to operate as a pressure tank according to the requirements in [§ 63.685(h)](/cfr/40/63.685.md?p=h), and you have records documenting the design.
  - (2) You will operate the pressure tank and according to the requirements in [§ 63.685(h)](/cfr/40/63.685.md?p=h).
- (h) You must demonstrate initial compliance of each tank determined under [paragraph (b)](#b) of this section to require Tank Level 2 controls and using a permanent total enclosure vented to an enclosed combustion device according to [§ 63.7895(d)(5)](/cfr/40/63.7895.md?p=d-5) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(h)(1)](#h-1) and [(2)](#h-2) of this section.
  - (1) You have submitted as part of your notification of compliance status a signed statement that you have performed the verification procedure according to the requirements in [§ 63.685(i)](/cfr/40/63.685.md?p=i), and you have records of the supporting calculations and measurements.
  - (2) You have met each applicable requirement for demonstrating initial compliance with the emission limitations and work practice standards for a closed vent system and control device in [§ 63.7926](/cfr/40/63.7926.md).

# §63.7897. What are my inspection and monitoring requirements for tanks?

- (a) You must visually inspect each of your tanks using Tank Level 1 controls for defects at least annually according to the requirements in [§ 63.906(a)](/cfr/40/63.906.md?p=a).
- (b) You must inspect and monitor each of your tanks using Tank Level 2 controls according to the requirements in [paragraphs (b)(1) through (5)](#b-1..b-5), as applicable to your tanks.
  - (1) If you use a fixed roof with an internal floating roof according to [§ 63.7895(d)(1)](/cfr/40/63.7895.md?p=d-1), you must visually inspect the fixed roof and internal floating roof according to the requirements in § [63.1063(d)(1)](/cfr/40/63.1063.md?p=d-1) and [(2)](/cfr/40/63.1063.md?p=d-2).
  - (2) If you use an external floating roof according to [§ 63.7895(d)(2)](/cfr/40/63.7895.md?p=d-2), you must visually inspect the external floating roof according to the requirements in [§ 63.1063(d)(1)](/cfr/40/63.1063.md?p=d-1) and inspect the seals according to the requirements in § [63.1063(d)(2)](/cfr/40/63.1063.md?p=d-2) and [(3)](/cfr/40/63.1063.md?p=d-3).
  - (3) If you use a fixed roof vented to a control device according to [§ 63.7895(d)(3)](/cfr/40/63.7895.md?p=d-3), you must meet requirements in paragraphs [(b)(3)(i)](#b-3-i) and [(ii)](#b-3-ii) of this section.
    - (i) You must visually inspect the fixed roof and closure devices for defects according to the requirements in [§ 63.695(b)(3)](/cfr/40/63.695.md?p=b-3).
    - (ii) You must monitor and inspect the closed vent system and control device according to the requirements in [§ 63.7927](/cfr/40/63.7927.md) that apply to you.
  - (4) If you use a pressure tank according to [§ 63.7895(d)(4)](/cfr/40/63.7895.md?p=d-4), you must visually inspect the tank and its closure devices for defects at least annually to ensure they are operating according to the design requirements in [§ 63.685(h)](/cfr/40/63.685.md?p=h).
  - (5) If you use a permanent total enclosure vented to an enclosed combustion device according to [§ 63.7895(d)(5)](/cfr/40/63.7895.md?p=d-5), you must meet requirements in paragraphs [(b)(5)(i)](#b-5-i) and [(ii)](#b-5-ii) of this section.
    - (i) You must perform the verification procedure for the permanent total enclosure at least annually according to the requirements in [§ 63.685(i)](/cfr/40/63.685.md?p=i).
    - (ii) You must monitor and inspect the closed vent system and control device according to the requirements in [§ 63.7927](/cfr/40/63.7927.md) that apply to you.

# §63.7898. How do I demonstrate continuous compliance with the emissions limitations and work practice standards for tanks?

- (a) You must demonstrate continuous compliance with the emissions limitations and work practice standards in [§ 63.7895](/cfr/40/63.7895.md) applicable to your affected tanks by meeting the requirements in [paragraphs (b) through (d)](#b..d) of this section.
- (b) You must demonstrate continuous compliance with the requirement to determine the applicable tank control level specified in [§ 63.7895(b)](/cfr/40/63.7895.md?p=b) for each affected tank by meeting the requirements in [paragraphs (b)(1) through (3)](#b-1..b-3) of this section.
  - (1) Keeping records of the tank design capacity according to the requirements in [§ 63.1065(a)](/cfr/40/63.1065.md?p=a).
  - (2) For tanks subject to [§ 63.7886(b)(1)(ii)](/cfr/40/63.7886.md?p=b-1-ii) and not using Tank Level 2 controls, meeting the requirements in paragraphs [(b)(2)(i)](#b-2-i) and [(ii)](#b-2-ii) of this section.
    - (i) Keeping records of the maximum HAP vapor pressure determined according to the procedures in [§ 63.7944](/cfr/40/63.7944.md) for the remediation material placed in each affected tank.
    - (ii) Performing a new determination of the maximum HAP vapor pressure whenever changes to the remediation material managed in the tank could potentially cause the maximum HAP vapor pressure to increase to a level that is equal to or greater than the maximum HAP vapor pressure for the tank design capacity specified in Table 2. You must keep records of each determination.
  - (3) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (c) You must demonstrate continuous compliance for each tank determined to require Tank Level 1 controls by meeting the requirements in [paragraphs (c)(1) through (5)](#c-1..c-5) of this section.
  - (1) Operating and maintaining the fixed roof and closure devices according to the requirements in [§ 63.902(c)](/cfr/40/63.902.md?p=c), with the exceptions specified in § [63.7895(c)(1)](/cfr/40/63.7895.md?p=c-1) and [(2)](/cfr/40/63.7895.md?p=c-2).
  - (2) Visually inspecting the fixed roof and closure devices for defects at least annually according to the requirements in [§ 63.906(a)](/cfr/40/63.906.md?p=a).
  - (3) Repairing defects according to the requirements in [§ 63.63.906(b)](/cfr/40/63.63.906.md?p=b).
  - (4) Recording the information specified in § [63.907(a)(3)](/cfr/40/63.907.md?p=a-3) and [(b)](/cfr/40/63.907.md?p=a-b).
  - (5) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (d) You must demonstrate continuous compliance for each tank determined to require Tank Level 2 controls and using a fixed roof with an internal floating roof according to [§ 63.7895(d)(1)](/cfr/40/63.7895.md?p=d-1) by meeting the requirements in [paragraphs (d)(1) through (5)](#d-1..d-5) of this section.
  - (1) Operating and maintaining the internal floating roof according to the requirements in [§ 63.1063(b)](/cfr/40/63.1063.md?p=b).
  - (2) Visually inspecting the internal floating roof according to the requirements in § [63.1063(d)(1)](/cfr/40/63.1063.md?p=d-1) and [(2)](/cfr/40/63.1063.md?p=d-2).
  - (3) Repairing defects according to the requirements in [§ 63.1063(e)](/cfr/40/63.1063.md?p=e).
  - (4) Recording the information specified in [§ 63.1065(b) through (d)](/cfr/40/63.1065.md?p=b..d).
  - (5) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (e) You must demonstrate continuous compliance for each tank determined to require Tank Level 2 controls and using an external floating roof according to [§ 63.7895(d)(2)](/cfr/40/63.7895.md?p=d-2) by meeting the requirements in [paragraphs (e)(1) through (5)](#e-1..e-5) of this section.
  - (1) Operating and maintaining the external floating roof according to the requirements in [§ 63.1063(b)](/cfr/40/63.1063.md?p=b).
  - (2) Visually inspecting the external floating roof according to the requirements in [§ 63.1063(d)(1)](/cfr/40/63.1063.md?p=d-1) and inspecting the seals according to the requirements in § [63.1063(d)(2)](/cfr/40/63.1063.md?p=d-2) and [(3)](/cfr/40/63.1063.md?p=d-3).
  - (3) Repairing defects according to the requirements in [§ 63.1063(e)](/cfr/40/63.1063.md?p=e).
  - (4) Recording the information specified in [§ 63.1065(b) through (d)](/cfr/40/63.1065.md?p=b..d).
  - (5) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (f) You must demonstrate continuous compliance for each tank determined to require Tank Level 2 controls and using a fixed roof vented to a control device according to [§ 63.7895(d)(3)](/cfr/40/63.7895.md?p=d-3) by meeting the requirements in [paragraphs (f)(1) through (6)](#f-1..f-6) of this section.
  - (1) Operating and maintaining the fixed roof and closure devices according to the requirements in [§ 63.685(g)](/cfr/40/63.685.md?p=g).
  - (2) Visually inspecting the fixed roof and closure devices for defects at least annually according to the requirements in [§ 63.695(b)(3)(i)](/cfr/40/63.695.md?p=b-3-i).
  - (3) Repairing defects according to the requirements in [§ 63.695(b)(4)](/cfr/40/63.695.md?p=b-4).
  - (4) Recording the information specified in [§ 63.696(e)](/cfr/40/63.696.md?p=e).
  - (5) Meeting each applicable requirement for demonstrating continuous compliance with the emission limitations and work practice standards for a closed vent system and control device in [§ 63.7928](/cfr/40/63.7928.md).
  - (6) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (g) You must demonstrate continuous compliance for each tank determined to require Tank Level 2 controls and operated as a pressure tank according to [§ 63.7895(d)(4)](/cfr/40/63.7895.md?p=d-4) by meeting the requirements in [paragraphs (g)(1) through (3)](#g-1..g-3) of this section.
  - (1) Operating and maintaining the pressure tank and closure devices according to the requirements in [§ 63.685(h)](/cfr/40/63.685.md?p=h).
  - (2) Visually inspecting each pressurized tank and closure devices for defects at least annually to ensure they are operating according to the design requirements in [§ 63.685(h)](/cfr/40/63.685.md?p=h), and recording the results of each inspection.
  - (3) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (h) You must demonstrate continuous compliance for each tank determined to require Tank Level 2 controls and using a permanent total enclosure vented to an enclosed combustion device according to [§ 63.7895(d)(5)](/cfr/40/63.7895.md?p=d-5) by meeting the requirements in [paragraphs (h)(1) through (4)](#h-1..h-4) of this section.
  - (1) Performing the verification procedure for the enclosure annually according to the requirements in [§ 63.685(i)](/cfr/40/63.685.md?p=i).
  - (2) Recording the information specified in [§ 63.696(f)](/cfr/40/63.696.md?p=f).
  - (3) Meeting each applicable requirement for demonstrating continuous compliance with the emissions limitations and work practice standards for a closed vent system and control device in [§ 63.7928](/cfr/40/63.7928.md).
  - (4) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).

# §63.7900. What emissions limitations and work practice standards must I meet for containers?

- (a) You must control HAP emissions from each new and existing container subject to [§ 63.7886(b)(1)(ii)](/cfr/40/63.7886.md?p=b-1-ii) according to emissions limitations and work practice standards in this section that apply to your affected containers.
- (b) For each container having a design capacity greater than 0.1 m 3 you must meet the requirements in paragraph [(b)(1)](#b-1) or [(2)](#b-2) of this section that apply to your container except at the times the container is used for treatment of remediation material by a waste stabilization process, as defined in [§ 63.7957](/cfr/40/63.7957.md). As an alternative for any container subject to this paragraph, you may choose to meet the requirements in [paragraph (d)](#d) of this section.
  - (1) If the design capacity of your container is less than or equal to 0.46 m 3, then you must use controls according to the standards for Container Level 1 controls as specified in [§ 63.922](/cfr/40/63.922.md). As an alternative, you may choose to use controls according to either of the standards for Container Level 2 controls as specified in [§ 63.923](/cfr/40/63.923.md). § [63.922(d)(4)](/cfr/40/63.922.md?p=d-4) and [(5)](/cfr/40/63.922.md?p=d-5) do not apply for the purposes of this subpart if your initial startup date is after September 3, 2019; § [63.922(d)(4)](/cfr/40/63.922.md?p=d-4) and [(5)](/cfr/40/63.922.md?p=d-5) do not apply for the purposes of this subpart for any source after January 6, 2021.
  - (2) If the design capacity of your container is greater than 0.46 m3, then you must use controls according to the standards for Container Level 2 controls as specified in [§ 63.923](/cfr/40/63.923.md) except as provided for in [paragraph (b)(3)](#b-3) of this section. § [63.923(d)(4)](/cfr/40/63.923.md?p=d-4) and [(5)](/cfr/40/63.923.md?p=d-5) do not apply for the purposes of this subpart if your initial startup date is after September 3, 2019; § [63.923(d)(4)](/cfr/40/63.923.md?p=d-4) and [(5)](/cfr/40/63.923.md?p=d-5) do not apply for the purposes of this subpart for any source after January 6, 2021.
  - (3) As an alternative to meeting the standards in [paragraph (b)(2)](#b-2) of this section for containers with a capacity greater than 0.46 m3, if you determine that either of the conditions in paragraph (b)(3)(i) or (ii) apply to the remediation material placed in your container, then you may use controls according to the standards for Container Level 1 controls as specified in [§ 63.922](/cfr/40/63.922.md). § [63.922(d)(4)](/cfr/40/63.922.md?p=d-4) and [(5)](/cfr/40/63.922.md?p=d-5) do not apply for the purposes of this subpart if your initial startup date is after September 3, 2019; § [63.922(d)(4)](/cfr/40/63.922.md?p=d-4) and [(5)](/cfr/40/63.922.md?p=d-5) do not apply for the purposes of this subpart for any source after January 6, 2021.
- (c) At times when a container having a design capacity greater than 0.1 m3 is used for treatment of a remediation material by a waste stabilization process as defined in [§ 63.7957](/cfr/40/63.7957.md), you must control air emissions from the container during the process whenever the remediation material in the container is exposed to the atmosphere according to the standards for Container Level 3 controls as specified in [§ 63.924](/cfr/40/63.924.md). You must meet the emissions limitations and work practice standards in [§ 63.7925](/cfr/40/63.7925.md) that apply to your closed vent system and control device. [§ 63.924(d)](/cfr/40/63.924.md?p=d) does not apply for the purposes of this subpart if your initial startup date is after September 3, 2019; [§ 63.924(d)](/cfr/40/63.924.md?p=d) does not apply for the purposes of this subpart for any source after January 6, 2021.
- (d) As an alternative to meeting the requirements in [paragraph (b)](#b) of this section, you may choose to use controls on your container according to the standards for Container Level 3 controls as specified in [§ 63.924](/cfr/40/63.924.md). You must meet the emissions limitations and work practice standards in [§ 63.7925](/cfr/40/63.7925.md) that apply to your closed vent system and control device. [§ 63.924(d)](/cfr/40/63.924.md?p=d) does not apply for the purposes of this subpart if your initial startup date is after September 3, 2019; [§ 63.924(d)](/cfr/40/63.924.md?p=d) does not apply for the purposes of this subpart for any source after January 6, 2021.
- (e) As provided in [§ 63.6(g)](/cfr/40/63.6.md?p=g), you may request approval from the EPA to use an alternative to the work practice standards in this section that apply to your containers. If you request for permission to use an alternative to the work practice standards, you must submit the information described in [§ 63.6(g)(2)](/cfr/40/63.6.md?p=g-2).

# §63.7901. How do I demonstrate initial compliance with the emissions limitations and work practice standards for containers?

- (a) You must demonstrate initial compliance with the emissions limitations and work practice standards in [§ 63.7900](/cfr/40/63.7900.md) that apply to your affected containers by meeting the requirements in [paragraphs (b) through (e)](#b..e) of this section, as applicable to your containers.
- (b) You have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(b)(1)](#b-1) and [(2)](#b-2) of this section.
  - (1) You have determined the applicable container control levels specified in [§ 63.7900](/cfr/40/63.7900.md) for the containers to be used for your Site Remediation.
  - (2) You have determined and recorded the maximum vapor pressure or total organic concentration for the remediation material placed in containers with a design capacity greater than 0.46 m 3, and do not use Container Level 2 or Level 3 controls.
- (c) You must demonstrate initial compliance of each container determined under [paragraph (b)](#b) of this section to require Container Level 1 controls if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(c)(1)](#c-1) and [(2)](#c-2) of this section.
  - (1) Each container using Container Level 1 controls will be one of the containers specified in [§ 63.922(b)](/cfr/40/63.922.md?p=b).
  - (2) You will operate each container cover and closure device according to the requirements in [§ 63.922(d)](/cfr/40/63.922.md?p=d), with the exceptions specified in [§ 63.7900(b)(1)](/cfr/40/63.7900.md?p=b-1).
- (d) You must demonstrate initial compliance of each container determined under [paragraph (b)](#b) of this section to require Container Level 2 controls if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in [paragraphs (d)(1) through (4)](#d-1..d-4) of this section.
  - (1) Each container using Container Level 2 controls will be one of the containers specified in [§ 63.923(b)](/cfr/40/63.923.md?p=b).
  - (2) You will transfer remediation materials into and out of each container according to the procedures in [§ 63.923(d)](/cfr/40/63.923.md?p=d).
  - (3) You will operate and maintain the container covers and closure devices according to the requirements in [§ 63.923(d)](/cfr/40/63.923.md?p=d), with the exceptions specified in [§ 63.7900(b)(2)](/cfr/40/63.7900.md?p=b-2).
  - (4) You have records that the container meets the applicable U.S. Department of Transportation regulations, or you have conducted an initial test of each container for no detectable organic emissions using the procedures in [§ 63.925(a)](/cfr/40/63.925.md?p=a), and have records documenting the test results, or you have demonstrated within the last 12 months that each container is vapor-tight according to the procedures in [§ 63.925(a)](/cfr/40/63.925.md?p=a) and have records documenting the test results.
- (e) You must demonstrate initial compliance of each container determined under [paragraph (b)](#b) of this section to require Container Level 3 controls if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(e)(1)](#e-1) and [(2)](#e-2) of this section.
  - (1) For each permanent total enclosure you use to comply with [§ 63.7900](/cfr/40/63.7900.md), you have performed the verification procedure according to the requirements in [§ 63.924(c)(1)](/cfr/40/63.924.md?p=c-1), and prepare records of the supporting calculations and measurements.
  - (2) You have met each applicable requirement for demonstrating initial compliance with the emission limitations and work practice standards for a closed vent system and control device in [§ 63.7926](/cfr/40/63.7926.md).

# §63.7902. What are my inspection and monitoring requirements for containers?

- (a) You must inspect each container using Container Level 1 or Container Level 2 controls according to the requirements in [§ 63.926(a)](/cfr/40/63.926.md?p=a).
- (b) If you use Container Level 3 controls, you must meet requirements in paragraphs [(b)(1)](#b-1) and [(2)](#b-2) of this section, as applicable to your site remediation.
  - (1) You must perform the verification procedure for each permanent total enclosure annually according to the requirements in [§ 63.924(c)(1)](/cfr/40/63.924.md?p=c-1).
  - (2) You must monitor and inspect each closed vent system and control device according to the requirements in [§ 63.7927](/cfr/40/63.7927.md) that apply to you.

# §63.7903. How do I demonstrate continuous compliance with the emissions limitations and work practice standards for containers?

