---
kind: "section"
citation: "30 C.F.R. § 28.30"
title: "30"
number: "28.30"
heading: "Quality control plans; filing requirements."
url: "https://uscodex.org/cfr/30/28.30"
---

# §28.30. Quality control plans; filing requirements.


As a part of each application for approval or modification of approval submitted pursuant to this part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to assure the quality of short-circuit protection provided by the fuse for which approval is sought.


## Notes

### Authority

Authority: 30 U.S.C. 957, 961.

### Source

Source: 37 FR 7562, Apr. 15, 1972, unless otherwise noted.
