---
kind: "section"
citation: "40 C.F.R. § 63.7185"
title: "40"
number: "63.7185"
heading: "What are my general requirements for complying with this subpart?"
url: "https://uscodex.org/cfr/40/63.7185"
---

# §63.7185. What are my general requirements for complying with this subpart?

- (a) You must be in compliance with the requirements of [§ 63.7184](/cfr/40/63.7184.md) at all times, except during periods of startup, shutdown, or malfunction.
- (b) You must always operate and maintain your affected source, including air pollution control and monitoring equipment, according to the provisions in [§ 63.6(e)(1)(i)](/cfr/40/63.6.md?p=e-1-i).
- (c) You must develop a written startup, shutdown, and malfunction plan (SSMP). Your SSMP must be prepared in accordance with the provisions in [§ 63.6(e)(3)](/cfr/40/63.6.md?p=e-3).
- (d) You must perform all the items listed in [paragraphs (d)(1) through (3)](#d-1..d-3) of this section:
  - (1) Submit the necessary notifications in accordance with [§ 63.7189](/cfr/40/63.7189.md).
  - (2) Submit the necessary reports in accordance with [§ 63.7190](/cfr/40/63.7190.md).
  - (3) Maintain all necessary records you have used to demonstrate compliance with this subpart in accordance with [§ 63.7191](/cfr/40/63.7191.md).

## Notes

### Amendments

[68 FR 27925, May 22, 2003, as amended at 71 FR 20467, Apr. 20, 2006]

### Source

Source: 68 FR 27925, May 22, 2003, unless otherwise noted.

### Authority

Authority: 42 U.S.C. 7401 et seq.

### Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.

### Amendments

[68 FR 27925, May 22, 2003, as amended at 71 FR 20467, Apr. 20, 2006]
