# §63.787. Notification requirements.

- (a) Each owner or operator of an affected source shall comply with all applicable notification requirements in § [63.9(a) through (d)](/cfr/40/63.9.md?p=a..d) and [(i) through (j)](/cfr/40/63.9.md?p=i..j), with the exception that the deadline specified in [§ 63.9(b)](/cfr/40/63.9.md?p=b) (2) and (3) shall be extended from 120 days to 180 days. Any owner or operator that receives approval pursuant to [§ 63.783(c)](/cfr/40/63.783.md?p=c) to use an add-on control system to control coating emissions shall comply with the applicable requirements of [§ 63.9(e) through (h)](/cfr/40/63.9.md?p=e..h).
- (b) **Implementation plan.** The provisions of [§ 63.9(a)](/cfr/40/63.9.md?p=a) apply to the requirements of this paragraph.
  - (1) **Each owner or operator of an affected source shall—**
    - (i) Prepare a written implementation plan that addresses each of the subject areas specified in [paragraph (b)(3)](#b-3) of this section; and
    - (ii) Not later than one year after the effective date of this subpart, submit the implementation plan to the Administrator along with the notification required by § [63.9(b)(2)](/cfr/40/63.9.md?p=b-2) or [(b)(5)](/cfr/40/63.9.md?p=b-5) of [subpart A](/cfr/40/subpartA.md), as applicable.
  - (2) [Reserved]
  - (3) **Implementation plan contents.** Each implementation plan shall address the following subject areas:
    - (i) **Coating compliance procedures.** The implementation plan shall include the compliance procedure(s) under [§ 63.785(c)](/cfr/40/63.785.md?p=c) that the source intends to use.
    - (ii) **Recordkeeping procedures.** The implementation plan shall include the procedures for maintaining the records required under [§ 63.788](/cfr/40/63.788.md), including the procedures for gathering the necessary data and making the necessary calculations.
    - (iii) **Transfer, handling, and storage procedures.** The implementation plan shall include the procedures for ensuring compliance with [§ 63.783(b)](/cfr/40/63.783.md?p=b).
  - (4) **Major sources that intend to become area sources by the compliance date.** Existing major sources that intend to become area sources by the December 16, 1997 compliance date may choose to submit, in lieu of the implementation plan required under [paragraph (b)(1)](#b-1) of this section, a statement that, by the compliance date, the major source intends to obtain and comply with federally enforceable limits on their potential to emit which make the facility an area source.

## Notes

### Amendments

[60 FR 64336, Dec. 15, 1995, as amended at 61 FR 30816, June 18, 1996]

### Source

Source: 60 FR 64336, Dec. 15, 1995, unless otherwise noted.

### Authority

Authority: 42 U.S.C. 7401 et seq.

### Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.

### Amendments

[60 FR 64336, Dec. 15, 1995, as amended at 61 FR 30816, June 18, 1996]