- (a) You must demonstrate continuous compliance with the emissions limitations and work practice standards in [§ 63.7900](/cfr/40/63.7900.md) applicable to your affected containers by meeting the requirements in [paragraphs (b) through (e)](#b..e) of this section.
- (b) You must demonstrate continuous compliance with the requirement to determine the applicable container control level specified in [§ 63.7900(b)](/cfr/40/63.7900.md?p=b) for each affected tank by meeting the requirements in [paragraphs (b)(1) through (3)](#b-1..b-3) of this section.
  - (1) Keeping records of the quantity and design capacity for each type of container used for your site remediation and subject to [§ 63.7886(b)(1)(ii)](/cfr/40/63.7886.md?p=b-1-ii).
  - (2) For containers subject to [§ 63.7886(b)(1)(ii)](/cfr/40/63.7886.md?p=b-1-ii) with a design capacity greater than 0.46 m 3 and not using Container Level 2 or Container Level 3 controls, meeting the requirements in paragraphs [(b)(2)(i)](#b-2-i) and [(ii)](#b-2-ii) of this section.
    - (i) Keeping records of the maximum vapor pressure or total organic concentration for the remediation material placed in the containers, as applicable to the conditions in § [63.7900(b)(3)(i)](/cfr/40/63.7900.md?p=b-3-i) or [(ii)](/cfr/40/63.7900.md?p=b-3-ii) for which your containers qualify to use Container Level 1 controls.
    - (ii) Performing a new determination whenever changes to the remediation material placed in the containers could potentially cause the maximum vapor pressure or total organic concentration to increase to a level that is equal to or greater than the conditions specified in § [63.7900(b)(3)(i)](/cfr/40/63.7900.md?p=b-3-i) or [(ii)](/cfr/40/63.7900.md?p=b-3-ii), as applicable to your containers. You must keep records of each determination.
  - (3) Keeping records to document compliance with the requirements according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (c) You must demonstrate continuous compliance for each container determined to require Container Level 1 controls by meeting the requirements in [paragraphs (c)(1) through (5)](#c-1..c-5) of this section.
  - (1) Operating and maintaining covers for each container according to the requirements in [§ 63.922(d)](/cfr/40/63.922.md?p=d), with the exceptions specified in [§ 63.7900(b)(1)](/cfr/40/63.7900.md?p=b-1).
  - (2) Inspecting each container annually according to the requirements in [§ 63.926(a)(2)](/cfr/40/63.926.md?p=a-2).
  - (3) Emptying or repairing each container according to the requirements in [§ 63.926(a)(3)](/cfr/40/63.926.md?p=a-3).
  - (4) Keeping records of an inspection that includes the information in paragraphs (a)(4)(i) and (ii) of this section.
    - (i) Date of each inspection; and
    - (ii) If a defect is detected during an inspection, the location of the defect, a description of the defect, the date of detection, the corrective action taken to repair the defect, and if repair is delayed, the reason for any delay and the date completion of the repair is expected.
  - (5) Keeping records to document compliance with the requirements according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (d) You must demonstrate continuous compliance for each container determined to require Container Level 2 controls by meeting the requirements in [paragraphs (d)(1) through (6)](#d-1..d-6) of this section.
  - (1) Transferring remediation material in and out of the container according to the requirements in [§ 63.923(c)](/cfr/40/63.923.md?p=c).
  - (2) Operating and maintaining container covers according to the requirements in [§ 63.923(d)](/cfr/40/63.923.md?p=d), with the exceptions specified in [§ 63.7900(b)(2)](/cfr/40/63.7900.md?p=b-2).
  - (3) Inspecting each container annually according to the requirements in [§ 63.926(a)(2)](/cfr/40/63.926.md?p=a-2).
  - (4) Emptying or repairing containers according to the requirements in [§ 63.926(a)(3)](/cfr/40/63.926.md?p=a-3).
  - (5) Keeping records of each inspection that include the information in paragraphs [(d)(5)(i)](#d-5-i) and [(ii)](#d-5-ii) of this section.
    - (i) Date of each inspection; and
    - (ii) If a defect is detected during an inspection, the location of the defect, a description of the defect, the date of detection, the corrective action taken to repair the defect, and if repair is delayed, the reason for any delay and the date completion of the repair is expected.
  - (6) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (e) You must demonstrate continuous compliance for each container determined to require Container Level 3 controls by meeting the requirements in [paragraphs (e)(1) through (4)](#e-1..e-4) of this section.
  - (1) Performing the verification procedure for the enclosure annually according to the requirements in [§ 63.685(i)](/cfr/40/63.685.md?p=i).
  - (2) Recording the information specified in [§ 63.696(f)](/cfr/40/63.696.md?p=f).
  - (3) Meeting each applicable requirement for demonstrating continuous compliance with the emissions limitations and work practice standards for a closed vent system and control device in [§ 63.7928](/cfr/40/63.7928.md).
  - (4) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).

# §63.7905. What emissions limitations or work practice standards must I meet for surface impoundments?

- (a) You must control HAP emissions from each new and existing surface impoundment subject to [§ 63.7886(b)(1)(iii)](/cfr/40/63.7886.md?p=b-1-iii) according to emissions limitations and work practice standards in this section that apply to your affected surface impoundments.
- (b) For each affected surface impoundment, you must install and operate air pollution controls that meet either of the options in paragraphs [(b)(1)](#b-1) or [(2)](#b-2) of this section.
  - (1) Install and operate a floating membrane cover according to the requirements in [§ 63.942](/cfr/40/63.942.md). § [63.942(c)(2)](/cfr/40/63.942.md?p=c-2) and [(3)](/cfr/40/63.942.md?p=c-3) do not apply for the purposes of this subpart if your initial startup date is after September 3, 2019; § [63.942(c)(2)](/cfr/40/63.942.md?p=c-2) and [(3)](/cfr/40/63.942.md?p=c-3) do not apply for the purposes of this subpart for any source after January 6, 2021; or
  - (2) Install and operate a cover vented through a closed vent system to a control device according to the requirements in [§ 63.943](/cfr/40/63.943.md). You must meet the emissions limitations and work practice standards in [§ 63.7925](/cfr/40/63.7925.md) that apply to your closed vent system and control device. [§ 63.943(c)(2)](/cfr/40/63.943.md?p=c-2) does not apply for the purposes of this subpart if your initial startup date is after September 3, 2019; [§ 63.943(c)(2)](/cfr/40/63.943.md?p=c-2) does not apply for the purposes of this subpart for any source after January 6, 2021.
- (c) As provided in [§ 63.6(g)](/cfr/40/63.6.md?p=g), you may request approval from the EPA to use an alternative to the work practice standards in this section that apply to your surface impoundments. If you request for permission to use an alternative to the work practice standards, you must submit the information described in [§ 63.6(g)(2)](/cfr/40/63.6.md?p=g-2).

# §63.7906. How do I demonstrate initial compliance with the emissions limitations or work practice standards for surface impoundments?

- (a) You must demonstrate initial compliance with the emissions limitations and work practice standards in [§ 63.7905](/cfr/40/63.7905.md) that apply to your affected surface impoundments by meeting the requirements in paragraphs [(b)](#b) and [(c)](#c) of this section, as applicable to your surface impoundments.
- (b) You must demonstrate initial compliance of each surface impoundment using a floating membrane cover according to [§ 63.7905(b)(1)](/cfr/40/63.7905.md?p=b-1) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in [paragraphs (b)(1) through (3)](#b-1..b-3) of this section.
  - (1) You have installed a floating membrane cover and closure devices that meet the requirements in [§ 63.942(b)](/cfr/40/63.942.md?p=b), and you have records documenting the design and installation.
  - (2) You will operate the cover and closure devices according to the requirements in [§ 63.942(c)](/cfr/40/63.942.md?p=c), with the exceptions specified in [§ 63.7905(b)(1)](/cfr/40/63.7905.md?p=b-1).
  - (3) You have performed an initial visual inspection of each surface impoundment and closure devices according to the requirements in [§ 63.946(a)](/cfr/40/63.946.md?p=a), and you have records documenting the inspection results.
- (c) You must demonstrate initial compliance of each surface impoundment using a cover vented to a control device according to [§ 63.7905(b)(2)](/cfr/40/63.7905.md?p=b-2) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in [paragraphs (c)(1) through (4)](#c-1..c-4) of this section.
  - (1) You have installed a cover and closure devices that meet the requirements in [§ 63.943(b)](/cfr/40/63.943.md?p=b), and have records documenting the design and installation.
  - (2) You will operate the cover and closure devices according to the requirements in [§ 63.943(c)](/cfr/40/63.943.md?p=c), with the exceptions specified in [§ 63.7905(b)(2)](/cfr/40/63.7905.md?p=b-2).
  - (3) You have performed an initial visual inspection of each cover and closure devices according to the requirements in [§ 63.946(b)](/cfr/40/63.946.md?p=b), and have records documenting the inspection results.
  - (4) You have met each applicable requirement for demonstrating initial compliance with the emission limitations and work practice standards for a closed vent system and control device in [§ 63.7926](/cfr/40/63.7926.md).

# §63.7907. What are my inspection and monitoring requirements for surface impoundments?

- (a) If you use a floating membrane cover according to [§ 63.7905(b)(1)](/cfr/40/63.7905.md?p=b-1), you must visually inspect the floating membrane cover and its closure devices at least annually according to the requirements in [§ 63.946(a)](/cfr/40/63.946.md?p=a).
- (b) If you use a cover vented to a control device according to [§ 63.7905(b)(2)](/cfr/40/63.7905.md?p=b-2), you must meet requirements in paragraphs [(b)(1)](#b-1) and [(2)](#b-2) of this section.
  - (1) You must visually inspect the cover and its closure devices for defects according to the requirements in [§ 63.946(b)](/cfr/40/63.946.md?p=b).
  - (2) You must monitor and inspect the closed vent system and control device according to the requirements in [§ 63.7927](/cfr/40/63.7927.md) that apply to you.

# §63.7908. How do I demonstrate continuous compliance with the emissions limitations and work practice standards for surface impoundments?

- (a) You must demonstrate continuous compliance with the emissions limitations and work practice standards in [§ 63.7905](/cfr/40/63.7905.md) applicable to your affected surface impoundments by meeting the requirements in paragraphs [(b)](#b) and [(c)](#c) of this section as applicable to your surface impoundments.
- (b) You must demonstrate continuous compliance for each surface impoundment using a floating membrane cover according to [§ 63.7905(b)(1)](/cfr/40/63.7905.md?p=b-1) by meeting the requirements in [paragraphs (b)(1) through (5)](#b-1..b-5) of this section.
  - (1) Operating and maintaining the floating membrane cover and closure devices according to the requirements in [§ 63.942(c)](/cfr/40/63.942.md?p=c), with the exceptions specified in [§ 63.7905(b)(1)](/cfr/40/63.7905.md?p=b-1).
  - (2) Visually inspecting the floating membrane cover and closure devices for defects at least annually according to the requirements in [§ 63.946(a)](/cfr/40/63.946.md?p=a).
  - (3) Repairing defects according to the requirements in [§ 63.946(c)](/cfr/40/63.946.md?p=c).
  - (4) Recording the information specified in § [63.947(a)(2)](/cfr/40/63.947.md?p=a-2) and [(a)(3)](/cfr/40/63.947.md?p=a-3).
  - (5) Keeping records to document compliance with the requirements according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (c) You must demonstrate continuous compliance for each surface impoundment using a cover vented to a control device according to [§ 63.7905(b)(2)](/cfr/40/63.7905.md?p=b-2) by meeting the requirements in [paragraphs (c)(1) through (6)](#c-1..c-6) of this section.
  - (1) Operating and maintaining the floating membrane cover and closure devices according to the requirements in [§ 63.943(c)](/cfr/40/63.943.md?p=c), with the exceptions specified in [§ 63.7905(b)(2)](/cfr/40/63.7905.md?p=b-2).
  - (2) Visually inspecting the cover and its closure devices for defects at least annually according to the requirements in [§ 63.946(b)](/cfr/40/63.946.md?p=b).
  - (3) Repairing defects according to the requirements in [§ 63.946(c)](/cfr/40/63.946.md?p=c).
  - (4) Recording the information specified in § [63.947(a)(2)](/cfr/40/63.947.md?p=a-2) and [(a)(3)](/cfr/40/63.947.md?p=a-3).
  - (5) Meeting each applicable requirement for demonstrating continuous compliance with the emission limitations and work practice standards for a closed vent system and control device in [§ 63.7928](/cfr/40/63.7928.md).
  - (6) Keeping records to document compliance with the requirements according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).

# §63.7910. What emissions limitations and work practice standards must I meet for separators?

- (a) You must control HAP emissions from each new and existing oil-water separator and organic-water separator subject to [§ 63.7886(b)(1)(iv)](/cfr/40/63.7886.md?p=b-1-iv) according to emissions limitations and work practice standards in this section that apply to your affected separators.
- (b) For each affected separator, you must install and operate air pollution controls that meet one of the options in [paragraphs (b)(1) through (3)](#b-1..b-3) of this section.
  - (1) Install and operate a floating roof according to the requirements in [§ 63.1043](/cfr/40/63.1043.md). For portions of the separator where it is infeasible to install and operate a floating roof, such as over a weir mechanism, you must comply with the requirements specified in [paragraph (b)(2)](#b-2) of this section. [§ 63.1043(c)(2)](/cfr/40/63.1043.md?p=c-2) does not apply for the purposes of this subpart if your initial startup date is after September 3, 2019; [§ 63.1043(c)(2)](/cfr/40/63.1043.md?p=c-2) does not apply for the purposes of this subpart for any source after January 6, 2021.
  - (2) Install and operate a fixed roof vented through a closed vent system to a control device according to the requirements in [§ 63.1044](/cfr/40/63.1044.md). You must meet the emissions limitations and work practice standards in [§ 63.7925](/cfr/40/63.7925.md) that apply to your closed vent system and control device. [§ 63.1044(c)(2)](/cfr/40/63.1044.md?p=c-2) does not apply for the purposes of this subpart if your initial startup date is after September 3, 2019; [§ 63.1044(c)(2)](/cfr/40/63.1044.md?p=c-2) does not apply for the purposes of this subpart for any source after January 6, 2021.
  - (3) Install and operate a pressurized separator according to the requirements in [§ 63.1045](/cfr/40/63.1045.md). [§ 63.1045(b)(3)(i)](/cfr/40/63.1045.md?p=b-3-i) does not apply for the purposes of this subpart if your initial startup date is after September 3, 2019; [§ 63.1045(b)(3)(i)](/cfr/40/63.1045.md?p=b-3-i) does not apply for the purposes of this subpart for any source after January 6, 2021.
- (c) As provided in [§ 63.6(g)](/cfr/40/63.6.md?p=g), you may request approval from the EPA to use an alternative to the work practice standards in this section that apply to your separators. If you request for permission to use an alternative to the work practice standards, you must submit the information described in [§ 63.6(g)(2)](/cfr/40/63.6.md?p=g-2).

# §63.7911. How do I demonstrate initial compliance with the emissions limitations and work practice standards for separators?

- (a) You must demonstrate initial compliance with the emissions limitations and work practice standards in [§ 63.7910](/cfr/40/63.7910.md) that apply to your affected separators by meeting the requirements in [paragraphs (b) through (d)](#b..d) of this section, as applicable to your separators.
- (b) You must demonstrate initial compliance of each separator using a floating roof according to [§ 63.7910(b)(1)](/cfr/40/63.7910.md?p=b-1) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in [paragraphs (b)(1) through (4)](#b-1..b-4) of this section.
  - (1) You have installed a floating roof and closure devices that meet the requirements in [§ 63.1043(b)](/cfr/40/63.1043.md?p=b), and you have records documenting the design and installation.
  - (2) You will operate the floating roof and closure devices according to the requirements in [§ 63.1043(c)](/cfr/40/63.1043.md?p=c), with the exceptions specified in [§ 63.7910(b)(1)](/cfr/40/63.7910.md?p=b-1).
  - (3) You have performed an initial seal gap measurement inspection using the procedures in [§ 63.1046(b)](/cfr/40/63.1046.md?p=b), and you have records documenting the measurement results.
  - (4) You have performed an initial visual inspection of the floating roof and closure devices for defects according to the requirements in [§ 63.1047(b)(2)](/cfr/40/63.1047.md?p=b-2), and you have records documenting the inspection results.
  - (5) For any portions of the separator using a fixed roof vented to a control device according to [§ 63.7910(b)(1)](/cfr/40/63.7910.md?p=b-1), you have met the requirements in [paragraphs (c)(1) through (4)](#c-1..c-4) of this section.
- (c) You must demonstrate initial compliance of each separator using a fixed roof vented to a control device according to [§ 63.7910(b)(2)](/cfr/40/63.7910.md?p=b-2) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in [paragraphs (c)(1) through (4)](#c-1..c-4) of this section.
  - (1) You have installed a fixed roof and closure devices that meet the requirements in [§ 63.1042(b)](/cfr/40/63.1042.md?p=b), and you have records documenting the design and installation.
  - (2) You will operate the fixed roof and its closure devices according to the requirements in [§ 63.1042(c)](/cfr/40/63.1042.md?p=c). [§ 63.1042(c)(3)](/cfr/40/63.1042.md?p=c-3) does not apply for the purposes of this subpart if your initial date is after September 3, 2019; [§ 63.1042(c)(3)](/cfr/40/63.1042.md?p=c-3) does not apply for the purposes of this subpart for any source after January 6, 2021.
  - (3) You have performed an initial visual inspection of the fixed roof and closure devices for defects according to the requirements in [§ 63.1047(a)](/cfr/40/63.1047.md?p=a).
  - (4) You have met each applicable requirement for demonstrating initial compliance with the emission limitations and work practice standards for a closed vent system and control device in [§ 63.7926](/cfr/40/63.7926.md).
- (d) You must demonstrate initial compliance of each pressurized separator that operates as a closed system according to [§ 63.7910(b)(3)](/cfr/40/63.7910.md?p=b-3) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(d)(1)](#d-1) and [(2)](#d-2) of this section.
  - (1) You have installed a pressurized separator that operates as a closed system according to the requirements in § [63.1045(b)(1)](/cfr/40/63.1045.md?p=b-1) and [(b)(2)](/cfr/40/63.1045.md?p=b-2), and you have records of the design and installation.
  - (2) You will operate the pressurized separator as a closed system according to the requirements in [§ 63.1045(b)(3)](/cfr/40/63.1045.md?p=b-3), with the exceptions specified in [§ 63.7910(b)(3)](/cfr/40/63.7910.md?p=b-3).

# §63.7912. What are my inspection and monitoring requirements for separators?

- (a) If you use a floating roof according to [§ 63.7910(b)(1)](/cfr/40/63.7910.md?p=b-1), you must meet requirements in paragraphs [(a)(1)](#a-1) and [(2)](#a-2) of this section.
  - (1) Measure the seal gaps at least annually according to the requirements in [§ 63.1047(b)(1)](/cfr/40/63.1047.md?p=b-1).
  - (2) Visually inspect the floating roof at least annually according to the requirements in [§ 63.1047(b)(2)](/cfr/40/63.1047.md?p=b-2).
- (b) If you use a cover vented to a control device according to § [63.7910(b)(1)](/cfr/40/63.7910.md?p=b-1) or [(2)](/cfr/40/63.7910.md?p=b-2), you must meet requirements in paragraphs [(b)(1)](#b-1) and [(2)](#b-2) of this section.
  - (1) You must visually inspect the cover and its closure devices for defects according to the requirements in [§ 63.1047(c)](/cfr/40/63.1047.md?p=c).
  - (2) You must monitor and inspect the closed vent system and control device according to the requirements in [§ 63.7927](/cfr/40/63.7927.md) that apply to you.
- (c) If you use a pressurized separator that operates as a closed system according to [§ 63.7910(b)(3)](/cfr/40/63.7910.md?p=b-3), you must visually inspect each pressurized separator and closure devices for defects at least annually to ensure they are operating according to the design requirements in [§ 63.1045(b)](/cfr/40/63.1045.md?p=b), with the exceptions specified in [§ 63.7910(b)(3)](/cfr/40/63.7910.md?p=b-3).

# §63.7913. How do I demonstrate continuous compliance with the emissions limitations and work practice standards for separators?

