---
kind: "unit"
title: "18"
title_heading: "Conservation of Power and Water Resources"
key: "chI/subchB/part5"
level: "part"
label: "Part 5"
heading: "Integrated License Application Process"
release: "ecfr-current"
date: "2026-08-27"
url: "https://uscodex.org/cfr/18/chI-subchB-part5"
sections_count: 31
---

# Part 5 — Integrated License Application Process

Title 18 C.F.R. — Conservation of Power and Water Resources › Chapter I — Federal Energy Regulatory Commission, Department of Energy › Subchapter B — Regulations under the Federal Power Act

## Sections

- [§5.1. Applicability, definitions, and requirement to consult.](/cfr/18/5.1.md)
- [§5.2. Document availability.](/cfr/18/5.2.md)
- [§5.3. Process selection.](/cfr/18/5.3.md)
- [§5.4. Acceleration of a license expiration date.](/cfr/18/5.4.md)
- [§5.5. Notification of intent.](/cfr/18/5.5.md)
- [§5.6. Pre-application document.](/cfr/18/5.6.md)
- [§5.7. Tribal consultation.](/cfr/18/5.7.md)
- [§5.8. Notice of commencement of proceeding and scoping document, or of approval to use traditional licensing process or alternative procedures.](/cfr/18/5.8.md)
- [§5.9. Comments and information or study requests.](/cfr/18/5.9.md)
- [§5.10. Scoping Document 2.](/cfr/18/5.10.md)
- [§5.11. Potential Applicant's proposed study plan and study plan meetings.](/cfr/18/5.11.md)
- [§5.12. Comments on proposed study plan.](/cfr/18/5.12.md)
- [§5.13. Revised study plan and study plan determination.](/cfr/18/5.13.md)
- [§5.14. Formal study dispute resolution process.](/cfr/18/5.14.md)
- [§5.15. Conduct of studies.](/cfr/18/5.15.md)
- [§5.16. Preliminary licensing proposal.](/cfr/18/5.16.md)
- [§5.17. Filing of application.](/cfr/18/5.17.md)
- [§5.18. Application content.](/cfr/18/5.18.md)
- [§5.19. Tendering notice and schedule.](/cfr/18/5.19.md)
- [§5.20. Deficient applications.](/cfr/18/5.20.md)
- [§5.21. Additional information.](/cfr/18/5.21.md)
- [§5.22. Notice of acceptance and ready for environmental analysis.](/cfr/18/5.22.md)
- [§5.23. Response to notice.](/cfr/18/5.23.md)
- [§5.24. Applications not requiring a draft NEPA document.](/cfr/18/5.24.md)
- [§5.25. Applications requiring a draft NEPA document.](/cfr/18/5.25.md)
- [§5.26. Section 10(j) process.](/cfr/18/5.26.md)
- [§5.27. Amendment of application.](/cfr/18/5.27.md)
- [§5.28. Competing applications.](/cfr/18/5.28.md)
- [§5.29. Other provisions.](/cfr/18/5.29.md)
- [§5.30. Critical energy infrastructure information.](/cfr/18/5.30.md)
- [§5.31. Transition provision.](/cfr/18/5.31.md)
