---
kind: "section"
citation: "40 C.F.R. § 192.03"
title: "40"
number: "192.03"
heading: "Monitoring."
url: "https://uscodex.org/cfr/40/192.03"
---

# §192.03. Monitoring.


A groundwater monitoring plan shall be implemented, to be carried out over a period of time commencing upon completion of remedial actions taken to comply with the standards in [§ 192.02](/cfr/40/192.02.md), and of a duration which is adequate to demonstrate that future performance of the system of disposal can reasonably be expected to be in accordance with the design requirements of [§ 192.02(c)](/cfr/40/192.02.md?p=c). This plan and the length of the monitoring period shall be modified to incorporate any corrective actions required under [§ 192.04](/cfr/40/192.04.md) or [§ 192.12(c)](/cfr/40/192.12.md?p=c).


## Notes

### Amendments

[60 FR 2866, Jan. 11, 1995]

### Authority

Authority: Sec. 275 of the Atomic Energy Act of 1954, 42 U.S.C. 2022, as added by the Uranium Mill Tailings Radiation Control Act of 1978, Pub. L. 95-604, as amended.

### Source

Source: 48 FR 602, Jan. 5, 1983, unless otherwise noted.

### Amendments

[60 FR 2868, Jan. 11, 1995]

### Amendments

[60 FR 2866, Jan. 11, 1995]
