# §267.54. When must I amend the contingency plan?


You must review, and immediately amend the contingency plan, if necessary, whenever:

- (a) **The facility permit is revised.**
- (b) **The plan fails in an emergency.**
- (c) You change the facility (in its design, construction, operation, maintenance, or other circumstances) in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency.
- (d) **You change the list of emergency coordinators.**
- (e) **You change the list of emergency equipment.**