- (a) You must demonstrate continuous compliance with the emissions limitations and work practice standards in [§ 63.7910](/cfr/40/63.7910.md) applicable to your affected separators by meeting the requirements in [paragraphs (b) through (d)](#b..d) of this section as applicable to your surface impoundments.
- (b) You must demonstrate continuous compliance for each separator using a floating roof according to [§ 63.7910(b)(1)](/cfr/40/63.7910.md?p=b-1) by meeting the requirements in [paragraphs (b)(1) through (6)](#b-1..b-6) of this section.
  - (1) Operating and maintaining the floating roof according to the requirements in [§ 63.1043(b)](/cfr/40/63.1043.md?p=b).
  - (2) Performing seal gap measurement inspections at least annually according to the requirements in [§ 63.1047(b)(1)](/cfr/40/63.1047.md?p=b-1).
  - (3) Visually inspecting the floating roof at least annually according to the requirements in [§ 63.1047(b)(2)](/cfr/40/63.1047.md?p=b-2).
  - (4) Repairing defects according to the requirements in [§ 63.1047(d)](/cfr/40/63.1047.md?p=d).
  - (5) Recording the information specified in § [63.1048(a)](/cfr/40/63.1048.md?p=a) and [(b)](/cfr/40/63.1048.md?p=b).
  - (6) Keeping records to document compliance with the requirements according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (c) You must demonstrate continuous compliance for each separator using a fixed roof vented through a closed vent system to a control device according to [§ 63.7910(b)(2)](/cfr/40/63.7910.md?p=b-2) by meeting the requirements in [paragraphs (c)(1) through (6)](#c-1..c-6) of this section.
  - (1) Operating and maintaining the fixed roof and its closure devices according to the requirements in [§ 63.1042](/cfr/40/63.1042.md), with the exceptions specified in [§ 63.7911(c)(2)](/cfr/40/63.7911.md?p=c-2).
  - (2) Performing visual inspections of the fixed roof and its closure devices for defects at least annually according to the requirements in [§ 63.1047(a)](/cfr/40/63.1047.md?p=a).
  - (3) Repairing defects according to the requirements in [§ 63.1047(d)](/cfr/40/63.1047.md?p=d).
  - (4) Recording the information specified in [§ 63.1048(a)](/cfr/40/63.1048.md?p=a).
  - (5) Meeting each applicable requirement for demonstrating continuous compliance with the emission limitations and work practice standards for a closed vent system and control device in [§ 63.7928](/cfr/40/63.7928.md).
  - (6) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (d) You must demonstrate continuous compliance for each pressurized separator operated as a closed system according to [§ 63.7910(b)(3)](/cfr/40/63.7910.md?p=b-3) by meeting the requirements in paragraphs [(d)(1)](#d-1) and [(2)](#d-2) of this section.
  - (1) Operating the pressurized separator at all times according to the requirements in [§ 63.1045](/cfr/40/63.1045.md), with the exceptions specified in [§ 63.7910(b)(3)](/cfr/40/63.7910.md?p=b-3).
  - (2) Visually inspecting each pressurized tank and closure devices for defects at least annually to ensure they are operating according to the design requirements in [§ 63.1045(b)](/cfr/40/63.1045.md?p=b), and recording the results of each inspection.

# §63.7915. What emissions limitations and work practice standards must I meet for transfer systems?

- (a) You must control HAP emissions from each new and existing transfer system subject to [§ 63.7886(b)(1)(v)](/cfr/40/63.7886.md?p=b-1-v) according to emissions limitations and work practice standards in this section that apply to your affected transfer systems.
- (b) For each affected transfer system that is an individual drain system as defined in [§ 63.7957](/cfr/40/63.7957.md), you must install and operate controls according to the requirements in [§ 63.962](/cfr/40/63.962.md).
- (c) For each affected transfer system that is not an individual drain system as defined in [§ 63.7957](/cfr/40/63.7957.md), you must use one of the transfer systems specified in [paragraphs (c)(1) through (3)](#c-1..c-3) of this section.
  - (1) A transfer system that uses covers according to the requirements in [§ 63.689(d)](/cfr/40/63.689.md?p=d).
  - (2) **A transfer system that consists of continuous hard piping.** All joints or seams between the pipe sections must be permanently or semi-permanently sealed (e.g., a welded joint between two sections of metal pipe or a bolted and gasketed flange).
  - (3) A transfer system that is enclosed and vented through a closed vent system to a control device according to the requirements specified in paragraphs [(c)(3)(i)](#c-3-i) and [(ii)](#c-3-ii) of this section.
    - (i) The transfer system is designed and operated such that an internal pressure in the vapor headspace in the enclosure is maintained at a level less than atmospheric pressure when the control device is operating, and
    - (ii) The closed vent system and control device are designed and operated to meet the emissions limitations and work practice standards in [§ 63.7925](/cfr/40/63.7925.md) that apply to your closed vent system and control device.
- (d) As provided in [§ 63.6(g)](/cfr/40/63.6.md?p=g), you may request approval from the EPA to use an alternative to the work practice standards in this section that apply to your transfer systems. If you request for permission to use an alternative to the work practice standards, you must submit the information described in [§ 63.6(g)(2)](/cfr/40/63.6.md?p=g-2).

# §63.7916. How do I demonstrate initial compliance with the emissions limitations and work practice standards for transfer systems?

- (a) You must demonstrate initial compliance with the emissions limitations and work practice standards in [§ 63.7915](/cfr/40/63.7915.md) that apply to your affected transfer systems by meeting the requirements in [paragraphs (b) through (e)](#b..e) of this section, as applicable to your transfer systems.
- (b) You must demonstrate initial compliance of each individual drain system using controls according to [§ 63.7915(b)](/cfr/40/63.7915.md?p=b) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in [paragraphs (b)(1) through (3)](#b-1..b-3) of this section.
  - (1) You have installed air emission controls for each individual drain system and junction box according to the requirements in § [63.962(a)](/cfr/40/63.962.md?p=a) and [(b)](/cfr/40/63.962.md?p=b), and you have records documenting the installation and design.
  - (2) You will operate the air emission controls according to the requirements in [§ 63.962(b)(5)](/cfr/40/63.962.md?p=b-5).
  - (3) You have performed an initial visual inspection of each individual drain system according to the requirements in [§ 63.964(a)](/cfr/40/63.964.md?p=a), and you have records documenting the inspection results.
- (c) You must demonstrate initial compliance of each transfer system using covers according to [§ 63.7915(c)(1)](/cfr/40/63.7915.md?p=c-1) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in [paragraphs (c)(1) through (3)](#c-1..c-3) of this section.
  - (1) Each transfer system is equipped with covers and closure devices according to the requirements in [§ 63.689(d)(1) through (4)](/cfr/40/63.689.md?p=d-1..d-4), and you have records documenting the design and installation.
  - (2) You have performed an initial inspection of each cover and its closure devices for defects according to the requirements in [§ 63.695(d)(1) through (5)](/cfr/40/63.695.md?p=d-1..d-5), and you have records documenting the inspection results.
  - (3) You will operate each cover and its closure devices according to the requirements in [§ 63.689(5)](/cfr/40/63.689.md?p=5).
- (d) You must demonstrate initial compliance of each transfer system that consists of hard piping according to [§ 63.7915(c)(2)](/cfr/40/63.7915.md?p=c-2) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(d)(1)](#d-1) and [(2)](#d-2) of this section.
  - (1) You have installed a transfer system that consists entirely of hard piping and meets the requirements in [§ 63.7915(c)(2)](/cfr/40/63.7915.md?p=c-2), and you have records documenting the design and installation.
  - (2) You have performed an initial inspection of the entire transfer system to verify that all joints or seams between the pipe sections are permanently or semi-permanently sealed (e.g., a welded joint between two sections of metal pipe or a bolted and gasketed flange), and you have records documenting the inspection results.
- (e) You must demonstrate initial compliance of each transfer system that is enclosed and vented to a control device according to [§ 63.7915(e)(3)](/cfr/40/63.7915.md?p=e-3) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(e)(1)](#e-1) and [(2)](#e-2) of this section.
  - (1) You have installed a transfer system that is designed and operated such that an internal pressure in the vapor headspace in the enclosure is maintained at a level less than atmospheric pressure when the control device is operating, and you have records documenting the design and installation.
  - (2) You have met each applicable requirement for demonstrating initial compliance with the emission limitations and work practice standards for a closed vent system and control device in [§ 63.7926](/cfr/40/63.7926.md).

# §63.7917. What are my inspection and monitoring requirements for transfer systems?

- (a) If you operate an individual drain system as a transfer system according to [§ 63.7915(b)](/cfr/40/63.7915.md?p=b), you must visually inspect each individual drain system at least annually according to the requirements in [§ 63.964(a)](/cfr/40/63.964.md?p=a).
- (b) If you operate a transfer system using covers according to [§ 63.7915(c)(1)](/cfr/40/63.7915.md?p=c-1), you must inspect each cover and its closure devices for defects according to the requirements in [§ 63.695(d)(1) through (5)](/cfr/40/63.695.md?p=d-1..d-5).
- (c) If you operate a transfer system consisting of hard piping according to [§ 63.7915(c)(2)](/cfr/40/63.7915.md?p=c-2), you must annually inspect the unburied portion of pipeline and all joints for leaks and other defects. In the event that a defect is detected, you must repair the leak or defect according to the requirements of [paragraph (e)](#e) of this section.
- (d) If you operate a transfer system that is enclosed and vented to a control device according to [§ 63.7915(c)(3)](/cfr/40/63.7915.md?p=c-3), you must meet requirements in paragraphs [(d)(1)](#d-1) and [(2)](#d-2) of this section.
  - (1) You must annually inspect all enclosure components (e.g., enclosure sections, closure devices, fans) for defects that would prevent an internal pressure in the vapor headspace in the enclosure from continuously being maintained at a level less than atmospheric pressure when the control device is operating. In the event that a defect is detected, you must repair the defect according to the requirements of [paragraph (e)](#e) of this section.
  - (2) You must monitor and inspect the closed vent system and control device according to the requirements in [§ 63.7927](/cfr/40/63.7927.md) that apply to you.
- (e) If you are subject to paragraph [(c)](#c) or [(d)](#d) of this section, you must repair all detected defects as specified in [paragraphs (e)(1) through (3)](#e-1..e-3) of this section.
  - (1) You must make first efforts at repair of the defect no later than 5 calendar days after detection and repair shall be completed as soon as possible but no later than 45 calendar days after detection except as provided in [paragraph (e)(2)](#e-2) of this section.
  - (2) Repair of a defect may be delayed beyond 45 calendar days if you determine that repair of the defect requires emptying or temporary removal from service of the transfer system and no alternative transfer system is available at the site to accept the material normally handled by the system. In this case, you must repair the defect the next time the process or unit that is generating the material handled by the transfer system stops operation. Repair of the defect must be completed before the process or unit resumes operation.
  - (3) You must maintain a record of the defect repair according to the requirements specified in [§ 63.7952](/cfr/40/63.7952.md).

# §63.7918. How do I demonstrate continuous compliance with the emissions limitations and work practice standards for transfer systems?

- (a) You must demonstrate continuous compliance with the emissions limitations and work practice standards in [§ 63.7915](/cfr/40/63.7915.md) applicable to your affected transfer system by meeting the requirements in [paragraphs (b) through (e)](#b..e) of this section as applicable to your transfer systems.
- (b) You must demonstrate continuous compliance for each individual drain system using controls according to [§ 63.7915(b)](/cfr/40/63.7915.md?p=b) by meeting the requirements in [paragraphs (b)(1) through (5)](#b-1..b-5) of this section.
  - (1) Operating and maintaining the air emission controls for individual drain systems according to the requirements in [§ 63.962](/cfr/40/63.962.md).
  - (2) Visually inspecting each individual drain system at least annually according to the requirements in [§ 63.964(a)](/cfr/40/63.964.md?p=a).
  - (3) Repairing defects according to the requirements in [§ 63.964(b)](/cfr/40/63.964.md?p=b).
  - (4) Recording the information specified in [§ 63.965(a)](/cfr/40/63.965.md?p=a).
  - (5) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (c) You must demonstrate continuous compliance for each transfer system using covers according to [§ 63.7915(c)(1)](/cfr/40/63.7915.md?p=c-1) by meeting the requirements in [paragraphs (c)(1) through (4)](#c-1..c-4) of this section.
  - (1) Operating and maintaining each cover and its closure devices according to the requirements in [§ 63.689(d)(1) through (5)](/cfr/40/63.689.md?p=d-1..d-5).
  - (2) Performing inspections of each cover and its closure devices for defects at least annually according to the requirements in [§ 63.695(d)(1) through (5)](/cfr/40/63.695.md?p=d-1..d-5).
  - (3) Repairing defects according to the requirements in [§ 63.695(5)](/cfr/40/63.695.md?p=5)
  - (4) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (d) You must demonstrate continuous compliance for each transfer system that consists of hard piping according to [§ 63.7915(c)(2)](/cfr/40/63.7915.md?p=c-2) by meeting the requirements in [paragraphs (d)(1) through (4)](#d-1..d-4) of this section.
  - (1) Operating and maintaining the pipeline to ensure that all joints or seams between the pipe sections remain permanently or semi-permanently sealed (e.g., a welded joint between two sections of metal pipe or a bolted and gasketed flange).
  - (2) Inspecting the pipeline for defects at least annually according to the requirements in [§ 63.7917(c)](/cfr/40/63.7917.md?p=c).
  - (3) Repairing defects according to the requirements in [§ 63.7917(e)](/cfr/40/63.7917.md?p=e).
  - (4) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (e) You must demonstrate continuous compliance for each transfer system that is enclosed and vented to a control device according to [§ 63.7915(c)(3)](/cfr/40/63.7915.md?p=c-3) by meeting the requirements in [paragraphs (e)(1) through (5)](#e-1..e-5) of this section.
  - (1) Operating and maintaining the enclosure to ensure that the internal pressure in the vapor headspace in the enclosure is maintained continuously at a level less than atmospheric pressure when the control device is operating.
  - (2) Inspecting the enclosure and its closure devices for defects at least annually according to the requirements in [§ 63.7918(d)](#d).
  - (3) Repairing defects according to the requirements in [§ 63.7918(e)](#e).
  - (4) Meeting each applicable requirement for demonstrating continuous compliance with the emission limitations and work practice standards for a closed vent system and control device in [§ 63.7928](/cfr/40/63.7928.md).
  - (5) Keeping records to document compliance with the requirements according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).

# §63.7920. What emissions limitations and work practice standards must I meet for equipment leaks?

- (a) You must control HAP emissions from each new and existing equipment subject to [§ 63.7887](/cfr/40/63.7887.md) according to emissions limitations and work practice standards in this section that apply to your affected equipment.
- (b) For your affected equipment, you must meet the requirements in either paragraph [(b)(1)](#b-1) or [(2)](#b-2) of this section.
  - (1) **Control equipment leaks according to all applicable requirements under 40 CFR part 63, subpart TT—** National Emission Standards for Equipment Leaks—Control Level 1, with the differences noted in [paragraph (b)(3)](#b-3) of this section for the purposes of this subpart; or
  - (2) **Control equipment leaks according to all applicable requirements under 40 CFR part 63, subpart UU—** National Emission Standards for Equipment Leaks—Control Level 2.
  - (3)
    - (i) For the purpose of complying with the requirements of [§ 63.1006(b)(2)](/cfr/40/63.1006.md?p=b-2), the instrument reading that defines a leak is 500 parts per million or greater.
    - (ii) For the purpose of complying with the requirements of [§ 63.1007(b)(2)](/cfr/40/63.1007.md?p=b-2), the instrument reading that defines a leak is 5,000 parts per million or greater for pumps handling polymerizing monomers; 2,000 parts per million or greater for pumps in food/medical service; and 1,000 parts per million or greater for all other pumps.
- (c) If you use a closed vent system and control device to comply with this section, as an alternative to meeting the standards in [§ 63.1015](/cfr/40/63.1015.md) or [§ 63.1034](/cfr/40/63.1034.md) for closed vent systems and control devices, you may elect to meet the requirements in [§§ 63.7925 through 63.7928](/cfr/40/63.7925..63.7928.md) that apply to your closed vent system and control device.
- (d) For the purposes of this subpart, the requirements of [§ 63.7920(e)](#e) of this subpart apply rather than those of [§ 63.1030](/cfr/40/63.1030.md) or of [§ 63.1011](/cfr/40/63.1011.md), as applicable, for pressure relief devices in gas and vapor service. The requirements of [§ 63.7920(e)](#e) of this subpart apply rather than those of [§ 63.1029](/cfr/40/63.1029.md) or of [§ 63.1010](/cfr/40/63.1010.md), as applicable, for pressure relief devices in liquid service.
- (e) Operate each pressure relief device under normal operating conditions, as indicated by an instrument reading of less than 500 ppm above the background level as detected by the method specified in [§ 63.1004(b)](/cfr/40/63.1004.md?p=b) or [§ 63.1023(b)](/cfr/40/63.1023.md?p=b), as applicable.
- (f) As provided in [§ 63.6(g)](/cfr/40/63.6.md?p=g), you may request approval from the EPA to use an alternative to the work practice standards in this section that apply to your equipment. If you request for permission to use an alternative to the work practice standards, you must submit the information described in [§ 63.6(g)(2)](/cfr/40/63.6.md?p=g-2).

# §63.7921. How do I demonstrate initial compliance with the emissions limitations and work practice standards for equipment leaks?

- (a) You must demonstrate initial compliance with the emissions limitations and work practice standards in [§ 63.7920](/cfr/40/63.7920.md) that apply to your affected equipment by meeting the requirements in paragraphs [(b)](#b) and [(c)](#c) of this section, as applicable to your affected sources.
- (b) If you control equipment leaks according to the requirements under [§ 63.7920(b)(1)](/cfr/40/63.7920.md?p=b-1), you must demonstrate initial compliance if you have met the requirements in paragraphs [(b)(1)](#b-1) and [(2)](#b-2) of this section.
  - (1) You include the information required in [§ 63.1018(a)(1)](/cfr/40/63.1018.md?p=a-1) in your notification of compliance status report.
  - (2) **You have submitted as part of your notification of compliance status a signed statement that—**
    - (i) You will meet the requirements in [§§ 63.1002 through 63.1016](/cfr/40/63.1002..63.1016.md) that apply to your affected equipment.
    - (ii) You have identified the equipment subject to control according to the requirements in [§ 63.1003](/cfr/40/63.1003.md), including equipment designated as unsafe to monitor, and have records supporting the determinations with a written plan for monitoring the equipment according to the requirements in [§ 63.1003(c)(4)](/cfr/40/63.1003.md?p=c-4).
- (c) If you control equipment leaks according to the requirements under [§ 63.7920(b)(2)](/cfr/40/63.7920.md?p=b-2), you must demonstrate initial compliance if you have met the requirements in paragraphs [(c)(1)](#c-1) and [(2)](#c-2) of this section.
  - (1) You have included the information required in [§ 63.1039(a)](/cfr/40/63.1039.md?p=a) in your notification of compliance status report.
  - (2) **You have submitted as part of your notification of compliance status a signed statement that—**
    - (i) You will meet the requirements in [§§ 63.1021 through 63.1037](/cfr/40/63.1021..63.1037.md) that apply to your affected equipment.
    - (ii) You have identified the equipment subject to control according to the requirements in [§ 63.1022](/cfr/40/63.1022.md), including equipment designated as unsafe to monitor, and have records supporting the determinations with a written plan for monitoring the equipment according to the requirements in [§ 63.1022(c)(4)](/cfr/40/63.1022.md?p=c-4).

# §63.7922. How do I demonstrate continuous compliance with the work practice standards for equipment leaks?

- (a) You must demonstrate continuous compliance with the emissions limitations and work practice standards in [§ 63.7920](/cfr/40/63.7920.md) applicable to your affected equipment by meeting the requirements in [paragraphs (b) through (d)](#b..d) of this section that apply to you.
- (b) If you control equipment leaks according to the requirements under [§ 63.7920(b)(1)](/cfr/40/63.7920.md?p=b-1), you must demonstrate continuous compliance by inspecting, monitoring, repairing, and maintaining records according to the requirements in [§§ 63.1002 through 63.1018](/cfr/40/63.1002..63.1018.md) that apply to your affected equipment.
- (c) If you control equipment leaks according to the requirements under [§ 63.7920(b)(2)](/cfr/40/63.7920.md?p=b-2), you must demonstrate continuous compliance by inspecting, monitoring, repairing, and maintaining records according to the requirements in [§§ 63.1021 through 63.1039](/cfr/40/63.1021..63.1039.md) that apply to your affected equipment.
- (d) You must keep records to demonstrate compliance with the requirements according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).

