# §62.15065. How do I comply with the increment of progress for submittal of a final control plan?


For your final control plan increment of progress, you must complete two items:

- (a) Submit the final control plan describing the devices for air pollution control and process changes that you will use to comply with the emission limits and other requirements of this subpart. If you plan to reduce your small municipal waste combustion unit's combustion capacity to less than 35 tons per day by the final compliance date, see [§ 62.15030](/cfr/40/62.15030.md).
- (b) You must maintain an onsite copy of the final control plan.

# §62.15070. How do I comply with the increment of progress for awarding contracts?


You must submit a signed copy of the contracts awarded to initiate onsite construction, initiate onsite installation of emission control equipment, and incorporate process changes. Submit the copy of the contracts with the notification that this increment of progress has been achieved. You do not need to include documents incorporated by reference or the attachments to the contracts.


# §62.15075. How do I comply with the increment of progress for initiating onsite construction?


You must initiate onsite construction and installation of emission control equipment and initiate the process changes outlined in the final control plan.


# §62.15080. How do I comply with the increment of progress for completing onsite construction?


You must complete onsite construction and installation of emission control equipment and complete process changes outlined in the final control plan.


# §62.15085. How do I comply with the increment of progress for achieving final compliance?


For the final compliance increment of progress, you must complete two items:

- (a) Complete all process changes and complete retrofit construction as specified in the final control plan.
- (b) Connect the air pollution control equipment with the municipal waste combustion unit identified in the final control plan and complete process changes to the municipal waste combustion unit so that if the affected municipal waste combustion unit is brought online, all necessary process changes and air pollution control equipment are operating as designed.