# §58.36. Environmental assessments.


If a project is not exempt or categorically excluded under §§ [58.34](/cfr/24/58.34.md) and [58.35](/cfr/24/58.35.md), the responsible entity must prepare an EA in accordance with [subpart E](/cfr/24/subpartE.md) of this part. If it is evident without preparing an EA that an EIS is required under [§ 58.37](/cfr/24/58.37.md), the responsible entity should proceed directly to an EIS.


## Notes

### Authority

Authority: 12 U.S.C. 1707 note, 1715z-13a(k); 25 U.S.C. 4115 and 4226; 42 U.S.C. 1437x, 3535(d), 3547, 4321-4336e, 4852, 5304(g), 12838, and 12905(h); title II of Pub. L. 105-276; E.O. 11514 as amended by E.O. 11991, 3 CFR, 1977 Comp., p. 123.

### Source

Source: 61 FR 19122, Apr. 30, 1996, unless otherwise noted.