---
kind: "section"
citation: "36 C.F.R. § 9.171"
title: "36"
number: "9.171"
heading: "Can I get an extension to the well plugging requirement?"
url: "https://uscodex.org/cfr/36/9.171"
---

# §9.171. Can I get an extension to the well plugging requirement?

- (a) You may apply for either a modification to your approved operations permit or, in the case of previously exempt operations, an operations permit to maintain your well in a shut-in status for up to 5 years. The application must include:
  - (1) An explanation of why the well is shut-in or temporarily abandoned and your future plans for utilization;
  - (2) Proof of the mechanical integrity of both surface and production casing demonstrating that no migration of fluid can be expected to occur; and
  - (3) A description of the manner in which your well, equipment, and area of operations will be maintained.
- (b) Based on the information provided under this section, the Regional Director may approve your application to maintain your well in shut-in status for a period up to 5 years. You may apply for additional extensions by submitting a new application under [paragraph (a)](#a) of this section.

## Notes

### Authority

Authority: 16 U.S.C. 230a(a)(4), 459d-3, 460cc-2(i), 460ee(c)(4), 698c(b)(2), 698i(b)(2), and 698m-4; 18 U.S.C. 3571 and 3581; 31 U.S.C. 9701; 54 U.S.C. 100101, 100751, and 103104.

### Source

Source: 81 FR 77992, Nov. 4, 2016, unless otherwise noted.
