---
kind: "section"
citation: "40 C.F.R. § 60.2600"
title: "40"
number: "60.2600"
heading: "How do I comply with the increment of progress for submittal of a control plan?"
url: "https://uscodex.org/cfr/40/60.2600"
---

# §60.2600. How do I comply with the increment of progress for submittal of a control plan?


For your control plan increment of progress, you must satisfy the two requirements specified in paragraphs [(a)](#a) and [(b)](#b) of this section:

- (a) Submit the final control plan that includes the five items described in [paragraphs (a)(1) through (5)](#a-1..a-5) of this section:
  - (1) A description of the devices for air pollution control and process changes that you will use to comply with the emission limitations and other requirements of this subpart;
  - (2) The type(s) of waste to be burned;
  - (3) The maximum design waste burning capacity;
  - (4) The anticipated maximum charge rate; and
  - (5) If applicable, the petition for site-specific operating limits under [§ 60.2680](/cfr/40/60.2680.md).
- (b) **Maintain an onsite copy of the final control plan.**

## Notes

### Source

Source: 84 FR 15884, Apr. 16, 2019, unless otherwise noted.

### Authority

Authority: 42 U.S.C. 7401 et seq.

### Source

Source: 36 FR 24877, Dec. 23, 1971, unless otherwise noted.
