---
kind: "section"
citation: "40 C.F.R. § 63.11087"
title: "40"
number: "63.11087"
heading: "What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline pumping station?"
url: "https://uscodex.org/cfr/40/63.11087"
---

# §63.11087. What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline pumping station?

- (a) You must meet each emission limit and management practice in Table 1 to this subpart that applies to your gasoline storage tank.
- (b) You must comply with the requirements of this subpart by the applicable dates specified in [§ 63.11083](/cfr/40/63.11083.md), except that storage vessels equipped with floating roofs and not meeting the requirements of [paragraph (a)](#a) of this section must be in compliance at the first degassing and cleaning activity after January 10, 2011 or by January 10, 2018, whichever is first.
- (c) You must comply with the applicable testing and monitoring requirements specified in [§ 63.11092(f)](/cfr/40/63.11092.md?p=f).
- (d) You must submit the applicable notifications as required under [§ 63.11093](/cfr/40/63.11093.md).
- (e) You must keep records and submit reports as specified in §§ [63.11094](/cfr/40/63.11094.md) and [63.11095](/cfr/40/63.11095.md).
- (f) If your gasoline storage tank is subject to, and complies with, the control requirements of [40 CFR part 60](/cfr/40/part60.md), [subpart Kb](/cfr/40/subpartKb.md) of this chapter, your storage tank will be deemed in compliance with this section. You must report this determination in the Notification of Compliance Status report under [§ 63.11093(b)](/cfr/40/63.11093.md?p=b).
- (g) No later than the dates specified in [§ 63.11083](/cfr/40/63.11083.md), if your gasoline storage tank is subject to, and complies with, the control requirements of § [60.112b(a)(2)](/cfr/40/60.112b.md?p=a-2), [(3)](/cfr/40/60.112b.md?p=a-3), or [(4)](/cfr/40/60.112b.md?p=a-4) of this chapter, your storage tank will be deemed in compliance with this section. If your gasoline storage tank is subject to the control requirements of [§ 60.112b(a)(1)](/cfr/40/60.112b.md?p=a-1) of this chapter, you must conduct lower explosive limit (LEL) monitoring as specified in [§ 63.11092(f)(1)(ii)](/cfr/40/63.11092.md?p=f-1-ii) to demonstrate compliance with this section. You must report this determination in the Notification of Compliance Status report under [§ 63.11093(b)](/cfr/40/63.11093.md?p=b). The requirements in [paragraph (f)](#f) of this section do not apply when demonstrating compliance with this [paragraph (g)](#g).

## Notes

### Amendments

[73 FR 1933, Jan. 10, 2008, as amended at 89 FR 39374, May 8, 2024]

### Source

Source: 73 FR 1933, Jan. 10, 2008, unless otherwise noted.

### Authority

Authority: 42 U.S.C. 7401 et seq.

### Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.

### Amendments

[73 FR 1933, Jan. 10, 2008, as amended at 89 FR 39374, May 8, 2024]