# §63.7923. What monitoring and work practice standards must I meet for pressure relief devices?

- (a) For each pressure relief device in remediation material service, you must comply with either paragraph [(a)(1)](#a-1) or [(2)](#a-2) of this section following a pressure release actuation event, as applicable.
  - (1) If the pressure relief device does not consist of or include a rupture disk, return the pressure relief device to the normal operating conditions specified in [§ 63.7920(e)](/cfr/40/63.7920.md?p=e) as soon as practicable and conduct instrument monitoring by the method specified in [§ 63.1004(b)](/cfr/40/63.1004.md?p=b) or [§ 63.1023(b)](/cfr/40/63.1023.md?p=b), as applicable, no later than 5 calendar days after the pressure release device returns to remediation material service following a pressure release actuation event, except as provided in [§ 63.1024(d)](/cfr/40/63.1024.md?p=d) or of [§ 63.1005(c)](/cfr/40/63.1005.md?p=c), as applicable.
  - (2) If the pressure relief device consists of or includes a rupture disk, except as provided in [§ 63.1024(d)](/cfr/40/63.1024.md?p=d) or [§ 63.1005(c)](/cfr/40/63.1005.md?p=c), as applicable, install a replacement disk as soon as practicable but no later than 5 calendar days after the pressure release actuation event.
- (b) Except for the pressure relief devices described in [paragraph (e)](#e) of this section, you must comply with the requirements of paragraphs [(c)](#c) and [(d)](#d) of this section for each pressure relief device in remediation material service.
- (c) Equip each pressure relief device in remediation material service with a device(s) or use a monitoring system sufficient to indicate a pressure release to the atmosphere. The device or monitoring system may be either specific to the pressure release device itself or may be associated with the process system or piping. Examples of these types of devices or monitoring systems include, but are not limited to, a rupture disk indicator, magnetic sensor, motion detector on the pressure relief valve stem, flow monitor, pressure monitor, or parametric monitoring system. The device(s) or monitoring systems must be capable of meeting the requirements specified in [paragraphs (c)(1) through (3)](#c-1..c-3) of this section.
  - (1) Identifying the pressure release;
  - (2) Recording the time and duration of each pressure release; and
  - (3) **Notifying operators immediately that a pressure release is occurring.**
- (d) If any pressure relief device in remediation material service releases directly to the atmosphere as a result of a pressure release actuation event, follow the requirements of [paragraphs (d)(1) through (6)](#d-1..d-6) of this section.
  - (1) Calculate the quantity of HAP listed in Table 1 of this subpart released during each pressure release actuation event. Calculations may be based on data from the pressure relief device monitoring alone or in combination with process parameter monitoring data and process knowledge.
  - (2) Determine the total number of pressure release actuation events that occurred during the calendar year for each pressure relief device.
  - (3) Determine the total number of pressure release actuation events for each pressure relief device for which the analysis conducted as required by [paragraph (d)(4)](#d-4) of this section concluded that the pressure release was due to a force majeure event, as defined in [§ 63.7957](/cfr/40/63.7957.md).
  - (4) Complete an analysis to determine the source, nature and cause of each pressure release actuation event as soon as practicable, but no later than 45 days after a pressure release actuation event.
  - (5) Identify corrective measures to prevent future such pressure release actuation events as soon as practicable, but no later than 45 days after a pressure release actuation event.
  - (6) Implement the corrective measure(s) identified as required by [paragraph (d)(5)](#d-5) of this section within 45 days of the pressure release actuation event or as soon thereafter as practicable. For corrective measures that cannot be fully implemented within 45 days following the pressure release actuation event, you must record the corrective measure(s) completed to date, and, for measure(s) not already completed, a schedule for implementation, including proposed commencement and completion dates, no later than 45 days following the pressure release actuation event.
- (e) The pressure relief devices listed in [paragraphs (e)(1) through (6)](#e-1..e-6) are not subject to the requirements in paragraph [(c)](#c) or [(d)](#d) of this section.
  - (1) Pressure relief devices designed and operated to route all pressure releases through a closed vent system to a drain system meeting the requirements of [§§ 63.7915-63.7918](/cfr/40/63.7915-63.7918.md), or to a fuel gas system, process or control device meeting the requirements of [§§ 63.7925 through 63.7928](/cfr/40/63.7925..63.7928.md).
  - (2) Pressure relief devices in heavy liquid service, as defined in [§ 63.1001](/cfr/40/63.1001.md) or [§ 63.1020](/cfr/40/63.1020.md), as applicable.
  - (3) **Thermal expansion relief valves.**
  - (4) Pilot-operated pressure relief devices where the primary release valve is routed through a closed vent system to a control device or back into the process, to the fuel gas system, or to a drain system.
  - (5) Balanced bellows pressure relief devices where the primary release valve is routed through a closed vent system to a control device or back into the process, to the fuel gas system, or to a drain system.
  - (6) Pressure relief devices on containers, as defined in [§ 63.7957](/cfr/40/63.7957.md).
- (f) Except for the pressure relief devices described in [paragraph (e)](#e) of this section, it is a violation of the requirements of paragraphs [(c)](#c) and [(d)](#d) of this section for any pressure relief device in remediation material service to release directly to the atmosphere as a result of a pressure release actuation event(s) described in [paragraphs (f)(1) through (3)](#f-1..f-3) of this section.
  - (1) Any pressure release actuation event for which the cause of the event determined as required by [paragraph (d)(4)](#d-4) of this section was determined to be operator error or poor maintenance.
  - (2) A second pressure release actuation event, not including force majeure events, from a single pressure relief device in a 3 calendar-year period for the same cause for the same equipment.
  - (3) A third pressure release actuation event, not including force majeure events, from a single pressure relief device in a 3 calendar-year period for any reason.

# §63.7925. What emissions limitations and work practice standards must I meet for closed vent systems and control devices?

- (a) For each closed-vent system and control device you use to comply with requirements in [§§ 63.7890 through 63.7922](/cfr/40/63.7890..63.7922.md), as applicable to your affected sources, you must meet the emissions limitations and work practice standards in this section.
- (b) You must comply with [paragraph (b)(2)](#b-2) of this section, and [paragraph (b)(1)](#b-1) of this section does not apply, if your initial startup date is after September 3, 2019. If your initial startup date was on or before September 3, 2019, you must comply with paragraph [(b)(1)](#b-1) or [(2)](#b-2) of this section until January 7, 2021, and after that date, you must comply with [paragraph (b)(2)](#b-2) of this section, and [paragraph (b)(1)](#b-1) of this section does not apply.
  - (1) Whenever gases or vapors containing HAP are vented through the closed-vent system to the control device, the control device must be operating except at those times listed in either paragraph [(b)(1)(i)](#b-1-i) or [(ii)](#b-1-ii) of this section.
    - (i) The control device may be bypassed for the purpose of performing planned routine maintenance of the closed-vent system or control device in situations when the routine maintenance cannot be performed during periods that the emission point vented to the control device is shutdown. On an annual basis, the total time that the closed-vent system or control device is bypassed to perform routine maintenance must not exceed 240 hours per each calendar year.
    - (ii) The control device may be bypassed for the purpose of correcting a malfunction of the closed-vent system or control device. You must perform the adjustments or repairs necessary to correct the malfunction as soon as practicable after the malfunction is detected.
  - (2) Whenever gases or vapors containing HAP are vented through the closed-vent system to the control device, the control device must be operating, except that the control device on a tank may be bypassed for the purpose of performing planned routine maintenance of the control device. When the tank control device is bypassed, the owner or operator must comply with [paragraphs (b)(2)(i) through (iii)](#b-2-i..b-2-iii) of this section.
    - (i) The control device may only be bypassed when the planned routine maintenance cannot be performed during periods that tank emissions are vented to the control device.
    - (ii) On an annual basis, the total time that the closed-vent system or control device is bypassed to perform routine maintenance must not exceed 240 hours per each calendar year.
    - (iii) The level of material in the tank must not be increased during periods that the closed-vent system or control device is bypassed to perform planned routine maintenance.
- (c) For each closed vent system, you must meet the work practice standards in [§ 63.693(c)](/cfr/40/63.693.md?p=c).
- (d) For each control device other than a flare or a control device used to comply with the facility-wide process vent emission limits in [§ 63.7890(b)](/cfr/40/63.7890.md?p=b), you must control HAP emissions to meet either of the emissions limits in paragraphs [(d)(1)](#d-1) or [(2)](#d-2) of this section except as provided for in [paragraph (f)](#f) of this section.
  - (1) Reduce emissions of total HAP listed in Table 1 of this subpart or TOC (minus methane and ethane) from each control device by 95 percent by weight; or
  - (2) Limit the concentration of total HAP listed in Table 1 of this subpart or TOC (minus methane and ethane) from each combustion control device (a thermal incinerator, catalytic incinerator, boiler, or process heater) to 20 ppmv or less on a dry basis corrected to 3 percent oxygen.
- (e) If you use a flare for your control device, then you must meet the requirements for flares in [§ 63.11(b)](/cfr/40/63.11.md?p=b).
- (f) If you use a process heater or boiler for your control device, then as alternative to meeting the emissions limits in [paragraph (d)](#d) of this section you may choose to comply with one of the work practice standards in [paragraphs (f)(1) through (3)](#f-1..f-3) of this section.
  - (1) Introduce the vent stream into the flame zone of the boiler or process heater and maintain the conditions in the combustion chamber at a residence time of 0.5 seconds or longer and at a temperature of 760 °C or higher; or
  - (2) Introduce the vent stream with the fuel that provides the predominate heat input to the boiler or process heater (i.e., the primary fuel); or
  - (3) Introduce the vent stream to a boiler or process heater for which you either have been issued a final permit under [40 CFR part 270](/cfr/40/part270.md) and complies with the requirements of [40 CFR part 266](/cfr/40/part266.md), [subpart H](/cfr/40/subpartH.md)—Hazardous Waste Burned in Boilers and Industrial Furnaces; or has certified compliance with the interim status requirements of [40 CFR part 266](/cfr/40/part266.md), subpart H.
- (g) For each control device other than a flare, you must meet each operating limit in [paragraphs (g)(1) through (6)](#g-1..g-6) of this section that applies to your control device.
  - (1) If you use a regenerable carbon adsorption system, you must:
    - (i) Maintain the hourly average total regeneration stream mass flow during the adsorption bed regeneration cycle greater than or equal to the stream mass flow established in the design evaluation or performance test.
    - (ii) Maintain the hourly average temperature of the adsorption bed during regeneration (except during the cooling cycle) greater than or equal to the temperature established during the design evaluation or performance test.
    - (iii) Maintain the hourly average temperature of the adsorption bed after regeneration (and within 15 minutes after completing any cooling cycle) less than or equal to the temperature established during the design evaluation.
    - (iv) Maintain the frequency of regeneration greater than or equal to the frequency established during the design evaluation.
  - (2) If you use a nonregenerable carbon adsorption system, you must maintain the hourly average temperature of the adsorption bed less than or equal to the temperature established during the design evaluation or performance test.
  - (3) If you use a condenser, you must maintain the daily average condenser exit temperature less than or equal to the temperature established during the design evaluation or performance test.
  - (4) If you use a thermal incinerator, you must maintain the daily average firebox temperature greater than or equal to the temperature established in the design evaluation or during the performance test.
  - (5) If you use a catalytic incinerator, you must maintain the daily average temperature difference across the catalyst bed greater than or equal to the minimum temperature difference established during the performance test or design evaluation.
  - (6) If you use a boiler or process heater to comply with an emission limit in [paragraph (d)](#d) of this section, you must maintain the daily average firebox temperature within the operating level established during the design evaluation or performance test.
- (h) If you use a carbon adsorption system as your control, you must meet each work practice standard in [paragraphs (h)(1) through (3)](#h-1..h-3) of this section that applies to your control device.
  - (1) If you use a regenerable carbon adsorption system, you must:
    - (i) Replace the existing adsorbent in each segment of the bed with an adsorbent that meets the replacement specifications established during the design evaluation before the age of the adsorbent exceeds the maximum allowable age established during the design evaluation.
    - (ii) Follow the disposal requirements for spent carbon in [§ 63.693(d)(4)](/cfr/40/63.693.md?p=d-4).
  - (2) If you use a nonregenerable carbon adsorption system, you must:
    - (i) Replace the existing adsorbent in each segment of the bed with an adsorbent that meets the replacement specifications established during the design evaluation before the age of the adsorbent exceeds the maximum allowable age established during the design evaluation.
    - (ii) Meet the disposal requirements for spent carbon in [§ 63.693(d)(4)(ii)](/cfr/40/63.693.md?p=d-4-ii).
  - (3) If you use a nonregenerative carbon adsorption system, you may choose to comply with the requirements in paragraphs [(h)(3)(i)](#h-3-i) and [(ii)](#h-3-ii) of this section as an alternative to the requirements in [paragraph (h)(2)](#h-2) of this section. You must:
    - (i) Immediately replace the carbon canister or carbon in the control device when the monitoring device indicates breakthrough has occurred according to the requirements in [§ 63.693(d)(4)(iii)(A)](/cfr/40/63.693.md?p=d-4-iii-A), or replace the carbon canister or carbon in the control device at regular intervals according to the requirements in [§ 63.693(d)(4)(iii)(B)](/cfr/40/63.693.md?p=d-4-iii-B).
    - (ii) Follow the disposal requirements for spent carbon in [§ 63.693(d)(4)(ii)](/cfr/40/63.693.md?p=d-4-ii).
- (i) If you use a catalytic incinerator, you must replace the existing catalyst bed with a bed that meets the replacement specifications before the age of the bed exceeds the maximum allowable age established in the design evaluation or during the performance test.
- (j) As provided in [§ 63.6(g)](/cfr/40/63.6.md?p=g), you may request approval from the EPA to use an alternative to the work practice standards in this section that apply to your closed vent systems and control devices. If you request for permission to use an alternative to the work practice standards, you must submit the information described in [§ 63.6(g)(2)](/cfr/40/63.6.md?p=g-2).

# §63.7926. How do I demonstrate initial compliance with the emission limitations and work practice standards for closed vent systems and control devices?

- (a) You must demonstrate initial compliance with the emissions limitations and work practice standards in this subpart applicable to your closed vent system and control device by meeting the requirements in [paragraphs (b) through (h)](#b..h) of this section that apply to your closed vent system and control device.
- (b) You must demonstrate initial compliance with the closed vent system work practice standards in [§ 63.7925(c)](/cfr/40/63.7925.md?p=c) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(b)(1)](#b-1) and [(2)](#b-2) of this section.
  - (1) You have installed a closed vent system that meets the requirements in § [63.695(c)(1)](/cfr/40/63.695.md?p=c-1) and [(2)](/cfr/40/63.695.md?p=c-2), and you have records documenting the equipment design and installation.
  - (2) You have performed the initial inspection of the closed vent system according to the requirements in § [63.695(c)(1)(i)](/cfr/40/63.695.md?p=c-1-i) or [(ii)](/cfr/40/63.695.md?p=c-1-ii), and you have records documenting the inspection results.
- (c) You must demonstrate initial compliance of each control device subject to the emissions limits in [§ 63.7925(d)](/cfr/40/63.7925.md?p=d) with the applicable emissions limit in [§ 63.7925(d)](/cfr/40/63.7925.md?p=d) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(c)(1)](#c-1) and [(2)](#c-2) of this section that apply to you.
  - (1) For the emissions limit in [§ 63.7925(d)(1)](/cfr/40/63.7925.md?p=d-1), the emissions of total HAP listed in Table 1 of this subpart or TOC (minus methane and ethane) from the control device, measured or determined according to the procedures for performance tests and design evaluations in [§ 63.7941](/cfr/40/63.7941.md), are reduced by at least 95 percent by weight.
  - (2) For the emissions limit in [§ 63.7925(d)(2)](/cfr/40/63.7925.md?p=d-2), the concentration of total HAP listed in Table 1 of this subpart or TOC (minus methane and ethane) from the combustion control device, measured by a performance test or determined by a design evaluation according to the procedures in [§ 63.7941](/cfr/40/63.7941.md), do not exceed 20 ppmv on a dry basis corrected to 3 percent oxygen.
- (d) You must demonstrate initial compliance of each control device subject to operating limits in [§ 63.7925(g)](/cfr/40/63.7925.md?p=g) with the applicable limits if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(d)(1)](#d-1) and [(2)](#d-2) of this section.
  - (1) You have established an appropriate operating limit(s) for each of the operating parameter applicable to your control device as specified in [§ 63.7925(g)(1) through (6)](/cfr/40/63.7925.md?p=g-1..g-6).
  - (2) You have a record of the applicable operating parameter data during the performance test or design evaluation during which the emissions met the applicable limit.
- (e) You must demonstrate initial compliance with the spent carbon replacement and disposal work practice standards for carbon adsorption systems in [§ 63.7925(h)](/cfr/40/63.7925.md?p=h) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you will comply with each work practice standard that applies to your carbon adsorption system.
- (f) You must demonstrate initial compliance with the catalyst replacement work practice standards for catalytic incinerators in [§ 63.7925(i)](/cfr/40/63.7925.md?p=i) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you will comply with the specified work practice standard.
- (g) You must demonstrate initial compliance of each flare with the work practice standards in [§ 63.7925(e)](/cfr/40/63.7925.md?p=e) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in [paragraphs (g)(1) through (3)](#g-1..g-3) of this section.
  - (1) Each flare meets the requirements in [§ 63.11(b)](/cfr/40/63.11.md?p=b).
  - (2) You have performed a visible emissions test, determined the net heating value of gas being combusted, and determined the flare exit velocity as required in [§ 63.693(h)(2)](/cfr/40/63.693.md?p=h-2).
  - (3) You will operate each flare according to the requirements in [§ 63.11(b)](/cfr/40/63.11.md?p=b).
- (h) You must demonstrate initial compliance of each boiler or process heater with the work practice standards in [§ 63.7925(f)](/cfr/40/63.7925.md?p=f) if you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in [paragraphs (h)(1) through (3)](#h-1..h-3) of this section.
  - (1) For the work practice standards in [§ 63.7925(f)(1)](/cfr/40/63.7925.md?p=f-1), you have records documenting that the boiler or process heater is designed to operate at a residence time of 0.5 seconds or greater and maintain the combustion zone temperature at 760 °C or greater.
  - (2) For the work practice standard in [§ 63.7925(f)(2)](/cfr/40/63.7925.md?p=f-2), you have records documenting that the vent stream is introduced with the fuel according to the requirements in [§ 63.693(g)(1)(iv)](/cfr/40/63.693.md?p=g-1-iv), or that the vent stream is introduced to a boiler or process heater that meets the requirements in [§ 63.693(g)(1)(v)](/cfr/40/63.693.md?p=g-1-v).
  - (3) For the work practice standard in [§ 63.7925(f)(3)](/cfr/40/63.7925.md?p=f-3), you have records documenting you either have been issued a final permit under [40 CFR part 270](/cfr/40/part270.md) and your boiler or process heater complies with the requirements of [40 CFR part 266](/cfr/40/part266.md), [subpart H](/cfr/40/subpartH.md)—Hazardous Waste Burned in Boilers and Industrial Furnaces; or has been certified in compliance with the interim status requirements of [40 CFR part 266](/cfr/40/part266.md), subpart H.

