---
kind: "section"
citation: "40 C.F.R. § 60.2716"
title: "40"
number: "60.2716"
heading: "By what date must I conduct the annual air pollution control device inspection?"
url: "https://uscodex.org/cfr/40/60.2716"
---

# §60.2716. By what date must I conduct the annual air pollution control device inspection?


On an annual basis (no more than 12 months following the previous annual air pollution control device inspection), you must complete the air pollution control device inspection as described in [§ 60.2706](/cfr/40/60.2706.md).


## Notes

### Source

Source: 84 FR 15884, Apr. 16, 2019, unless otherwise noted.

### Authority

Authority: 42 U.S.C. 7401 et seq.

### Source

Source: 36 FR 24877, Dec. 23, 1971, unless otherwise noted.
