---
kind: "section"
citation: "24 C.F.R. § 3286.9"
title: "24"
number: "3286.9"
heading: "Manufacturer shipment responsibilities."
url: "https://uscodex.org/cfr/24/3286.9"
---

# §3286.9. Manufacturer shipment responsibilities.

- (a) **Providing information to HUD.** At or before the time that each manufactured home is shipped by a manufacturer, the manufacturer must provide HUD, through the Production Inspection Primary Inspection Agency (IPIA), in accordance with [§ 3282.552](/cfr/24/3282.552.md) of this chapter, with information, as applicable, about:
  - (1) The serial number and manufacturer's certification label number of the home;
  - (2) The manufacturer of the home; and
  - (3) **The name and address of the retailer or distributor that has arranged for the home to be shipped.**
- (b) **Manufacturer's installation instructions.** The manufacturer is required to provide with each manufactured home, installation designs and instructions for the installation of the manufactured home that have been approved by a DAPIA. A DAPIA must give approval only if the installation designs and instructions provide equal or greater protection than the protection provided under the installation standards.

## Notes

### Authority

Authority: 42 U.S.C. 3535(d), 5404, and 5424.

### Source

Source: 73 FR 35292, June 20, 2008, unless otherwise noted.
