---
kind: "section"
citation: "30 C.F.R. § 285.702"
title: "30"
number: "285.702"
heading: "What must I include in my Fabrication and Installation Report?"
url: "https://uscodex.org/cfr/30/285.702"
---

# §285.702. What must I include in my Fabrication and Installation Report?

- (a) Your Fabrication and Installation Report must describe how your facilities will be fabricated and installed in accordance with the design criteria identified in the Facility Design Report; your BOEM-approved SAP, COP, or GAP; and generally accepted industry standards and practices. Your Fabrication and Installation Report must demonstrate how your facilities will be fabricated and installed in a manner that conforms to your responsibilities listed in [§ 285.105(a)](/cfr/30/285.105.md?p=a). You must include the following items in your Fabrication and Installation Report:
- (b) You must submit your FIR to BSEE pursuant to [§ 285.110](/cfr/30/285.110.md).
- (c) You must provide the location of records, as required in [§ 285.714(c)](/cfr/30/285.714.md?p=c).
- (d) If you are required to use a CVA, the FIR must include the following certification statement with accompanying justification: “The fabrication and installation of this structure has been certified by a BSEE-approved CVA to be in accordance with accepted engineering practices, the FDR, and the approved SAP, GAP, or COP, as applicable. The certified design and as-built plans and specifications will be on file at [provide location].”

## Notes

### Amendments

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42716, May 15, 2024]

### Authority

Authority: 43 U.S.C. 1331 et seq.

### Source

Source: 88 FR 6413, Jan. 31, 2023, unless otherwise noted.

### Amendments

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42716, May 15, 2024]