# §63.7927. What are my inspection and monitoring requirements for closed vent systems and control devices?

- (a) You must comply with the requirements in paragraphs [(a)(1)](#a-1) and [(2)](#a-2) of this section for each closed vent system.
  - (1) You must monitor and inspect each closed vent system according to the requirements in either paragraph [(a)(1)(i)](#a-1-i) or [(ii)](#a-1-ii) of this section.
    - (i) You must monitor, inspect, and repair defects according to the requirements in [§ 63.695(c)(1)(ii) through (c)(3)](/cfr/40/63.695.md?p=c-1-ii..c-c-3); or
    - (ii) You must monitor and inspect the closed vent system according to the requirements in [§ 63.172(f) through (j)](/cfr/40/63.172.md?p=f..j) and record the information in [§ 63.181](/cfr/40/63.181.md).
  - (2) If your closed vent system includes a bypass device, you must meet the requirements in either paragraph [(a)(2)(i)](#a-2-i) or [(ii)](#a-2-ii) of this section.
    - (i) Use a flow indicator to determine if the presence of flow according to the requirements in [§ 63.693(c)(2)(i)](/cfr/40/63.693.md?p=c-2-i); or
    - (ii) Use a seal or locking device and make monthly inspections as required by [§ 63.693(c)(2)(ii)](/cfr/40/63.693.md?p=c-2-ii).
- (b) If you use a regenerable carbon adsorption system, you must meet the requirements in [paragraphs (b)(1) through (3)](#b-1..b-3) of this section.
  - (1) Use a continuous parameter monitoring system (CPMS) to measure and record the hourly average total regeneration stream mass flow during each carbon adsorption cycle.
  - (2) Use a CPMS to measure and record the hourly average temperature of the adsorption bed during regeneration (except during the cooling cycle).
  - (3) Use a CPMS to measure and record the hourly average temperature of the adsorption bed after regeneration (and within 15 minutes after completing any cooling cycle).
- (c) If you use a nonregenerable carbon adsorption system, you must use a CPMS to measure and record the hourly average temperature of the adsorption bed or you must monitor the concentration of organic compounds in the exhaust vent stream according to the requirements in [§ 63.693(d)(4)(iii)(A)](/cfr/40/63.693.md?p=d-4-iii-A).
- (d) If you use a condenser, you must use a CPMS to measure and record the hourly average condenser exit temperature and determine and record the daily average condenser exit temperature.
- (e) If you use a thermal incinerator, you must use a CPMS to measure and record the hourly average firebox temperature and determine and record the daily average firebox temperature.
- (f) If you use a catalytic incinerator, you must use a CPMS with two temperature sensors to measure and record the hourly average temperature at the inlet of the catalyst bed, the hourly average temperature at the outlet of the catalyst bed, the hourly average temperature difference across the catalyst bed, and to determine and record the daily average temperature difference across the catalyst bed.
- (g) If you use a boiler or process heater to meet an emission limitation, you must use a CPMS to measure and record the hourly average firebox temperature and determine and record the daily average firebox temperature.
- (h) If you use a flare, you must monitor the operation of the flare using a heat sensing monitoring device according to the requirements in [§ 63.693(h)(3)](/cfr/40/63.693.md?p=h-3).
- (i) If you introduce the vent stream into the flame zone of a boiler or process heater according to the requirements in [§ 63.7925(f)(1)](/cfr/40/63.7925.md?p=f-1), you must use a CPMS to measure and record the combustion zone temperature.

# §63.7928. How do I demonstrate continuous compliance with the emissions limitations and work practice standards for closed vent systems and control devices?

- (a) You must demonstrate continuous compliance with the emissions limitations and work practice standards in this subpart applicable to your closed vent system and control device by meeting the requirements in [paragraphs (b) through (j)](#b..j) of this section as applicable to your closed vent system and control device.
- (b) You must demonstrate continuous compliance with the closed vent system work practice standards in [§ 63.7925(c)](/cfr/40/63.7925.md?p=c) by meeting the requirements in [paragraphs (b)(1) through (7)](#b-1..b-7) of this section.
  - (1) For a closed vent system designed to operate with no detectable organic emissions, visually inspecting the closed vent system at least annually, monitoring after a repair or replacement using the procedures in [§ 63.694(k)](/cfr/40/63.694.md?p=k), and monitoring at least annually according to the requirements in [§ 63.695(c)(1)(ii)](/cfr/40/63.695.md?p=c-1-ii).
  - (2) For a closed vent system designed to operate below atmospheric pressure, visually inspecting the closed vent system at least annually according to the requirements in [§ 63.695(c)(2)(ii)](/cfr/40/63.695.md?p=c-2-ii).
  - (3) Repairing defects according to the requirements in [§ 63.695(c)(3)](/cfr/40/63.695.md?p=c-3).
  - (4) Keeping records of each inspection that include the information in [paragraphs (b)(4)(i) through (iii)](#b-4-i..b-4-iii) of this section:
    - (i) **A closed vent system identification number (or other unique identification description you select).**
    - (ii) **Date of each inspection.**
    - (iii) If a defect is detected during an inspection, the location of the defect, a description of the defect, the date of detection, the corrective action taken to repair the defect, and if repair is delayed, the reason for any delay and the date completion of the repair is expected.
  - (5) If you elect to monitor the closed vent system according to the requirements in [§ 63.172(f) through (j)](/cfr/40/63.172.md?p=f..j), recording the information in [§ 63.181](/cfr/40/63.181.md).
  - (6) If the closed vent system is equipped with a flow indicator, recording the information in [§ 63.693(c)(2)(i)](/cfr/40/63.693.md?p=c-2-i).
  - (7) If the closed vent system is equipped with a seal or locking device, visually inspecting the seal or closure mechanism at least monthly according to the requirements in [§ 63.693(c)(2)(ii)](/cfr/40/63.693.md?p=c-2-ii), and recording the results of each inspection.
- (c) You must demonstrate continuous compliance of each control device subject to the emissions limits in [§ 63.7925(d)](/cfr/40/63.7925.md?p=d) with the applicable emissions limit in [§ 63.7925(d)](/cfr/40/63.7925.md?p=d) by meeting the requirements in paragraph [(c)(1)](#c-1) or [(2)](#c-2) of this section.
  - (1) For the emission limit in [§ 63.7925(d)(1)](/cfr/40/63.7925.md?p=d-1), maintaining the reduction in emissions of total HAP listed in Table 1 of this subpart or TOC (minus methane and ethane) from the control device at 95 percent by weight or greater.
  - (2) For the emission limit in [§ 63.7925(d)(2)](/cfr/40/63.7925.md?p=d-2), maintaining the concentration of total HAP listed in Table 1 of this subpart or TOC (minus methane and ethane) from the control device at 20 ppmv or less.
- (d) You must demonstrate continuous compliance of each control device subject to operating limits in [§ 63.7925(g)](/cfr/40/63.7925.md?p=g) with the applicable limits by meeting the requirements in [paragraphs (d)(1) through (4)](#d-1..d-4) of this section.
  - (1) Maintaining each operating limit according to the requirements in [§ 63.7925(g)](/cfr/40/63.7925.md?p=g) as applicable to the control device.
  - (2) Monitoring and inspecting each control device according to the requirements in [§ 63.7927(b) through (i)](/cfr/40/63.7927.md?p=b..i) as applicable to the control device.
  - (3) Operating and maintaining each continuous monitoring system according to the requirements in [§ 63.7945](/cfr/40/63.7945.md), and collecting and reducing data according to the requirements in [§ 63.7946](/cfr/40/63.7946.md).
  - (4) Keeping records to document compliance with the requirements of this subpart according to the requirements in [§ 63.7952](/cfr/40/63.7952.md).
- (e) You must demonstrate continuous compliance with the spent carbon replacement and disposal work practice standards for regenerable carbon adsorption systems in [§ 63.7925(h)(1)](/cfr/40/63.7925.md?p=h-1) by meeting the requirements in [paragraphs (e)(1) through (3)](#e-1..e-3) of this section.
  - (1) Replacing the adsorbent as required by [§ 63.7925(h)(1)(i)](/cfr/40/63.7925.md?p=h-1-i).
  - (2) Following the disposal requirements for spent carbon in [§ 63.693(d)(4)(ii)](/cfr/40/63.693.md?p=d-4-ii).
  - (3) **Keeping records to document compliance with the requirements of the work practice standards.**
- (f) You must demonstrate continuous compliance with the spent carbon replacement and disposal work practice standards for nonregenerable carbon adsorption systems in [§ 63.7925(h)(2)](/cfr/40/63.7925.md?p=h-2) by meeting the requirements in [paragraphs (f)(1) through (3)](#f-1..f-3) of this section.
  - (1) Replacing the adsorbent as required by the work practice standard in [§ 63.7925(h)(2)(i)](/cfr/40/63.7925.md?p=h-2-i).
  - (2) Following the disposal requirements for spent carbon in [§ 63.693(d)(4)(ii)](/cfr/40/63.693.md?p=d-4-ii).
  - (3) **Keeping records to document compliance with the requirements of the work practice standards.**
- (g) You must demonstrate continuous compliance with the spent carbon replacement and disposal work practice standards for nonregenerable carbon adsorption systems in [§ 63.7925(h)(3)](/cfr/40/63.7925.md?p=h-3) by meeting the requirements in [paragraphs (g)(1) through (3)](#g-1..g-3) of this section.
  - (1) Monitoring the concentration level of the organic compounds in the exhaust vent for the carbon adsorption system as required in [§ 63.7927(c)](/cfr/40/63.7927.md?p=c), immediately replacing the carbon canister or carbon in the control device when breakthrough is indicated by the monitoring device, and recording the date of breakthrough and carbon replacement. Or, you must replace the carbon canister or carbon in the control device at regular intervals and record the date of carbon replacement.
  - (2) Following the disposal requirements for spent carbon in [§ 63.693(d)(4)(ii)](/cfr/40/63.693.md?p=d-4-ii).
  - (3) **Keeping records to document compliance with the requirements of the work practice standards.**
- (h) You must demonstrate continuous compliance with the catalyst replacement work practice standards for catalytic incinerators in [§ 63.7925(i)](/cfr/40/63.7925.md?p=i) by meeting the requirements in paragraphs [(h)(1)](#h-1) and [(2)](#h-2) of this section.
  - (1) Replacing the existing catalyst bed as required in [§ 63.7925(i)](/cfr/40/63.7925.md?p=i).
  - (2) **Keeping records to document compliance with the requirements of the work practice standards.**
    - (i) You must demonstrate continuous compliance of each flare with the work practice standards in [§ 63.7925(e)](/cfr/40/63.7925.md?p=e) by meeting the requirements in [paragraphs (i)(1) through (5)](#h-i-1..h-i-5) of this section.
  - (1) Operating the flare with no visible emissions except for up to 5 minutes in any 2 consecutive hours according to the requirements in [§ 63.11(b)(4)](/cfr/40/63.11.md?p=b-4).
  - (2) Monitoring the presence of a pilot flare according to the requirements in [§ 63.7927(h)](/cfr/40/63.7927.md?p=h) and maintaining a pilot flame and flare flame at all times that emissions are not vented to the flare according to the requirements in [§ 63.11(b)(5)](/cfr/40/63.11.md?p=b-5).
  - (3) Operating the flare with an exit velocity according to the requirements in [§ 63.11(b)(6) through (8)](/cfr/40/63.11.md?p=b-6..b-8).
  - (4) Operating the flare with a net heating value of the gas being combusted according to the requirements in [§ 63.11(b)(6)(ii)](/cfr/40/63.11.md?p=b-6-ii).
  - (5) **Keeping records to document compliance with the requirements of the work practice standards.**
- (j) You must demonstrate continuous compliance of each boiler or process heater with the work practice standards in [§ 63.7925(f)](/cfr/40/63.7925.md?p=f) by meeting the requirements in [paragraphs (j)(1) through (3)](#j-1..j-3) of this section.
  - (1) For the work practice standards in [§ 63.7925(f)(1)](/cfr/40/63.7925.md?p=f-1), you must demonstrate continuous compliance by meeting the requirements in [paragraphs (j)(1)(i) through (iv)](#j-1-i..j-1-iv).
    - (i) Maintaining conditions in the combustion chamber at a residence time of 0.5 seconds or longer and at a combustion zone temperature at 760 °C or greater whenever the vent stream is introduced to the flame zone of the boiler or process heater.
    - (ii) Monitoring each boiler or process heater according to the requirements in [§ 63.7927(i)](/cfr/40/63.7927.md?p=i).
    - (iii) Operating and maintaining each continuous monitoring system according to the requirements in [§ 63.7945](/cfr/40/63.7945.md), and collecting and reducing data according to the requirements in [§ 63.7946](/cfr/40/63.7946.md).
    - (iv) **Keeping records to document compliance with residence time design requirement.**
  - (2) For the work practice standards in [§ 63.7925(f)(2)](/cfr/40/63.7925.md?p=f-2), you maintain the boiler or process heater operations such that the vent stream is introduced with the fuel according to the requirements in [§ 63.693(g)(1)(iv)](/cfr/40/63.693.md?p=g-1-iv), or that the vent stream is introduced to a boiler or process heater that meets the requirements in [§ 63.693(g)(1)(v)](/cfr/40/63.693.md?p=g-1-v).
  - (3) For the work practice standard in [§ 63.7925(f)(3)](/cfr/40/63.7925.md?p=f-3), you remain in compliance with all terms and conditions of the final permit under [40 CFR part 270](/cfr/40/part270.md) and your boiler or process heater complies with the requirements of [40 CFR part 266](/cfr/40/part266.md), [subpart H](/cfr/40/subpartH.md)—Hazardous Waste Burned in Boilers and Industrial Furnaces; or in compliance with the interim status requirements of [40 CFR part 266](/cfr/40/part266.md), [subpart H](/cfr/40/subpartH.md), as applicable to your boiler or process heater.

# §63.7935. What are my general requirements for complying with this subpart?

- (a) If your initial startup was on or before September 3, 2019, you must be in compliance with the emissions limitations (including operating limits) and the work practice standards in this subpart at all times, except, until January 6, 2021, during periods of startup, shutdown, and malfunction. If your initial startup was after September 3, 2019, then as of July 10, 2020, and for all sources, after January 6, 2021, you must be in compliance with the emission limitations (including operating limits) and the work practice standards in this subpart at all times.
- (b) If your initial startup was on or before September 3, 2019, then until January 6, 2021, you must operate and maintain your affected source, including air pollution control and monitoring equipment, according to the provisions in [§ 63.6(e)(1)(i)](/cfr/40/63.6.md?p=e-1-i). If your initial startup was after September 3, 2019, then as of July 10, 2020, and for all sources after January 6, 2021, at all times, you must operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. The general duty to minimize emissions does not require you to make any further efforts to reduce emissions if levels required by the applicable standard have been achieved. Determination of whether a source is operating in compliance with operation and maintenance requirements will be based on information available to the Administrator which may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source.
- (c) If your initial startup date was on or before September 3, 2019, then until January 6, 2021, you must develop a written startup, shutdown, and malfunction plan (SSMP) according to the provisions in [§ 63.6(e)(3)](/cfr/40/63.6.md?p=e-3), and a SSMP is not required after January 6, 2021. No SSMP is required for any source for which the initial startup date is after September 3, 2019.
- (d) [Reserved]
- (e) You must report each instance in which you did not meet each emissions limitation and each operating limit that applies to you. You must also report each instance in which you did not meet the requirements for work practice standards that apply to you. These instances are deviations from the emissions limitations and work practice standards in this subpart. These deviations must be reported according to the requirements in [§ 63.7951](/cfr/40/63.7951.md).
- (f) If your initial start date was on or before September 3, 2019, consistent with §§ [63.6(e)](/cfr/40/63.6.md?p=e) and [63.7(e)(1)](/cfr/40/63.7.md?p=e-1), then until January 6, 2021, deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's satisfaction that you were operating in accordance with [§ 63.6(e)(1)](/cfr/40/63.6.md?p=e-1). We will determine whether deviations that occur during a period of startup, shutdown, or malfunction are violations, according to the provisions in [§ 63.6(e)](/cfr/40/63.6.md?p=e). If your initial startup was after September 3, 2019, then as of July 10, 2020, and for all sources after January 6, 2021, you must be in compliance with the emission limitations in this subpart at all times (unless a longer timeframe for compliance is expressly provided in this subpart), and we will determine whether deviations that occur during a period of startup, shutdown, or malfunction are violations according to the provisions in § [63.7935(a)](#a) and [(b)](#b).
- (g) For each monitoring system required in this section, you must develop and make available for inspection by the permitting authority, upon request, a site-specific monitoring plan that addresses the following:
  - (1) Installation of the continuous monitoring system sampling probe or other interface at a measurement location relative to each affected process unit such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
  - (2) Performance and equipment specifications for the sample interface, the pollutant concentration or parametric signal analyzer, and the data collection and reduction system.
  - (3) Performance evaluation procedures and acceptance criteria (e.g., calibrations).
  - (4) Continuous monitoring system (CMS) operation and maintenance requirements in accordance with [§ 63.7945](/cfr/40/63.7945.md).
  - (5) CMS data collection in accordance with [§ 63.7946](/cfr/40/63.7946.md).
- (h) In your site-specific monitoring plan, you must also address the following:
  - (1) If your initial startup was on or before September 3, 2019, then until January 6, 2021, you must address ongoing operation and maintenance (O&M) procedures in accordance with the general requirements of § [63.8(c)(1)](/cfr/40/63.8.md?p=c-1), [(3)](/cfr/40/63.8.md?p=c-3), [(4)(ii)](/cfr/40/63.8.md?p=4-ii), [(7)](/cfr/40/63.8.md?p=4-7), and [(8)](/cfr/40/63.8.md?p=4-8). If your initial startup was after September 3, 2019, then as of July 10, 2020, and for all sources after January 6, 2021, you must address ongoing O&M procedures in accordance with the general requirements of § [63.8(c)(1)(ii)](/cfr/40/63.8.md?p=c-1-ii), [(c)(3)](/cfr/40/63.8.md?p=c-c-3), [(c)(4)(ii)](/cfr/40/63.8.md?p=c-4-ii), and [(c)(7)](/cfr/40/63.8.md?p=c-c-7) and [(8)](/cfr/40/63.8.md?p=c-c-8).
  - (2) If your initial startup was on or before September 3, 2019, then until January 6, 2021, you must address ongoing data quality assurance procedures in accordance with the general requirements of [§ 63.8(d)](/cfr/40/63.8.md?p=d). If your initial startup was after September 3, 2019, then as of July 10, 2020, and for all sources after January 6, 2021, you must address ongoing data quality assurance procedures in accordance with the general requirements of [§ 63.8(d)](/cfr/40/63.8.md?p=d) except for the requirements related to startup, shutdown, and malfunction plans referenced in [§ 63.8(d)(3)](/cfr/40/63.8.md?p=d-3). The owner or operator shall keep these written procedures on record for the life of the affected source or until the affected source is no longer subject to the provisions of this part, to be made available for inspection, upon request, by the Administrator. If the performance evaluation plan is revised, the owner or operator shall keep previous (i.e., superseded) versions of the performance evaluation plan on record to be made available for inspection, upon request, by the Administrator, for a period of 5 years after each revision to the plan. The program of corrective action should be included in the plan required under [§ 63.8(d)(2)](/cfr/40/63.8.md?p=d-2).
  - (3) If your initial startup was on or before September 3, 2019, then until January 6, 2021, you must address ongoing recordkeeping and reporting procedures in accordance with the general requirements of § [63.10(c)](/cfr/40/63.10.md?p=c), [(e)(1)](/cfr/40/63.10.md?p=e-1), and [(e)(2)(i)](/cfr/40/63.10.md?p=e-2-i). If your initial startup was after September 3, 2019, then as of July 10, 2020, and for all sources after January 6, 2021, you must address ongoing recordkeeping and reporting procedures in accordance with the general requirements of § [63.10(c)(1) through (14)](/cfr/40/63.10.md?p=c-1..c-14), [(e)(1)](/cfr/40/63.10.md?p=e-1), and [(e)(2)(i)](/cfr/40/63.10.md?p=e-2-i).
- (i) You must operate and maintain the continuous monitoring system according to the site-specific monitoring plan.
- (j) You must conduct a performance evaluation of each continuous monitoring according to your site-specific monitoring plan.

