---
kind: "section"
citation: "33 C.F.R. § 158.163"
title: "33"
number: "158.163"
heading: "Reception facility operations."
url: "https://uscodex.org/cfr/33/158.163"
---

# §158.163. Reception facility operations.

- (a) Each person in charge and each person who is in charge of a reception facility shall ensure that the reception facility does not operate in a manner that violates any requirement under this part.
- (b) A copy of the Certificate of Adequacy issued for the port or terminal must be—
  - (1) At each port and terminal under this part; and
  - (2) Available for inspection by the COTP and the master, operator, person who is in charge of a ship, or agent for a ship.
- (c) Ports and terminals required to have an Operations Manual under this chapter or [46 CFR Chapter 1](/cfr/46/ch1.md) must have a copy of the Certificate of Adequacy issued for the port or terminal, including any waivers, attached to that Operations Manual.

## Notes

### Amendments

[CGD 85-010, 52 FR 7761, Mar. 12, 1987, as amended by CGD 88-002, 54 FR 18409, Apr. 28, 1989]

### Source

Source: CGD 85-010, 52 FR 7761, Mar. 12, 1987, unless otherwise noted.

### Authority

Authority: 33 U.S.C. 1903(b), 1905(c); 49 CFR 1.46.

### Amendments

[CGD 85-010, 52 FR 7761, Mar. 12, 1987, as amended by CGD 88-002, 54 FR 18409, Apr. 28, 1989]
