---
kind: "section"
citation: "40 C.F.R. § 60.2760"
title: "40"
number: "60.2760"
heading: "What information must I submit following my initial performance test?"
url: "https://uscodex.org/cfr/40/60.2760"
---

# §60.2760. What information must I submit following my initial performance test?


You must submit the information specified in [paragraphs (a) through (c)](#a..c) of this section no later than 60 days following the initial performance test. All reports must be signed by the facilities manager:

- (a) The complete test report for the initial performance test results obtained under [§ 60.2700](/cfr/40/60.2700.md), as applicable;
- (b) The values for the site-specific operating limits established in [§ 60.2675](/cfr/40/60.2675.md) or [§ 60.2680](/cfr/40/60.2680.md); and
- (c) If you are using a fabric filter to comply with the emission limitations, documentation that a bag leak detection system has been installed and is being operated, calibrated, and maintained as required by [§ 60.2730(b)](/cfr/40/60.2730.md?p=b).

## Notes

### Source

Source: 84 FR 15884, Apr. 16, 2019, unless otherwise noted.

### Authority

Authority: 42 U.S.C. 7401 et seq.

### Source

Source: 36 FR 24877, Dec. 23, 1971, unless otherwise noted.
