---
kind: "section"
citation: "24 C.F.R. § 58.21"
title: "24"
number: "58.21"
heading: "Time periods."
url: "https://uscodex.org/cfr/24/58.21"
---

# §58.21. Time periods.


All time periods in this part shall be counted in calendar days. The first day of a time period begins at 12:01 a.m. local time on the day following the publication or the mailing and posting date of the notice which initiates the time period.


## Notes

### Authority

Authority: 12 U.S.C. 1707 note, 1715z-13a(k); 25 U.S.C. 4115 and 4226; 42 U.S.C. 1437x, 3535(d), 3547, 4321-4336e, 4852, 5304(g), 12838, and 12905(h); title II of Pub. L. 105-276; E.O. 11514 as amended by E.O. 11991, 3 CFR, 1977 Comp., p. 123.

### Source

Source: 61 FR 19122, Apr. 30, 1996, unless otherwise noted.
