---
kind: "section"
citation: "36 C.F.R. § 9.62"
title: "36"
number: "9.62"
heading: "When will the NPS grant a temporary access permit?"
url: "https://uscodex.org/cfr/36/9.62"
---

# §9.62. When will the NPS grant a temporary access permit?


If the Regional Director determines that your proposed reconnaissance surveys will not result in surface disturbance, except for minimal disturbance necessary to perform required surveys, the Regional Director will issue you a temporary access permit within 30 days after receipt of a complete application, unless the Regional Director notifies you that additional time is necessary to evaluate or process your application.


## Notes

### Authority

Authority: 16 U.S.C. 230a(a)(4), 459d-3, 460cc-2(i), 460ee(c)(4), 698c(b)(2), 698i(b)(2), and 698m-4; 18 U.S.C. 3571 and 3581; 31 U.S.C. 9701; 54 U.S.C. 100101, 100751, and 103104.

### Source

Source: 81 FR 77992, Nov. 4, 2016, unless otherwise noted.
