---
kind: "section"
citation: "34 C.F.R. § 75.605"
title: "34"
number: "75.605"
heading: "After the construction."
url: "https://uscodex.org/cfr/34/75.605"
---

# §75.605. After the construction.

- (a) A grantee must ensure that sufficient funds will be available for effective operation and maintenance of the facilities after the construction is complete.
- (b) A grantee must operate and maintain the facilities in accordance with applicable Federal, State, and local requirements.
- (c) A grantee must maintain all financial records, supporting documents, statistical records, and other non-Federal entity records pertinent to the construction project consistent with [2 CFR 200.334](/cfr/2/200.334.md).

## Notes

### Amendments

[89 FR 70332, Aug. 29, 2024]

### Authority

Authority: 20 U.S.C. 1221e-3 and 3474, unless otherwise noted. Section 75.263 also issued under 2 CFR 200.308(e)(1). Section 75.617 also issued under 31 U.S.C. 3504, 3505. Section 75.740 also issued under 20 U.S.C. 1232g and 1232h.

### Source

Source: 45 FR 22497, Apr. 3, 1980, unless otherwise noted. Redesignated at 45 FR 77368, Nov. 21, 1980.

### Amendments

[89 FR 70332, Aug. 29, 2024]
