# §250.190. Reporting requirements for incidents requiring written notification.

- (a) For any incident covered under [§ 250.188](/cfr/30/250.188.md), you must submit a written report within 15 calendar days after the incident to the District Manager. The report must contain the following information:
  - (1) Date and time of occurrence;
  - (2) Operator, and operator representative's name and telephone number;
  - (3) Contractor, and contractor representative's name and telephone number (if a contractor is involved in the incident or injury);
  - (4) Lease number, OCS area, and block;
  - (5) Platform/facility name and number, or pipeline segment number;
  - (6) Type of incident or injury;
  - (7) Operation or activity at time of incident (i.e., drilling, production, workover, completion, pipeline, crane etc.);
  - (8) Description of incident, damage, or injury (including days away from work, restricted work or job transfer), and any corrective action taken; and
  - (9) Property or equipment damage estimate (in U.S. dollars).
- (b) You may submit a report or form prepared for another agency in lieu of the written report required by [paragraph (a)](#a) of this section, provided the report or form contains all required information.
- (c) The District Manager may require you to submit additional information about an incident on a case-by-case basis.