# §63.7936. What requirements must I meet if I transfer remediation material off-site to another facility?

- (a) If you transfer to another facility a remediation material generated by your remediation activities and having an average total VOHAP concentration equal to or greater than 10 ppmw (as determined using the procedures specified in [§ 63.7943](/cfr/40/63.7943.md)), then you must transfer the remediation material to a facility that meets the requirements in [paragraph (b)](#b) of this section. You must record the name, street address, and telephone number of the facility where you send this remediation material.
- (b) You may elect to transfer the remediation material to one of the following facilities:
  - (1) A facility where your remediation material will be directly disposed in a landfill or other land disposal unit according to all applicable Federal and State requirements.
  - (2) A facility subject to [40 CFR part 63](/cfr/40/part63.md), [subpart DD](/cfr/40/subpartDD.md) where the exemption under [§ 63.680(b)(2)(iii)](/cfr/40/63.680.md?p=b-2-iii) is waived and air emissions from the management of your remediation material at the facility are controlled according to all applicable requirements in the subpart for an off-site material. Prior to sending your remediation material, you must obtain a written statement from the owner or operator of the facility to which you send your remediation material acknowledging that the exemption under [§ 63.680(b)(2)(iii)](/cfr/40/63.680.md?p=b-2-iii) will be waived for all remediation material received at the facility from you and your material will be managed as an off-site material at the facility according to all applicable requirements. This statement must be signed by the responsible official of the receiving facility, provide the name and address of the receiving facility, and a copy sent to the appropriate EPA Regional Office at the addresses listed in [40 CFR 63.13](/cfr/40/63.13.md).
  - (3) A facility where your remediation material will be managed according to all applicable requirements under this Subpart.
    - (i) You must prepare and include a notice with each shipment or transport of remediation material from your site. This notice must state that the remediation material contains organic HAP that are to be treated according to the provisions of this subpart. When the transport is continuous or ongoing (for example, discharge to a publicly owned treatment works), the notice must be submitted to the receiving facility owner or operator initially and whenever there is a change in the required treatment.
    - (ii) You may not transfer the remediation material unless the owner or operator of the facility receiving your remediation material has submitted to the EPA a written certification that he or she will manage remediation material received from you according to the requirements of [§§ 63.7885 through 63.7957](/cfr/40/63.7885..63.7957.md). The receiving facility owner or operator may revoke the written certification by sending a written statement to the EPA and to you providing at least 90 days notice that they rescind acceptance of responsibility for compliance with the regulatory provisions listed in this section. Upon expiration of the notice period, you may not transfer your remediation material to the facility.
    - (iii) By providing the written certification to the EPA, the receiving facility owner or operator accepts responsibility for compliance with the regulatory provisions listed in [paragraph (b)(3)](#b-3) of this section with respect to any shipment of remediation material covered by the written certification. Failure to abide by any of those provisions with respect to such shipments may result in enforcement action by the EPA against the certifying entity according to the enforcement provisions applicable to violations of these provisions by owners or operators of sources.
    - (iv) Written certifications and revocation statements to the EPA from the receiving facility owner or operator must be signed by the responsible official of the receiving facility, provide the name and address of the receiving facility, and a copy sent to the appropriate EPA Regional Office at the addresses listed in [40 CFR 63.13](/cfr/40/63.13.md). Such written certifications are not transferable.
- (c) Acceptance by a facility owner or operator of remediation material from a site remediation subject to this Subpart does not, by itself, require the facility owner or operator to obtain a title V permit under 40 CFR [70.3](/cfr/40/70.3.md) or [40](/cfr/40/40.md) CFR 71.3.

# §63.7937. How do I demonstrate initial compliance with the general standards?

- (a) You must demonstrate initial compliance with the general standards in [§§ 63.7884 through 63.7887](/cfr/40/63.7884..63.7887.md) that apply to your affected sources by meeting the requirements in [paragraphs (b) through (d)](#b..d) of this section, as applicable to you.
- (b) You must demonstrate initial compliance with the general standards in [§ 63.7885](/cfr/40/63.7885.md) that apply to your affected process vents by meeting the requirements in [paragraphs (b)(1) through (4)](#b-1..b-4) of this section, as applicable to your process vents.
  - (1) If HAP emissions are controlled from the affected process vents according to the emission limitations and work practice standards specified in [§ 63.7885(b)(1)](/cfr/40/63.7885.md?p=b-1), you have met the initial compliance requirements in [§ 63.7891](/cfr/40/63.7891.md).
  - (2) If the remediation material treated or managed by the process vented through the affected process vents has an average total VOHAP less than 10 ppmw according to [§ 63.7885(b)(2)](/cfr/40/63.7885.md?p=b-2), you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have determined, according to the procedures [§ 63.7943](/cfr/40/63.7943.md), and recorded the average VOHAP concentration of the remediation material placed in the affected remediation material management unit.
  - (3) If HAP emissions are controlled from the affected process vents to meet standards in another subpart under 40 CFR part [61](/cfr/40/part61.md) or [40](/cfr/40/part40.md) CFR [part 63](/cfr/40/part63.md) according to [§ 63.7885(b)(3)](/cfr/40/63.7885.md?p=b-3), you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(b)(3)(i)](#b-3-i) and [(ii)](#b-3-ii) of this section.
    - (i) You include in your statement the citations for the specific emission limitations and work practice standards that apply to the process vents under the subpart in 40 CFR part [61](/cfr/40/part61.md) or [40](/cfr/40/part40.md) CFR [part 63](/cfr/40/part63.md) that the vents are also subject.
    - (ii) You are complying with all applicable emissions limitations and work practice standards specified by the applicable subpart.
  - (4) For each process vent exempted according to [§ 63.7885(c)](/cfr/40/63.7885.md?p=c), you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(b)(4)(i)](#b-4-i) and [(ii)](#b-4-ii) of this section.
    - (i) You identify in your statement each process vent that qualifies for an exemption and the exemption conditions in § [63.7885(c)(1)(i)](/cfr/40/63.7885.md?p=c-1-i) or [(ii)](/cfr/40/63.7885.md?p=c-1-ii) that apply to each exempted process vent.
    - (ii) You have performed the measurements and prepared the documentation required in [§ 63.7885(c)(2)](/cfr/40/63.7885.md?p=c-2) that demonstrates that each exempted process vent stream meets the applicable exemption conditions in [§ 63.7885(c)(1)](/cfr/40/63.7885.md?p=c-1).
- (c) You must demonstrate initial compliance with the general standards in [§ 63.7886](/cfr/40/63.7886.md) that apply to your affected remediation material management units by meeting the requirements in [paragraphs (c)(1) through (6)](#c-1..c-6) of this section, as applicable to your remediation material management units.
  - (1) If the remediation material management unit uses air pollution controls according to the standards specified in [§ 63.7886(b)(1)](/cfr/40/63.7886.md?p=b-1), you have met the initial compliance requirements applicable to the remediation material management unit in §§ [63.7896](/cfr/40/63.7896.md), [63.7901](/cfr/40/63.7901.md), [63.7906](/cfr/40/63.7906.md), [63.7911](/cfr/40/63.7911.md), or [63.7816](/cfr/40/63.7816.md).
  - (2) If the remediation material managed in the affected remediation material management unit has an average total VOHAP concentration less than 500 ppmw according to [§ 63.7886(b)(2)](/cfr/40/63.7886.md?p=b-2), you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have determined, according to the procedures in [§ 63.7943](/cfr/40/63.7943.md), and recorded the average VOHAP concentration of the remediation material placed in the affected remediation material management unit.
  - (3) If HAP emissions are controlled from the affected remediation material management units to meet standards in another subpart under 40 CFR part [61](/cfr/40/part61.md) or [40](/cfr/40/part40.md) CFR [part 63](/cfr/40/part63.md) according to [§ 63.7886(b)(3)](/cfr/40/63.7886.md?p=b-3), you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(c)(3)(i)](#c-3-i) and [(ii)](#c-3-ii) of this section.
    - (i) You include in your statement the citations for the specific emission limitations and work practice standards that apply to the remediation material management units under the subpart in 40 CFR part [61](/cfr/40/part61.md) or [40](/cfr/40/part40.md) CFR [part 63](/cfr/40/part63.md) that the units are also subject.
    - (ii) You are complying with all applicable emissions limitations and work practice standards specified by the applicable subpart.
  - (4) If HAP emissions are controlled from the affected remediation material management unit that is an open tank or surface impoundment used for a biological treatment process according to [§ 63.7886(b)(4)](/cfr/40/63.7886.md?p=b-4), you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(c)(4)(i)](#c-4-i) and [(ii)](#c-4-ii) of this section.
    - (i) You have performed the measurements and prepared the documentation required in [§ 63.7886(b)(4)(i)](/cfr/40/63.7886.md?p=b-4-i) that demonstrates that each unit meets the applicable performance levels.
    - (ii) You will monitor the biological treatment process conducted in each unit according to the requirements in [§ 63.684(e)(4)](/cfr/40/63.684.md?p=e-4).
  - (5) For each remediation material management unit used for cleanup of radioactive mixed waste and exempted according to [§ 63.7886(c)](/cfr/40/63.7886.md?p=c), you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(c)(5)(i)](#c-5-i) and [(ii)](#c-5-ii) of this section.
    - (i) You include in your statement the citations for the specific requirements that apply to the remediation material management units under regulations, directives, and other requirements under the Atomic Energy Act, the Nuclear Waste Policy Act, or the Waste Isolation Pilot Plant Land Withdrawal Act.
    - (ii) You are complying with all requirements that apply to the remediation material management units under the applicable regulations or directives.
  - (6) For each remediation material management unit exempted according to [§ 63.7886(d)](/cfr/40/63.7886.md?p=d), you have submitted as part of your notification of compliance status, specified in [§ 63.7950](/cfr/40/63.7950.md), a signed statement that you have met the requirements in paragraphs [(c)(6)(i)](#c-6-i) and [(ii)](#c-6-ii) of this section.
    - (i) You have designated according to the requirements in [§ 63.7886(d)(1)](/cfr/40/63.7886.md?p=d-1) each of the remediation material management units you are selecting to be exempted.
    - (ii) You have performed an initial determination and prepared the documentation required in [§ 63.7886(d)(2)](/cfr/40/63.7886.md?p=d-2) that demonstrates that the total annual HAP quantity (based on the HAP listed in Table 1 of this subpart) in the remediation material placed in all of the designated exempted remediation material management units will be less than 1 Mg/yr.
- (d) You must demonstrate initial compliance with the general standards in [§ 63.7887](/cfr/40/63.7887.md) that apply to your affected equipment leak sources by meeting the requirements in [§ 63.7921](/cfr/40/63.7921.md).

# §63.7938. How do I demonstrate continuous compliance with the general standards?

- (a) You must demonstrate continuous compliance with the general standards in [§§ 63.7884 through 63.7887](/cfr/40/63.7884..63.7887.md) that apply to your affected sources by meeting the requirements in [paragraphs (b) through (d)](#b..d) of this section, as applicable to you.
- (b) You have demonstrated continuous compliance with the general standards in [§ 63.7885](/cfr/40/63.7885.md) that apply to your affected process vents by meeting the requirements in [paragraphs (b)(1) through (4)](#b-1..b-4) of this section, as applicable to your process vents.
  - (1) If HAP emissions are controlled from the affected process vents according to the emission limitations and work practice standards specified in [§ 63.7885(b)(1)](/cfr/40/63.7885.md?p=b-1), you must demonstrate continuous compliance by meeting the requirements in [§ 63.7893](/cfr/40/63.7893.md).
  - (2) If the remediation material treated or managed by the process vented through the affected process vents has an average total VOHAP less than 10 ppmw according to [§ 63.7885(c)(1)](/cfr/40/63.7885.md?p=c-1), you must demonstrate continuous compliance by performing a new determination and preparing new documentation as required in [§ 63.7885(c)(2)](/cfr/40/63.7885.md?p=c-2) to show that the total VOHAP concentration of the remediation material remains less than 10 ppmw.
  - (3) If HAP emissions are controlled from the affected process vents to meet standards in another subpart under 40 CFR part [61](/cfr/40/part61.md) or [40](/cfr/40/part40.md) CFR [part 63](/cfr/40/part63.md) according to [§ 63.7885(b)(3)](/cfr/40/63.7885.md?p=b-3), you must demonstrate continuous compliance by complying with all applicable emissions limitations and work practice standards specified by the applicable subpart.
  - (4) For each process vent exempted according to [§ 63.7885(c)](/cfr/40/63.7885.md?p=c), you must demonstrate continuous compliance by performing new measurements and preparing new documentation as required in [§ 63.7885(c)(2)](/cfr/40/63.7885.md?p=c-2) that demonstrates that each exempted process vent stream meets the applicable exemption conditions in [§ 63.7885(c)(1)](/cfr/40/63.7885.md?p=c-1).
- (c) You must demonstrate continuous compliance with the general standards in [§ 63.7886](/cfr/40/63.7886.md) that apply to your affected remediation material management units by meeting the requirements in [paragraphs (c)(1) through (6)](#c-1..c-6) of this section, as applicable to your remediation material management units.
  - (1) If the remediation material management unit uses air pollution controls according to the standards specified in [§ 63.7886(b)(1)](/cfr/40/63.7886.md?p=b-1), you must demonstrate continuous compliance by meeting the requirements applicable to the remediation material management unit in §§ [63.7898](/cfr/40/63.7898.md), [63.7903](/cfr/40/63.7903.md), [63.7908](/cfr/40/63.7908.md), [63.7913](/cfr/40/63.7913.md), or [63.7818](/cfr/40/63.7818.md).
  - (2) If the remediation material managed in the affected remediation material managements has an average total VOHAP concentration less than 500 ppmw according to [§ 63.7886(b)(2)](/cfr/40/63.7886.md?p=b-2), you must demonstrate continuous compliance by performing a new determination and preparing new documentation as required in [§ 63.7886(c)(2)](/cfr/40/63.7886.md?p=c-2) to show that the total VOHAP concentration of the remediation material remains less than 500 ppmw.
  - (3) If HAP emissions are controlled from the affected remediation material management units to meet standards in another subpart under 40 CFR part [61](/cfr/40/part61.md) or [40](/cfr/40/part40.md) CFR [part 63](/cfr/40/part63.md) according to [§ 63.7886(b)(3)](/cfr/40/63.7886.md?p=b-3), you must demonstrate continuous compliance by meeting all applicable emissions limitations and work practice standards specified by the applicable subpart.
  - (4) If HAP emissions are controlled from the affected remediation material management unit that is an open tank or surface impoundment used for a biological treatment process according to [§ 63.7886(b)(4)](/cfr/40/63.7886.md?p=b-4), you must demonstrate continuous compliance by meeting the requirements in paragraphs [(c)(4)(i)](#c-4-i) and [(ii)](#c-4-ii) of this section.
    - (i) Performing new measurements and preparing new documentation as required in [§ 63.7886(4)(i)](/cfr/40/63.7886.md?p=4-i) that demonstrates that each unit meets the applicable performance levels.
    - (ii) Monitoring the biological treatment process conducted in each unit according to the requirements in [§ 63.7886(4)(i)](/cfr/40/63.7886.md?p=4-i).
  - (5) For each remediation material management unit used for cleanup of radioactive mixed waste and exempted according to [§ 63.7886(c)](/cfr/40/63.7886.md?p=c), you must demonstrate continuous compliance by meeting all requirements that apply to the remediation material management units under the applicable regulations or directives.
  - (6) For each remediation material management unit exempted according to [§ 63.7886(d)](/cfr/40/63.7886.md?p=d), you must demonstrate continuous compliance by performing new measurements and preparing new documentation as required in [§ 63.7886(d)(2)](/cfr/40/63.7886.md?p=d-2) to show that the total annual HAP quantity (based on the HAP listed in Table 1 of this subpart) in the remediation material placed in all of the designated exempted remediation material management units remains less than 1 Mg/yr.
- (d) You have demonstrated continuous compliance with the general standards in [§ 63.7887](/cfr/40/63.7887.md) that apply to your affected equipment leak sources by meeting the requirements in [§ 63.7923](/cfr/40/63.7923.md).

# §63.7940. By what date must I conduct performance tests or other initial compliance demonstrations?

- (a) You must conduct a performance test or design evaluation for each existing affected source within 180 calendar days after the compliance date that is specified in [§ 63.7883](/cfr/40/63.7883.md).
- (b) For each work practice standard that applies to you where initial compliance is not demonstrated using a performance test or design evaluation, you must demonstrate initial compliance within 30 calendar days after the compliance date that is specified in [§ 63.7883](/cfr/40/63.7883.md) for your affected source.
- (c) For new sources, you must conduct initial performance tests and other initial compliance demonstrations according to the provisions in [§ 63.7(a)(2)](/cfr/40/63.7.md?p=a-2).

