---
kind: "section"
citation: "40 C.F.R. § 265.1089"
title: "40"
number: "265.1089"
heading: "Inspection and monitoring requirements."
url: "https://uscodex.org/cfr/40/265.1089"
---

# §265.1089. Inspection and monitoring requirements.

- (a) The owner or operator shall inspect and monitor air emission control equipment used to comply with this subpart in accordance with the applicable requirements specified in [§ 265.1085](/cfr/40/265.1085.md) through [§ 265.1088](/cfr/40/265.1088.md) of this subpart.
- (b) The owner or operator shall develop and implement a written plan and schedule to perform the inspections and monitoring required by [paragraph (a)](#a) of this section. The owner or operator shall incorporate this plan and schedule into the facility inspection plan required under [40 CFR 265.15](/cfr/40/265.15.md).

## Notes

### Amendments

[61 FR 59990, Nov. 25, 1996]

### Source

Source: 59 FR 62935, Dec. 6, 1994, unless otherwise noted.

### Authority

Authority: 42 U.S.C. 6905, 6906, 6912, 6922, 6923, 6924, 6925, 6935, 6936, 6937, and 6939g.

### Source

Source: 45 FR 33232, May 19, 1980, unless otherwise noted.

### Amendments

[61 FR 59990, Nov. 25, 1996]
