# §9.73. If I don't need an operations permit, are there still requirements that I must meet?


If the NPS notifies you under [§ 9.72](/cfr/36/9.72.md) that you do not need an operations permit, your operations are still subject to the general terms and conditions in [§§ 9.120 through 9.122](/cfr/36/9.120..9.122.md), the prohibitions and penalties in [§§ 9.180 through 9.182](/cfr/36/9.180..9.182.md), and the requirements in this section.

- (a) You must notify the NPS within 30 days if the methods or the environmental conditions of your downhole operations materially change.
- (b) The Regional Director may notify you in writing that you are no longer exempt from the operations permit requirement after determining that downhole operational requirements are needed to protect against a significant threat of damage to any of the following:
  - (1) Federally owned or administered lands, waters, or resources of System units;
  - (2) NPS visitor uses or experiences; or
  - (3) **Visitor or employee health or safety.**
- (c) Within 30 days after receiving this notification, you must file your operations permit application with the Superintendent.