# §63.7941. How do I conduct a performance test, design evaluation, or other type of initial compliance demonstration?

- (a) You must conduct a performance test or design evaluation to demonstrate initial compliance for each new or existing affected source that is subject to an emission limit in this subpart. You must report the results of the performance test or design evaluation according to the requirements in [§ 63.7950(e)(1)](/cfr/40/63.7950.md?p=e-1).
- (b) If you choose to conduct a performance test to demonstrate initial compliance, you must conduct the test according to the requirements in [§ 63.7(e)(1)](/cfr/40/63.7.md?p=e-1) and [paragraphs (b)](#b) (1) through (5) of this section.
  - (1) You must conduct three separate test runs for each performance test required in this section, as specified in [§ 63.7(e)(3)](/cfr/40/63.7.md?p=e-3). Each test run must last at least 1 hour.
  - (2) If your initial startup date was on or before September 3, 2019, then until January 6, 2021, you must conduct each performance test under representative conditions according to the requirements in [§ 63.7(e)(1)](/cfr/40/63.7.md?p=e-1). If your initial startup date is after September 3, 2019, then as of July 10, 2020, and for all sources after January 6, 2021, you must conduct each performance test under conditions representative of normal operations. You may not conduct performance tests during periods of startup, shutdown, or malfunction. The owner or operator must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, the owner or operator shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
  - (3) You must conduct each performance test using the test methods and procedures in [§ 63.694(l)](/cfr/40/63.694.md?p=l).
  - (4) Follow the procedures in [paragraphs (b)(4)(i) through (iii)](#b-4-i..b-4-iii) of this section to determine compliance with the facility-wide total organic mass emissions rate in [§ 63.7890(b)](/cfr/40/63.7890.md?p=b).
    - (i) Determine compliance with the total organic mass flow rate using Equation 1 of this section as follows:
    - (ii) Determine compliance with the annual total organic emissions rate using Equation 2 of this section as follows:
    - (iii) Determine compliance with the total organic emissions limit from all affected process vents at the facility by summing the total hourly organic mass emissions rates (Eh as determined in Equation 1 of this section) and summing the total annual organic mass emissions rates (EA, as determined in Equation 2 of this section) for all affected process vents at the facility.
  - (5) Determine compliance with the 95 percent reduction limit in [§ 63.7890(a)(2)(i)](/cfr/40/63.7890.md?p=a-2-i) for the combination of all affected process vents at the facility using Equations 3 and 4 of this section to calculate control device inlet and outlet concentrations and Equation 5 of this section to calculate control device emission reductions for process vents as follows:
- (c) If you use a carbon adsorption system, condenser, vapor incinerator, boiler, or process heater to meet an emission limit in this subpart, you may choose to perform a design evaluation to demonstrate initial compliance instead of a performance test. You must perform a design evaluation according to the general requirements in [§ 63.693(b)(8)](/cfr/40/63.693.md?p=b-8) and the specific requirements in [§ 63.693(d)(2)(ii)](/cfr/40/63.693.md?p=d-2-ii) for a carbon adsorption system (including establishing carbon replacement schedules and associated requirements), [§ 63.693(e)(2)(ii)](/cfr/40/63.693.md?p=e-2-ii) for a condenser, [§ 63.693(f)(2)(ii)](/cfr/40/63.693.md?p=f-2-ii) for a vapor incinerator, or [§ 63.693(g)(2)(i)(B)](/cfr/40/63.693.md?p=g-2-i-B) for a boiler or process heater.
- (d) During the performance test or design evaluation, you must collect the appropriate operating parameter monitoring system data, average the operating parameter data over each test run, and set operating limits, whether a minimum or maximum value, based on the average of values for each of the three test runs. If you use a control device design analysis to demonstrate control device performance, then the minimum or maximum operating parameter value must be established based on the control device design analysis and supplemented, as necessary, by the control device manufacturer recommendations or other applicable information.
- (e) If you control air emissions from an affected source by introducing the vent stream into the flame zone of a boiler or process heater according to the requirements in [§ 63.693(g)(1)(iii)](/cfr/40/63.693.md?p=g-1-iii), you must conduct a performance test or design evaluation to demonstrate that the boiler or process heater meets the applicable emission limit while operating at a residence time of 0.5 seconds or greater and at a combustion zone temperature of 760 °C or higher.
- (f) You must conduct a performance evaluation for each continuous monitoring system according to the requirements in [§ 63.8(e)](/cfr/40/63.8.md?p=e).
- (g) If you are required to conduct a visual inspection of an affected source, you must conduct the inspection according to the procedures in [§ 63.906(a)(1)](/cfr/40/63.906.md?p=a-1) for Tank Level 1 controls, [§ 63.1063(d)](/cfr/40/63.1063.md?p=d) for Tank Level 2 controls, [§ 63.926(a)](/cfr/40/63.926.md?p=a) for Container Level 1 controls, [§ 63.946(a)](/cfr/40/63.946.md?p=a) for a surface impoundment equipped with a floating membrane cover, [§ 63.946(b)](/cfr/40/63.946.md?p=b) for a surface impoundment equipped with a cover and vented to a control device, [§ 63.1047(a)](/cfr/40/63.1047.md?p=a) for a separator with a fixed roof, [§ 63.1047(c)](/cfr/40/63.1047.md?p=c) for a separator equipped with a fixed roof and vented to a control device, § [63.695(c)(1)(i)](/cfr/40/63.695.md?p=c-1-i) or [(c)(2)(i)](/cfr/40/63.695.md?p=c-2-i) for a closed vent system, and [§ 63.964(a)](/cfr/40/63.964.md?p=a) for individual drain systems.
- (h) [Reserved]
- (i) If you use Container Level 2 controls, you must conduct a test to demonstrate that the container operates with no detectable organic emissions or that the container is vapor-tight. You must conduct the test using Method 21 ([40 CFR part 60](/cfr/40/part60.md), appendix A) and the procedures in [§ 63.925(a)](/cfr/40/63.925.md?p=a) to demonstrate that the container operates with no detectable organic emissions or Method 27 ([40 CFR part 60](/cfr/40/part60.md), appendix A) and the procedures in [§ 63.925(b)](/cfr/40/63.925.md?p=b) to demonstrate that the container is vapor-tight.
- (j) If you locate an affected source inside a permanent total enclosure that is vented to a control device, you must demonstrate that the enclosure meets the verification criteria in [section 5](/cfr/40/5.md) of Procedure T in [40 CFR 52.741](/cfr/40/52.741.md), appendix B.
- (k) If you use a fixed roof or a floating roof to control air emissions from a separator, you must conduct a test to demonstrate that the roof operates with no detectable organic emissions using Method 21 ([40 CFR part 60](/cfr/40/part60.md), appendix A) and the procedures in [§ 63.1046(a)](/cfr/40/63.1046.md?p=a). If you use a floating roof, you also must measure the seal gaps according to the procedures in [§ 63.1046(b)](/cfr/40/63.1046.md?p=b).
- (l) If you use a flare to control air emissions, you must conduct a visible emissions test using Method 22 in [40 CFR part 60](/cfr/40/part60.md), appendix A, and the procedures in [§ 63.11(b)(4)](/cfr/40/63.11.md?p=b-4).
- (m) For each initial compliance demonstration that requires a performance test or design evaluation, you must report the results in your notification of compliance status according to the requirements in [§ 63.7950(e)(1)](/cfr/40/63.7950.md?p=e-1). For each initial compliance demonstration that does not require a performance test or design evaluation, you must submit a notification of compliance status according to the requirements in [§ 63.7950(e)(2)](/cfr/40/63.7950.md?p=e-2).

# §63.7942. When must I conduct subsequent performance tests?


For non-flare control devices, you must conduct performance tests at any time the EPA requires you to according to [§ 63.7(a)(3)](/cfr/40/63.7.md?p=a-3).


# §63.7943. How do I determine the average VOHAP concentration of my remediation material?

- (a) **General requirements.** You must determine the average total VOHAP concentration of a remediation material using either direct measurement as specified in [paragraph (b)](#b) of this section or by knowledge as specified in [paragraph (c)](#c) of this section. These methods may be used to determine the average VOHAP concentration of any material listed in (a)(1) through (3) of this section.
  - (1) A single remediation material stream; or
  - (2) Two or more remediation material streams that are combined prior to, or within, a remediation material management unit or treatment process; or
  - (3) Remediation material that is combined with one or more non-remediation material streams prior to, or within, a remediation material management unit or treatment process.
- (b) **Direct measurement.** To determine the average total VOHAP concentration of a remediation material using direct measurement, you must use the procedures in [paragraphs (b)(1) through (3)](#b-1..b-3) of this section.
  - (1) **Sampling.** Samples of each material stream must be collected from the container, pipeline, or other device used to deliver each material stream prior to entering the remediation material management unit or treatment process in a manner such that volatilization of organics contained in the sample is minimized and an adequately representative sample is collected and maintained for analysis by the selected method.
    - (i) The averaging period to be used for determining the average total VOHAP concentration for the material stream on a mass-weighted average basis must be designated and recorded. The averaging period can represent any time interval that you determine is appropriate for the material stream but must not exceed 1 year. For streams that are combined, an averaging period representative for all streams must be selected.
    - (ii) No less than four samples must be collected to represent the complete range of HAP compositions and HAP quantities that occur in each material stream during the entire averaging period due to normal variations in the material stream(s). Examples of such normal variations are variation of the HAP concentration within a contamination area.
    - (iii) All samples must be collected and handled according to written procedures you prepare and document in a site sampling plan. This plan must describe the procedure by which representative samples of the material stream(s) are collected such that a minimum loss of organics occurs throughout the sample collection and handling process and by which sample integrity is maintained. A copy of the written sampling plan must be maintained on site in the facility operating records. An example of an acceptable sampling plan includes a plan incorporating sample collection and handling procedures according to the guidance found in “Test Methods for Evaluating Solid Waste, Physical/Chemical Methods,” EPA Publication No. SW-846 or Method 25D in [40 CFR part 60](/cfr/40/part60.md), appendix A.
  - (2) **Analysis.** Each collected sample must be prepared and analyzed according to either one of the methods listed in [§ 63.694(b)(2)(ii)](/cfr/40/63.694.md?p=b-2-ii), or any current EPA Contracts Lab Program method (or future revisions) capable of identifying all the HAP in Table 1 of this subpart.
  - (3) **Calculations.** The average total VOHAP concentration (C ) on a mass-weighted basis must be calculated by using the results for all samples analyzed according to [paragraph (b)(2)](#b-2) of this section and Equation 1 of this section as follows:
- (c) **Knowledge of the material.** To determine the average total VOHAP concentration of a remediation material using knowledge, you must use the procedures in [paragraphs (c)(1) through (3)](#c-1..c-3) of this section.
  - (1) Documentation must be prepared that presents the information used as the basis for your knowledge of the material stream's average VOHAP concentration. Examples of information that may be used as the basis for knowledge include: material balances for the source(s) generating each material stream; species-specific chemical test data for the material stream from previous testing that are still applicable to the current material stream; test data for material from the contamination area(s) being remediated.
  - (2) If test data are used as the basis for knowledge, then you must document the test method, sampling protocol, and the means by which sampling variability and analytical variability are accounted for in the determination of the average VOHAP concentration. For example, you may use HAP concentration test data for the material stream that are validated according to Method 301 in [40 CFR part 63](/cfr/40/part63.md), appendix A as the basis for knowledge of the material. This information must be provided for each material stream where streams are combined.
  - (3) If you use species-specific chemical concentration test data as the basis for knowledge of the material, you may adjust the test data to the corresponding average VOHAP concentration value which would be obtained had the material samples been analyzed using Method 305. To adjust these data, the measured concentration for each individual HAP chemical species contained in the material is multiplied by the appropriate species-specific adjustment factor (fm305) listed in Table 1 of this subpart.
- (d) In the event that you and we disagree on a determination using knowledge of the average total VOHAP concentration for a remediation material, then the results from a determination of VOHAP concentration using direct measurement by EPA Method 305 in [40 CFR part 60](/cfr/40/part60.md), appendix A, as specified in [paragraph (b)](#b) of this section, will be used to determine compliance with the applicable requirements of this subpart. We may perform or require that you perform this determination using direct measurement.

# §63.7944. How do I determine the maximum HAP vapor pressure of my remediation material?

- (a) You must determine the maximum HAP vapor pressure of your remediation material using either direct measurement as specified in [paragraph (b)](#b) of this section or by knowledge as specified in [paragraph (c)](#c) of this section.
- (b) **Direct measurement to determine the maximum HAP vapor pressure.**
  - (1) **Sampling.** A sufficient number of samples must be collected to be representative of the remediation material contained in the tank. All samples must be collected and handled according to written procedures prepared by you and documented in a site sampling plan. This plan must describe the procedure by which representative samples of the remediation material are collected such that a minimum loss of organics occurs throughout the sample collection and handling process and by which sample integrity is maintained. A copy of the written sampling plan must be maintained on site in the facility site operating records. An example of an acceptable sampling plan includes a plan incorporating sample collection and handling procedures according to the guidance found in “Test Methods for Evaluating Solid Waste, Physical/Chemical Methods,” EPA Publication No. SW-846 or Method 25D in [40 CFR part 60](/cfr/40/part60.md), appendix A.
  - (2) **Analysis.** Any one of the following methods may be used to analyze the samples and compute the maximum HAP vapor pressure of the remediation material:
    - (i) Method 25E in [40 CFR part 60](/cfr/40/part60.md) appendix A;
    - (ii) Methods described in American Petroleum Institute Bulletin 2517, “Evaporation Loss from External Floating Roof Tanks,” (incorporated by reference, see [§ 63.14](/cfr/40/63.14.md));
    - (iii) Methods obtained from standard reference texts;
    - (iv) ASTM D2879-83 (incorporated by reference, see [§ 63.14](/cfr/40/63.14.md)); or
    - (v) **Any other method approved by the Administrator.**
- (c) **Use of knowledge to determine the maximum HAP vapor pressure.** Documentation must be prepared and recorded that presents the information used as the basis for your knowledge that the maximum HAP vapor pressure of the remediation material is less than the maximum vapor pressure limit listed in Table 2 of this subpart for the applicable tank design capacity category.
- (d) In the event that you and us disagree on a determination using knowledge of the maximum HAP vapor pressure of the remediation material, then the results from a determination of maximum HAP vapor pressure using direct measurement by EPA Method 25E in [40 CFR part 60](/cfr/40/part60.md), appendix A, as specified in [paragraph (b)](#b) of this section, will be used to determine compliance with the applicable requirements of this subpart. We may perform or require that you perform this determination using direct measurement.

# §63.7945. What are my monitoring installation, operation, and maintenance requirements?

- (a) Each CPMS must meet the requirements in [paragraphs (a)(1) through (4)](#a-1..a-4) of this section.
  - (1) **Complete a minimum of one cycle of operation for each successive 15-minute period.**
  - (2) To calculate a valid hourly value, you must have at least three of four equally spaced data values (or at least two, if that condition is included to allow for periodic calibration checks) for that hour from a CPMS that is not out of control according to the monitoring plan referenced in [§ 63.7935](/cfr/40/63.7935.md).
  - (3) To calculate the average emissions for each averaging period, you must have at least 75 percent of the hourly averages for that period using only block hourly average values that are based on valid data (i.e., not from out-of-control periods).
  - (4) Unless otherwise specified, each CPMS must determine the hourly average of all recorded readings and daily average, if required.
- (b) You must record the results of each inspection, calibration, and validation check.
- (c) You must conduct a performance evaluation for each CPMS according to the requirements in [§ 63.8(e)](/cfr/40/63.8.md?p=e) and your site-specific monitoring plan.
- (d) Failure to meet the requirements of [paragraphs (a)(1) through (4)](#a-1..a-4) of this section is a deviation and must be reported according to the requirements in [§ 63.7951(b)(7)](/cfr/40/63.7951.md?p=b-7).

# §63.7946. How do I monitor and collect data to demonstrate continuous compliance?

- (a) You must monitor and collect data according to this section and your site-specific monitoring plan required in [§ 63.7935](/cfr/40/63.7935.md).
- (b) Except for monitor malfunctions, associated repairs, and required quality assurance or control activities (including, as applicable, calibration checks and required zero and span adjustments), you must monitor continuously (or collect data at all required intervals) at all times that the affected source is operating.
- (c) You may not use data recorded during monitoring malfunctions, associated repairs, out of control periods and required quality assurance or control activities in data averages and calculations used to report emissions or operating levels, nor may such data be used in fulfilling a minimum data availability requirement, if applicable. You must use all the data collected during all other periods in assessing the operation of the control device and associated control system.

# §63.7947. What are my monitoring alternatives?

- (a) As an alternative to the parametric monitoring required in this subpart, you may install, calibrate, and operate a continuous emission monitoring system (CEMS) to measure the control device outlet total organic emissions or organic HAP emissions concentration.
  - (1) The CEMS used on combustion control devices must include a diluent gas monitoring system (for O2 or CO2) with the pollutant monitoring system in order to correct for dilution (e.g., to 0 percent excess air).
  - (2) Each CEMS must complete a minimum of one cycle of operation (sampling, analyzing, and data recording) for each successive 15-minute period. Data must be reduced as specified in [§ 63.8(g)(2)](/cfr/40/63.8.md?p=g-2).
  - (3) You must conduct a performance evaluation of the CEMS according to the requirements in [§ 63.8](/cfr/40/63.8.md) and Performance Specification 8 (for a total organic emissions CEMS) or Performance Specification 9 (for a HAP emissions CEMS) and Performance Specification 3 (for an O2 or CO2 CEMS) of [40 CFR part 60](/cfr/40/part60.md), appendix B. The relative accuracy provision of Performance Specification 8, sections [2.4](/cfr/40/2.4.md) and [3](/cfr/40/3.md) need not be conducted.
  - (4) You must prepare a site-specific monitoring plan for operating, calibrating, and verifying the operation of your CEMS according to the requirements in §§ [63.8(c)](/cfr/40/63.8.md?p=c), [(d)](/cfr/40/63.8.md?p=d), and [(e)](/cfr/40/63.8.md?p=e).
  - (5) You must establish the emissions concentration operating limit according to paragraphs [(a)(5)(i)](#a-5-i) and [(ii)](#a-5-ii) of this section.
    - (i) During the performance test, you must monitor and record the total organic or HAP emissions concentration at least once every 15 minutes during each of the three test runs.
    - (ii) Use the data collected during the performance test to calculate and record the average total organic or HAP emissions concentration maintained during the performance test. The average total organic or HAP emissions concentration, corrected for dilution as appropriate, is the maximum operating limit for your control device.
- (b) You must maintain the daily (24-hour) average total organic or HAP emissions concentration in the exhaust vent stream of the control device outlet less than or equal to the site-specific operating limit established during the performance test.

# §63.7950. What notifications must I submit and when?

- (a) You must submit all of the notifications in §§ [63.7(b)](/cfr/40/63.7.md?p=b) and [(c)](/cfr/40/63.7.md?p=c), [63.8(e)](/cfr/40/63.8.md?p=e), [63.8(f)(4)](/cfr/40/63.8.md?p=f-4) and [(6)](/cfr/40/63.8.md?p=f-6), and [63.9(b) through (h)](/cfr/40/63.9.md?p=b..h) that apply to you.
- (b) As specified in [§ 63.9(b)(2)](/cfr/40/63.9.md?p=b-2), if you start up your affected source before October 8, 2003, you must submit an Initial Notification not later than 120 calendar days after October 8, 2003, or no later than 120 calendar days after the source becomes subject to this subpart, whichever is later.
- (c) As specified in [§ 63.9(b)(3)](/cfr/40/63.9.md?p=b-3), if you start up your new or reconstructed affected source on or after the effective date, you must submit an Initial Notification no later than 120 calendar days after initial startup, or no later than 120 calendar days after the source becomes subject to this subpart, whichever is later.
- (d) If you are required to conduct a performance test, you must submit a notification of intent to conduct a performance test at least 60 calendar days before the performance test is scheduled to begin as required in [§ 63.7(b)(1)](/cfr/40/63.7.md?p=b-1).
- (e) If you are required to conduct a performance test, design evaluation, or other initial compliance demonstration, you must submit a Notification of Compliance Status according to [§ 63.9(h)(2)(ii)](/cfr/40/63.9.md?p=h-2-ii).
  - (1) For each initial compliance demonstration that includes a performance test or design evaluation, you must submit the Notification of Compliance Status, including the performance test results, before the close of business on the 60th calendar day following the completion of the performance test according to [§ 63.10(d)(2)](/cfr/40/63.10.md?p=d-2). You must submit the complete design evaluation and supporting documentation.
  - (2) For each initial compliance demonstration that does not include a performance test, you must submit the Notification of Compliance Status before the close of business on the 30th calendar day following the completion of the initial compliance demonstration.
- (f) You must provide written notification to the Administrator of the alternative standard selected under § [63.1006(b)(5)](/cfr/40/63.1006.md?p=b-5) or [(6)](/cfr/40/63.1006.md?p=b-6) before implementing either of the provisions.

