---
kind: "section"
citation: "40 C.F.R. § 63.11411"
title: "40"
number: "63.11411"
heading: "What General Provisions apply to this subpart?"
url: "https://uscodex.org/cfr/40/63.11411"
---

# §63.11411. What General Provisions apply to this subpart?

- (a) You must comply with the requirements of the General Provisions in [40 CFR part 63](/cfr/40/part63.md), [subpart A](/cfr/40/subpartA.md) as specified in Table 2 to this subpart.
- (b) Your notification of compliance status required by [§ 63.9(h)](/cfr/40/63.9.md?p=h) must include the following information for a new or existing affected source:
  - (1) This certification of compliance, signed by a responsible official, for the standards in [§ 63.11409(a)](/cfr/40/63.11409.md?p=a): “This facility complies with the management practice requirements in [§ 63.11409(a)](/cfr/40/63.11409.md?p=a) for installation and operation of capture systems for each emissions source subject to an emissions limit in [§ 63.11409(b)](/cfr/40/63.11409.md?p=b).”
  - (2) This certification of compliance by the owner or operator of an existing source (if applicable), signed by a responsible official, for the emissions limits in [§ 63.11409(b)](/cfr/40/63.11409.md?p=b): “This facility complies with the emissions limits in [§ 63.11409(b)](/cfr/40/63.11409.md?p=b) based on a previous performance test in accordance with [§ 63.11410(i)](/cfr/40/63.11410.md?p=i).”
  - (3) The process rate for each emissions source subject to an emissions limit in [§ 63.11409(b)](/cfr/40/63.11409.md?p=b) that represents normal and representative production operations.
  - (4) The procedures used to measure and record the process rate for each emissions source subject to an emissions limit in [§ 63.11409(b)](/cfr/40/63.11409.md?p=b).
  - (5) This certification of compliance by the owner or operator of an existing affected source, signed by a responsible official, for the control device inspection and maintenance requirements in [§ 63.11410(b) through (d)](/cfr/40/63.11410.md?p=b..d): “This facility has conducted an initial inspection of each control device according to the requirements in [§ 63.11410(b)](/cfr/40/63.11410.md?p=b), will conduct periodic inspections and maintenance of control devices in accordance with [§ 63.11410(c)](/cfr/40/63.11410.md?p=c), and will maintain records of each inspection and maintenance action in the logbook required by [§ 63.11410(d)](/cfr/40/63.11410.md?p=d).”
  - (6) This certification of compliance by the owner or operator of a new affected source, signed by a responsible official, for the bag leak detection system monitoring plan requirement in [§ 63.11410(g)(2)](/cfr/40/63.11410.md?p=g-2): “This facility has an approved bag leak detection system monitoring plan in accordance with [§ 63.11410(g)(2)](/cfr/40/63.11410.md?p=g-2).”
  - (7) Performance test results for each emissions unit at a new affected source (or each emissions source at an existing affected source if a test is required) in accordance with [§ 63.11410(j)](/cfr/40/63.11410.md?p=j). The performance test results for a new affected source must identify the daily average parameter operating limit for each PM control device.
  - (8) If applicable, this certification of compliance by the owner or operator of a new or existing source, signed by a responsible official, for the requirement in paragraph (k)(2) of this section to comply with the startup, shutdown, and malfunction provisions in [40 CFR 63.6(e)(3)](/cfr/40/63.6.md?p=e-3): “This facility has prepared a startup, shutdown, and malfunction plan in accordance with [40 CFR 63.6(e)(3)](/cfr/40/63.6.md?p=e-3)”.

## Notes

### Source

Source: 72 FR 38905, July 16, 2007, unless otherwise noted.

### Authority

Authority: 42 U.S.C. 7401 et seq.

### Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.
