# §250.465. When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE?

- (a) You must submit an APM (form BSEE-0124) or an End of Operations Report (form BSEE-0125) and other materials to the Regional Supervisor as shown in the following table. You must also submit a public information copy of each form.
- (b) If you intend to perform any of the actions specified in paragraph (a)(1) of this section, you must meet the following additional requirements:
  - (1) Your APM (Form BSEE-0124) must contain a detailed statement of the proposed work that would materially change from the approved APD. The submission of your APM must be accompanied by payment of the service fee listed in [§ 250.125](/cfr/30/250.125.md);
  - (2) Your form BSEE-0124 must include the present status of the well, depth of all casing strings set to date, well depth, present production zones and productive capability, and all other information specified; and
  - (3) Within 30 days after completing this work, you must submit an End of Operations Report (EOR), Form BSEE-0125, as required under [§ 250.744](/cfr/30/250.744.md).

## Notes

### Amendments

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 26021, Apr. 29, 2016]

### Authority

Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.

### Source

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

### Amendments

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 26021, Apr. 29, 2016]