---
kind: "section"
citation: "40 C.F.R. § 63.7736"
title: "40"
number: "63.7736"
heading: "How do I demonstrate initial compliance with the operation and maintenance requirements that apply to me?"
url: "https://uscodex.org/cfr/40/63.7736"
---

# §63.7736. How do I demonstrate initial compliance with the operation and maintenance requirements that apply to me?

- (a) For each capture system subject to an operating limit in [§ 63.7690(b)](/cfr/40/63.7690.md?p=b), you have demonstrated initial compliance if you have met the conditions in paragraphs [(a)(1)](#a-1) and [(2)](#a-2) of this section.
  - (1) **You have certified in your notification of compliance status that—**
    - (i) You have submitted the capture system operation and maintenance plan to the Administrator for approval according to the requirements of [§ 63.7710(b)](/cfr/40/63.7710.md?p=b); and
    - (ii) You will inspect, operate, and maintain each capture system according to the procedures in the plan.
  - (2) You have certified in your performance test report that the system operated during the test at the operating limits established in your operation and maintenance plan.
- (b) For each control device subject to an operating limit in [§ 63.7690(b)](/cfr/40/63.7690.md?p=b), you have demonstrated initial compliance if you have certified in your notification of compliance status that:
  - (1) You have submitted the control device operation and maintenance plan to the Administrator for approval according to the requirements of [§ 63.7710(b)](/cfr/40/63.7710.md?p=b); and
  - (2) You will inspect, operate, and maintain each control device according to the procedures in the plan.
- (c) For each bag leak detection system, you have demonstrated initial compliance if you have certified in your notification of compliance status that:
  - (1) You have submitted the bag leak detection system monitoring information to the Administrator within the written O&M plan for approval according to the requirements of [§ 63.7710(b)](/cfr/40/63.7710.md?p=b);
  - (2) You will inspect, operate, and maintain each bag leak detection system according to the procedures in the plan; and
  - (3) You will follow the corrective action procedures for bag leak detection system alarms according to the requirements in the plan.
- (d) For each pouring area and pouring station in a new or existing foundry, you have demonstrated initial compliance if you have certified in your notification of compliance status report that:
  - (1) You have submitted the mold vent ignition plan to the Administrator for approval according to the requirements in [§ 63.7710(b)](/cfr/40/63.7710.md?p=b); and
  - (2) You will follow the procedures for igniting mold vent gases according to the requirements in the plan.

## Notes

### Amendments

[69 FR 21923, Apr. 22, 2004, as amended at 73 FR 7221, Feb. 7, 2008]

### Source

Source: 69 FR 21923, Apr. 22, 2004, unless otherwise noted.

### Authority

Authority: 42 U.S.C. 7401 et seq.

### Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.

### Amendments

[69 FR 21923, Apr. 22, 2004, as amended at 73 FR 7221, Feb. 7, 2008]
