# §550.1155. What information must I submit for sensitive reservoirs?


You must submit to the Regional Supervisor an original and two copies of Form BOEM-0127; one of the copies must be a public information copy in accordance with §§ [550.186](/cfr/30/550.186.md) and [550.197](/cfr/30/550.197.md), and marked “Public Information.” You must also submit two copies of the supporting information, as listed in the table in [§ 550.1167](/cfr/30/550.1167.md). You must submit this information:

- (a) Within 45 days after beginning production from the reservoir or discovering that it is sensitive;
- (b) At least once during the calendar year, but you do not need to resubmit unrevised structure maps ([§ 550.1167(a)(2)](/cfr/30/550.1167.md?p=a-2)) or previously submitted well logs ([§ 550.1167(c)(1)](/cfr/30/550.1167.md?p=c-1));
- (c) Within 45 days after you revise reservoir parameters; and
- (d) Within 45 days after the Regional Supervisor classifies the reservoir as sensitive under [§ 550.1154(c)](/cfr/30/550.1154.md?p=c).