---
kind: "section"
citation: "30 C.F.R. § 586.105"
title: "30"
number: "586.105"
heading: "What are my responsibilities under this part?"
url: "https://uscodex.org/cfr/30/586.105"
---

# §586.105. What are my responsibilities under this part?


As an applicant, operator, or holder of an Alternate Use RUE grant, you must:

- (a) Design your projects and conduct all activities in a manner that ensures safety and will not cause undue harm or damage to natural resources, including their physical, atmospheric, and biological components to the extent practicable; and take measures to prevent unauthorized discharge of pollutants including marine trash and debris into the offshore environment.
- (b) Submit requests, applications, plans, notices, modifications, and supplemental information to BOEM as required by this part;
- (c) Follow-up, in writing, any oral request or notification you made, within 3 business days;
- (d) Comply with the terms, conditions, and provisions of all reports and notices submitted to BOEM, and of all plans, revisions, and other BOEM approvals, as provided in this part;
- (e) Make all applicable payments on time;
- (f) Comply with the DOI's non-procurement debarment regulations at [2 CFR part 1400](/cfr/2/part1400.md);
- (g) Include the requirement to comply with [2 CFR part 1400](/cfr/2/part1400.md) in all contracts and transactions related to a lease or grant under this part;
- (h) Conduct all activities authorized by the lease or grant in a manner consistent with the provisions of subsection 8(p) of the OCS Lands Act;
- (i) Compile, retain, and make available to BOEM representatives, within the time specified by BOEM, any data and information related to the site assessment, design, and operations of your project; and
- (j) **Respond to requests from the Director in a timely manner.**

## Notes

### Authority

Authority: 43 U.S.C. 1337.

### Source

Source: 88 FR 6468, Jan. 31, 2023, unless otherwise noted.