# §63.7951. What reports must I submit and when?

- (a) **Compliance report due dates.** Unless the Administrator has approved a different schedule, you must submit a semiannual compliance report to your permitting authority according to the requirements specified in [paragraphs (a)(1) through (5)](#a-1..a-5) of this section.
  - (1) The first compliance report must cover the period beginning on the compliance date that is specified for your affected source in [§ 63.7883](/cfr/40/63.7883.md) and ending on June 30 or December 31, whichever date comes first after the compliance date that is specified for your affected source.
  - (2) The first compliance report must be postmarked or delivered no later than July 31 or January 31, whichever date comes first after your first compliance report is due.
  - (3) Each subsequent compliance report must cover the semiannual reporting period from January 1 through June 30 or the semiannual reporting period from July 1 through December 31.
  - (4) Each subsequent compliance report must be postmarked or delivered no later than July 31 or January 31, whichever date comes first after the end of the semiannual reporting period.
  - (5) For each affected source that is subject to permitting regulations pursuant to 40 CFR part [70](/cfr/40/part70.md) or [40](/cfr/40/part40.md) CFR [part 71](/cfr/40/part71.md), and if the permitting authority has established dates for submitting semiannual reports pursuant to 40 CFR [70.6(a)(3)(iii)(A)](/cfr/40/70.6.md?p=a-3-iii-A) or [40](/cfr/40/40.md) CFR 71.6(a)(3)(iii)(A), you may submit the first and subsequent compliance reports according to the dates the permitting authority has established instead of the dates specified in [paragraphs (a)(1) through (4)](#a-1..a-4) of this section.
  - (6) For pressure relief devices in remediation material service subject to the requirements of [§ 63.7923](/cfr/40/63.7923.md), submit a description of the device or monitoring system to be implemented, including the pressure relief devices and process parameters to be monitored, and a description of the alarms or other methods by which operators will be notified of a pressure release. If your initial startup date was on or before September 3, 2019, then this information must be submitted with the next semi-annual periodic compliance report. If your initial startup date is after September 3, 2019, this information must be submitted in the first periodic compliance report. The information must be updated in subsequent reports if changes are made.
  - (7) Semi-annual compliance reports must be submitted according to [paragraph (f)](#f) of this section.
- (b) **Compliance report contents.** Each compliance report must include the information specified in [paragraphs (b)(1) through (3)](#b-1..b-3) of this section and, as applicable, [paragraphs (b)(4) through (9)](#b-4..b-9) of this section.
  - (1) **Company name and address.**
  - (2) Statement by a responsible official, with that official's name, title, and signature, certifying the truth, accuracy, and completeness of the content of the report.
  - (3) **Date of report and beginning and ending dates of the reporting period.**
  - (4) If your initial startup date was on or before September 3, 2019, then until January 6, 2021, if you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your SSMP, the compliance report must include the information in [§ 63.10(d)(5)(i)](/cfr/40/63.10.md?p=d-5-i). If your initial startup date is after September 3, 2019, then as of July 10, 2020, and for all sources after January 6, 2021, an SSMP and the information in [§ 63.10(d)(5)(i)](/cfr/40/63.10.md?p=d-5-i) is not required.
  - (5) If there were no deviations from any emissions limitations (including operating limit), work practice standards, or operation and maintenance requirements, a statement that there were no deviations from the emissions limitations, work practice standards, or operation and maintenance requirements during the reporting period.
  - (6) If there were no periods during which a continuous monitoring system (including a CPMS or CEMS) was out-of-control as specified by [§ 63.8(c)(7)](/cfr/40/63.8.md?p=c-7), a statement that there were no periods during which the CPMS was out-of-control during the reporting period.
  - (7) For each deviation from an emissions limitation (including an operating limit) that occurs at an affected source for which you are not using a continuous monitoring system (including a CPMS or CEMS) to comply with an emissions limitation or work practice standard required in this subpart, the compliance report must contain the information specified in paragraphs [(b)(1) through (3)](#b-1..b-3) and [(b)(7)(i)](#b-7-i) and [(ii)](#b-7-ii) of this section.
    - (i) **The total operating time of each affected source during the reporting period.**
    - (ii) **Information on the number of deviations.** For each deviation, include the date, time, and duration, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, the actions taken to minimize emissions, the cause of the deviation (including unknown cause), as applicable, and the corrective actions taken to return the affected unit to its normal or usual manner of operation.
  - (8) For each deviation from an emissions limitation (including an operating limit) or work practice standard occurring at an affected source where you are using a continuous monitoring system (including a CPMS or CEMS) to comply with the emissions limitations or work practice standard in this subpart, you must include the information specified in paragraphs [(b)(1) through (3)](#b-1..b-3) and [(b)(8)(i) through (xi)](#b-8-i..b-8-xi) of this section.
    - (i) **Information on the number of deviations.** For each deviation, include the date, time, and duration, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, the actions taken to minimize emissions, the cause of the deviation (including unknown cause), as applicable, and the corrective actions taken to return the affected unit to its normal or usual manner of operation.
    - (ii) The date and time that each continuous monitoring system was inoperative, except for zero (low-level) and high-level checks.
    - (iii) The date, time, and duration that each continuous monitoring system was out-of-control, including the information in [§ 63.8(c)(8)](/cfr/40/63.8.md?p=c-8).
    - (iv) For each deviation caused when the daily average value of a monitored operating parameter is less than the minimum operating parameter limit (or, if applicable, greater than the maximum operating parameter limit), the report must include the daily average values of the monitored parameter, the applicable operating parameter limit, and the date and duration of the period that the deviation occurred. For each deviation caused by lack of monitoring data, the report must include the date and duration of period when the monitoring data were not collected and the reason why the data were not collected.
    - (v) A summary of the total duration of the deviations during the reporting period and the total duration as a percent of the total source operating time during that reporting period.
    - (vi) A breakdown of the total duration of the deviations during the reporting period into those that are due to control equipment problems, process problems, other known causes, and unknown causes.
    - (vii) A summary of the total duration of continuous monitoring system downtime during the reporting period and the total duration of continuous monitoring system downtime as a percent of the total source operating time during the reporting period.
    - (viii) **A brief description of the process units.**
    - (ix) **A brief description of the continuous monitoring system.**
    - (x) **The date of the latest continuous monitoring system certification or audit.**
    - (xi) A description of any changes in continuous monitoring systems, processes, or controls since the last reporting period.
  - (9) You must include the information on equipment leaks required in periodic reports by [§ 63.1018(a)](/cfr/40/63.1018.md?p=a) or [§ 63.1039(b)](/cfr/40/63.1039.md?p=b).
  - (10) For pressure relief devices in remediation material service, compliance reports must include the information specified in [paragraphs (b)(10)(i) through (iii)](#b-10-i..b-10-iii) of this section.
    - (i) For pressure relief devices in remediation material service subject to [§ 63.7920(e)](/cfr/40/63.7920.md?p=e), report the number of occurrences of an instrument reading of 500 ppm above the background level or greater, if detected more than 5 days after a pressure release.
    - (ii) For pressure relief devices in remediation service subject to [§ 63.7923(c)](/cfr/40/63.7923.md?p=c), report confirmation, yes or no, that the monitoring required to show compliance was conducted during the reporting period.
    - (iii) For pressure relief devices in remediation material service subject to [§ 63.7923(d)](/cfr/40/63.7923.md?p=d), report each pressure release to the atmosphere, including the following information:
      - (A) **The date, time, and duration of the pressure release actuation event.**
      - (B) An estimate of the mass quantity of total HAP listed in Table 1 of this subpart emitted during the pressure release actuation event and the method used for determining this quantity.
      - (C) **The source, nature and cause of the pressure release actuation event.**
      - (D) **The actions taken to prevent this pressure release actuation event.**
      - (E) The measures implemented during the reporting period to prevent future such pressure release actuation events, and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.
  - (11) **Pressure tank closure device or bypass deviation information.** Compliance reports must include the information specified in [paragraph (b)(11)(iv)](#b-11-iv) of this section when any of the conditions in [paragraphs (b)(11)(i) through (iii)](#b-11-i..b-11-iii) of this section are met.
    - (i) Any pressure tank closure device, as specified in specified in [§ 63.7895(d)(4)](/cfr/40/63.7895.md?p=d-4), has released to the atmosphere.
    - (ii) Any closed vent system that includes bypass devices that could divert a vent a stream away from the control device and into the atmosphere, as specified in [§ 63.7927(a)(2)](/cfr/40/63.7927.md?p=a-2), has released directly to the atmosphere.
    - (iii) Any open-ended valve or line in an emergency shutdown system which is designed to open automatically in the event of a process upset, as specified in [§ 63.1014(c)](/cfr/40/63.1014.md?p=c) or [§ 63.1033(c)](/cfr/40/63.1033.md?p=c), has released directly to the atmosphere.
    - (iv) The compliance report must include the information specified in [paragraphs (b)(11)(iv)(A) through (E)](#b-11-iv-A..b-11-iv-E) of this section.
      - (A) **The source, nature and cause of the release.**
      - (B) **The date, time and duration of the discharge.**
      - (C) An estimate of the quantity of total HAP listed in Table 1 of this subpart emitted during the release and the method used for determining this quantity.
      - (D) **The actions taken to prevent this release.**
      - (E) **The measures adopted to prevent future such releases.**
- (c) **Immediate startup, shutdown, and malfunction report.** If your initial startup was on or before September 3, 2019, then until January 6, 2021, if you had a startup, shutdown, or malfunction during the semiannual reporting period that was not consistent with your SSMP, you must submit an immediate startup, shutdown and malfunction report according to the requirements of [§ 63.10(d)(5)(ii)](/cfr/40/63.10.md?p=d-5-ii). If your initial startup date is after September 3, 2019, then as of July 10, 2020, and for all sources after January 6, 2021, an immediate startup, shutdown, and malfunction report is not required.
- (d) **Part 70 monitoring report.** If you have obtained a title V operating permit for an affected source pursuant to 40 CFR part [70](/cfr/40/part70.md) or [40](/cfr/40/part40.md) CFR [part 71](/cfr/40/part71.md), you must report all deviations as defined in this subpart in the semiannual monitoring report required by 40 CFR [70.6(a)(3)(iii)(A)](/cfr/40/70.6.md?p=a-3-iii-A) or [40](/cfr/40/40.md) CFR 71.6(a)(3)(iii)(A). If you submit a compliance report for an affected source along with, or as part of, the semiannual monitoring report required by 40 CFR [70.6(a)(3)(iii)(A)](/cfr/40/70.6.md?p=a-3-iii-A) or [40](/cfr/40/40.md) CFR 71.6(a)(3)(iii)(A), and the compliance report includes all the required information concerning deviations from any emissions limitation or operation and maintenance requirement in this subpart, submission of the compliance report satisfies any obligation to report the same deviations in the semiannual monitoring report. However, submission of a compliance report does not otherwise affect any obligation you may have to report deviations from permit requirements for an affected source to your permitting authority.
- (e) **Performance Test and CMS Performance Evaluation Reports.** Within 60 days after the date of completing each performance test or continuous monitoring system (CMS) performance evaluation (as defined in [§ 63.2](/cfr/40/63.2.md)) required by this subpart, the owner or operator must submit the results of the performance test or performance evaluation according to the manner specified by either paragraph [(e)(1)](#e-1) or [(2)](#e-2) of this section.
  - (1) **Data collected using test methods supported by the EPA's Electronic Reporting Tool (ERT) as listed on the EPA's ERT website (https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert) at the time of the test.** Submit the results of the performance test or the performance evaluation of CMS measuring relative accuracy test audit (RATA) pollutants to the EPA via the Compliance and Emissions Data Reporting Interface (CEDRI), which can be accessed through the EPA's Central Data Exchange (CDX) (https://cdx.epa.gov/). The data must be submitted in a file format generated through the use of the EPA's ERT. Alternatively, you may submit an electronic file consistent with the extensible markup language (XML) schema listed on the EPA's ERT website.
  - (2) **Data collected using test methods that are not supported by the EPA's ERT as listed on the EPA's ERT website at the time of the test.** The results of the performance test or the performance evaluation of CMS measuring RATA pollutants by methods that are not supported by the ERT must be included as an attachment in the ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. The results of the performance test or the performance evaluation of CMS measuring RATA pollutants by methods that are not supported by the ERT, must be included as an attachment in the ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the ERT generated package or alternative file to the EPA via CEDRI.
- (f) **Submitting reports electronically.** If you are required to submit reports following the procedure specified in this paragraph, you must submit reports to the EPA via CEDRI, which can be accessed through the EPA's CDX (https://cdx.epa.gov/). You must use the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/compliance-and-emissions-data-reporting-interface-cedri) for this subpart. The report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted. If you claim some of the information required to be submitted via CEDRI is confidential business information (CBI), submit a complete report, including information claimed to be CBI, to the EPA. The report must be generated using the appropriate form on the CEDRI website. Submit the file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office, Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described earlier in this paragraph.
- (g) **Claims of EPA system outage.** If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with the reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in [paragraphs (g)(1) through (7)](#g-1..g-7) of this section.
  - (1) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
  - (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
  - (3) The outage may be planned or unplanned.
  - (4) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
  - (5) You must provide to the Administrator a written description identifying:
    - (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    - (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    - (iii) Measures taken or to be taken to minimize the delay in reporting; and
    - (iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.
  - (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
  - (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.
- (h) **Claims of force majeure.** If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with the reporting requirement. To assert a claim of force majuere, you must meet the requirements outlined in [paragraphs (h)(1) through (5)](#h-1..h-5) of this section.
  - (1) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
  - (2) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
  - (3) You must provide to the Administrator:
    - (i) A written description of the force majeure event;
    - (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    - (iii) Measures taken or to be taken to minimize the delay in reporting; and
    - (iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.
  - (4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
  - (5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

# §63.7952. What records must I keep?

- (a) You must keep the records specified in [paragraphs (a)(1) through (4)](#a-1..a-4) of this section.
  - (1) A copy of each notification and report that you submitted to comply with this subpart, including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted, according to the requirements in § [63.10(b)(1)](/cfr/40/63.10.md?p=b-1) and [(b)(2)(xiv)](/cfr/40/63.10.md?p=b-2-xiv).
  - (2) If your initial startup date is on or before September 3, 2019, you must continue to keep any records specified in [§ 63.6(e)(3)(iii) through (v)](/cfr/40/63.6.md?p=e-3-iii..e-3-v) related to startup, shutdown, and malfunction.
  - (3) If your initial startup was after September 3, 2019, then as of July 10, 2020, and for all sources after January 6, 2021, for each deviation from an emissions limitation (including an operating limit) or work practice standard occurring at an affected source, you must record information on the number of deviations. For each deviation, include the date, time, and duration, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, the actions taken to minimize emissions, the cause of the deviation (including unknown cause), as applicable, and the corrective actions taken to return the affected unit to its normal or usual manner of operation.
  - (4) For pressure relief devices in remediation material service, keep records of the information specified in [paragraphs (a)(4)(i) through (iii)](#a-4-i..a-4-iii) of this section, as applicable.
    - (i) A list of identification numbers for pressure relief devices that are not subject to the requirements of § [63.7923(c)](/cfr/40/63.7923.md?p=c) and [(d)](/cfr/40/63.7923.md?p=d) under the provisions of [§ 63.7923(e)](/cfr/40/63.7923.md?p=e).
    - (ii) A list of identification numbers for pressure relief devices subject to the requirements of § [63.7923(a)](/cfr/40/63.7923.md?p=a), [(c)](/cfr/40/63.7923.md?p=c), and [(d)](/cfr/40/63.7923.md?p=d) that do not consist of or include a rupture disk.
    - (iii) A list of identification numbers for pressure relief devices subject to the requirements of § [63.7923(a)](/cfr/40/63.7923.md?p=a), [(c)](/cfr/40/63.7923.md?p=c), and [(d)](/cfr/40/63.7923.md?p=d) equipped with rupture disks.
  - (5) For pressure relief devices in remediation material service subject to [§ 63.7923(d)](/cfr/40/63.7923.md?p=d), keep records of each pressure release event to the atmosphere as specified in [paragraphs (a)(5)(i) through (viii)](#a-5-i..a-5-viii) of this section.
    - (i) **The date, time, and duration of the pressure release event.**
    - (ii) The dates and results of the EPA Method 21 of [40 CFR part 60](/cfr/40/part60.md), appendix A, monitoring following a pressure release event, if applicable. The results of each monitoring event shall include the measured background level and the maximum instrument reading measured at each pressure relief device.
    - (iii) **The dates replacement rupture disks were installed following a pressure release event, if applicable.**
    - (iv) An estimate of the mass quantity of total HAP listed in Table 1 of this subpart emitted during the pressure release event and the method used for determining this quantity.
    - (v) The source, nature and cause of the pressure release event, including an identification of the affected pressure relief device(s) and a statement noting whether the event resulted from the same cause(s) identified following a previous pressure release event.
    - (vi) The corrective measures identified to prevent future such pressure release events, or an explanation of why corrective measures are not necessary.
    - (vii) **The actions taken to prevent this pressure release event.**
    - (viii) Records of the corrective measures implemented, including a description of the corrective measure(s) completed within the first 45 days following a pressure release event, and, if applicable, the implementation schedule for planned corrective measures to be implemented subsequent to the first 45 days following the pressure release event, including proposed commencement and completion dates.
  - (6) Records of the number of pressure release events during each calendar year and the number of those events for which the cause was determined to be a force majeure event. Keep these records for the current calendar year and the past 5 calendar years.
  - (7)
    - (i) For pressure tank closure devices, as specified in [§ 63.7895(d)(4)](/cfr/40/63.7895.md?p=d-4), keep records of each release to the atmosphere, including the information specified in [paragraphs (a)(7)(iii)(A) through (G)](#a-7-iii-A..a-7-iii-G) of this section.
    - (ii) For each closed vent system that includes bypass devices that could divert a stream away from the control device and into the atmosphere, as specified in [§ 63.7927(a)(2)](/cfr/40/63.7927.md?p=a-2), and each open-ended valve or line in an emergency shutdown system which is designed to open automatically in the event of a process upset, as specified in [§ 63.1014(c)](/cfr/40/63.1014.md?p=c) or [§ 63.1033(c)](/cfr/40/63.1033.md?p=c), keep records of each release to the atmosphere, including the information specified in [paragraphs (a)(7)(iii)(A)](#a-7-iii-A) though (G) of this section.
    - (iii)
      - (A) **The source, nature, and cause of the release.**
      - (B) **The date, time, and duration of the release.**
      - (C) An estimate of the quantity of HAP listed in Table 1 of this subpart emitted during the release and the calculations used for determining this quantity.
      - (D) **The actions taken to prevent this release.**
      - (E) **The measures adopted to prevent future such release.**
      - (F) Hourly records of whether the bypass flow indicator specified under [§ 63.7927(a)(2)(i)](/cfr/40/63.7927.md?p=a-2-i) was operating and whether a diversion was detected at any time during the hour, as well as records of the times of all periods when the vent stream is diverted from the control device or the flow indicator is not operating.
      - (G) Where a seal mechanism is used to comply with [§ 63.7927(a)(2)(ii)](/cfr/40/63.7927.md?p=a-2-ii), hourly records of flow are not required. In such cases, you must record that the monthly visual inspection of the seals or closure mechanism has been done and record the duration of all periods when the seal mechanism is broken, the bypass line valve position has changed, or the key for a lock-and-key type lock has been checked out, and records of any car-seal that has broken.
  - (8) A record of the fluid level at the beginning and end of each maintenance period during which the tank is subject to [§ 63.7925(b)(3)](/cfr/40/63.7925.md?p=b-3).
  - (9) Results of performance tests and performance evaluations as required by [§ 63.10(b)(2)(viii)](/cfr/40/63.10.md?p=b-2-viii).
  - (10) The records of initial and ongoing determinations for affected sources that are exempt from control requirements under this subpart.
- (b) For each continuous monitoring system, you must keep the records as described in paragraphs [(b)(1)](#b-1) and [(2)](#b-2) of this section.
  - (1) Records described in [§ 63.10(b)(2)(vi) through (xi)](/cfr/40/63.10.md?p=b-2-vi..b-2-xi) that apply to your continuous monitoring system.
  - (2) Performance evaluation plans, including previous (i.e., superseded) versions of the plan as required in [§ 63.8(d)(3)](/cfr/40/63.8.md?p=d-3).
- (c) You must keep the records required by this subpart to show continuous compliance with each emissions limitation, work practice standard, and operation and maintenance requirement that applies to you.
- (d) You must record, on a semiannual basis, the information in [§ 63.696(g)](/cfr/40/63.696.md?p=g) for planned routine maintenance of a control device for emissions from process vents.
- (e) Any records required to be maintained by this part that are submitted electronically via the EPA's CEDRI may be maintained in electronic format. This ability to maintain electronic copies does not affect the requirement for facilities to make records, data, and reports available upon request to a delegated air agency or the EPA as part of an on-site compliance evaluation.

# §63.7953. In what form and how long must I keep my records?

- (a) Your records must be in a form suitable and readily available for expeditious review, according to [§ 63.10(b)(1)](/cfr/40/63.10.md?p=b-1).
- (b) As specified in [§ 63.10(b)(1)](/cfr/40/63.10.md?p=b-1), you must keep your files of all information (including all reports and notifications) for 5 years following the date of each occurrence, measurement, maintenance, action taken to correct the cause of a deviation, report, or record.
- (c) You must keep each record on site for at least 2 years after the date of each occurrence, measurement, maintenance, corrective action, report, or record, according to [§ 63.10(b)(1)](/cfr/40/63.10.md?p=b-1). You can keep the records off-site for the remaining 3 years.
- (d) If, after the remediation activity is completed, there is no other remediation activity at the facility, and you are no longer the owner of the facility, you may keep all records for the completed remediation activity at an off-site location provided you notify the Administrator in writing of the name, address and contact person for the off-site location.

# §63.7955. What parts of the General Provisions apply to me?


Table 3 of this subpart shows which parts of the General Provisions in [§§ 63.1 through 63.15](/cfr/40/63.1..63.15.md) apply to you.