---
kind: "section"
citation: "33 C.F.R. § 117.731"
title: "33"
number: "117.731"
heading: "Mullica River."
url: "https://uscodex.org/cfr/33/117.731"
---

# §117.731. Mullica River.


The draws of the bridges listed in this section shall open on signal, except as follows:

- (a) The draw of the Lower Bank bridge, mile 15.0, need not open during the following periods unless at least four hours notice is given:
  - (1) From May 1 through November 30, from 11 p.m. to 7 a.m.
  - (2) **From December 1 through April 30, at all times.**
- (b) The draw of the Green Bank bridge, mile 18.0, need not open unless at least four hours notice is given during the following periods:
  - (1) April 1 through November 30, from 11 p.m. to 7 a.m.
  - (2) **December 1 through March 31, at all times.**
- (c) The drawspan must open as soon as possible for public vessels of the United States during the periods when four hours notice is required.

## Notes

### Amendments

[CGD5-87-065, 53 FR 406, Jan. 7, 1988, as amended by CGD05 94-093, 60 FR 51732, Oct. 3, 1995. Redesignated and amended by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006]

### Authority

Authority: 33 U.S.C. 499; 33 CFR 1.05-1; and DHS Delegation No. 00170.1, Revision No. 01.4.

### Source

Source: CGD 82-025, 49 FR 17452, Apr. 24, 1984, unless otherwise noted.

### Amendments

[CGD5-87-065, 53 FR 406, Jan. 7, 1988, as amended by CGD05 94-093, 60 FR 51732, Oct. 3, 1995. Redesignated and amended by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006]
