---
kind: "section"
citation: "40 C.F.R. § 62.15900"
title: "40"
number: "62.15900"
heading: "How do I comply with the requirement for submittal of a control plan?"
url: "https://uscodex.org/cfr/40/62.15900"
---

# §62.15900. How do I comply with the requirement for submittal of a control plan?


For your control plan, you must satisfy the two requirements specified in paragraphs [(a)](#a) and [(b)](#b) of this section.

- (a) Submit the final control plan to your EPA regional office and permitting authority or delegated authority that includes the four items described in [paragraphs (a)(1) through (4)](#a-1..a-4) of this section:
  - (1) A description of the devices for air pollution control and process changes that you will use to comply with the emission limits and standards and other requirements of this subpart;
  - (2) The type(s) of waste to be burned, if waste other than sewage sludge is burned in the unit;
  - (3) The maximum design sewage sludge burning capacity; and
  - (4) If applicable, the petition for site-specific operating limits under [§ 62.15965](/cfr/40/62.15965.md).
- (b) **Maintain an onsite copy of the final control plan.**

## Notes

### Source

Source: 81 FR 26063, Apr. 29, 2016, unless otherwise noted.

### Authority

Authority: 42 U.S.C. 7401 et seq.

### Source

Source: 43 FR 51393, Nov. 3, 1978, unless otherwise noted.
