---
kind: "section"
citation: "24 C.F.R. § 3282.355"
title: "24"
number: "3282.355"
heading: "Submission acceptance."
url: "https://uscodex.org/cfr/24/3282.355"
---

# §3282.355. Submission acceptance.

- (a) A party whose submission is determined by the Department to be adequate shall be granted provisional acceptance until December 15, 1976, or for a six month period from the date of such determination, whichever is later.
- (b) Final acceptance of a party to act as a primary inspection agency will be contingent upon adequate performance during the period of provisional acceptance as determined through monitoring carried out under [subpart J](/cfr/24/subpartJ.md) and upon satisfactory acceptance under [§ 3282.361(e)](/cfr/24/3282.361.md?p=e) or [§ 3282.362(e)](/cfr/24/3282.362.md?p=e). Final acceptance shall be withheld if performance is inadequate.
- (c) Continued acceptance as a primary inspection agency shall be contingent upon continued adequacy of performance as determined through monitoring carried out under subpart J. If the Secretary determines that a primary inspection agency that has been granted final acceptance is performing inadequately, the Secretary shall suspend the acceptance, and the primary inspection agency shall be entitled to a Formal or Informal Presentation of Views as set out in subpart D of this part.

## Notes

### Amendments

[41 FR 19852, May 13, 1976, as amended at 51 FR 34468, Sept. 29, 1986; 61 FR 10861, Mar. 15, 1996]

### Authority

Authority: 15 U.S.C. 2697, 28 U.S.C. 2461 note, 42 U.S.C. 3535(d), 5403, and 5424.

### Source

Source: 41 FR 19852, May 13, 1976, unless otherwise noted.

### Amendments

[41 FR 19852, May 13, 1976, as amended at 51 FR 34468, Sept. 29, 1986; 61 FR 10861, Mar. 15, 1996]
