---
kind: "range"
citation: "18 C.F.R. §§ 157.5–157.18"
title: "18"
from: "157.5"
to: "157.18"
count: 14
url: "https://uscodex.org/cfr/18/157.5..157.18"
---

# §157.5. Purpose and intent of rules.

- (a) Applications under section 7 of the Natural Gas Act shall set forth all information necessary to advise the Commission fully concerning the operation, sales, service, construction, extension, or acquisition for which a certificate is requested or the abandonment for which permission and approval is requested. Some applications may be of such character that an abbreviated application may be justified under the provisions of [§ 157.7](/cfr/18/157.7.md). Applications for permission and approval to abandon pursuant to section 7(b) of the Act shall conform to [§ 157.18](/cfr/18/157.18.md) and to such other requirements of this part as may be pertinent. However, every applicant shall file all pertinent data and information necessary for a full and complete understanding of the proposed project, including its effect upon applicant's present and future operations and whether, and at what docket, applicant has previously applied for authorization to serve any portion of the market contemplated by the proposed project and the nature and disposition of such other project.
- (b) Every requirement of this part shall be considered as a forthright obligation of the applicant which can only be avoided by a definite and positive showing that the information or data called for by the applicable rules is not necessary for the consideration and ultimate determination of the application.
- (c) This part will be strictly applied to all applications as submitted and the burden of adequate presentation in intelligible form as well as justification for omitted data or information rests with the applicant.

# §157.6. Applications; general requirements.

- (a) **Applicable rules—**
  - (1) **Submission required to be furnished by applicant under this subpart.** Applications, amendments thereto, and all exhibits and other submissions required to be furnished by an applicant to the Commission under this subpart must be submitted in an original and 7 conformed copies. To the extent that data required under this subpart has been provided to the Commission, this data need not be duplicated. The applicant must, however, include a statement identifying the forms and records containing the required information and when that form or record was submitted.
  - (2) **Maps and diagrams.** An applicant required to submit a map or diagram under this subpart must submit one paper copy of the map or diagram. This [paragraph (a)(2)](#a-2) shall cease to have effect on December 5, 2026, unless the Commission determines that the cessation deadline should be extended to a date not more than 5 years in the future after offering the public an opportunity to provide input on the costs and benefits of this [paragraph (a)(2)](#a-2) and considering that input. The Commission will publish a document in the Federal Register announcing its determination and revising or removing this [paragraph (a)(2)](#a-2) accordingly.
  - (3) The following must be submitted in electronic format as prescribed by the Commission:
    - (i) Applications filed under this part 157 and all attached exhibits;
    - (ii) Applications covering acquisitions and all attached exhibits;
    - (iii) Applications for temporary certificates and all attached exhibits;
    - (iv) Applications to abandon facilities or services and all attached exhibits;
    - (v) The progress reports required under § [157.20(c)](/cfr/18/157.20.md?p=c) and [(d)](/cfr/18/157.20.md?p=d);
    - (vi) Applications submitted under subpart E of this part and all attached exhibits;
    - (vii) Applications submitted under subpart F of this part and all attached exhibits;
    - (viii) Requests for authorization under the notice procedures established in [§ 157.205](/cfr/18/157.205.md) and all attached exhibits;
    - (ix) The annual report required by [§ 157.207](/cfr/18/157.207.md);
    - (x) The report required under [§ 157.214](/cfr/18/157.214.md) when storage capacity is increased;
    - (xi) **Amendments to any of the foregoing.**
  - (4) All filings must be signed in compliance with the following.
    - (i) **The signature on a filing constitutes a certification that—** The signer has read the filing signed and knows the contents of the paper copies and electronic filing; the paper copies contain the same information as contained in the electronic filing; the contents as stated in the copies and in the electronic filing are true to the best knowledge and belief of the signer; and the signer possesses full power and authority to sign the filing.
    - (ii) A filing must be signed by one of the following:
      - (A) The person on behalf of whom the filing is made;
      - (B) An officer, agent, or employee of the governmental authority, agency, or instrumentality on behalf of which the filing is made; or,
      - (C) A representative qualified to practice before the Commission under [§ 385.2101](/cfr/18/385.2101.md) of this chapter who possesses authority to sign.
  - (5) **Other requirements.** Applications under section 7 of the Natural Gas Act must conform to the requirements of [§§ 157.5 through 157.14](/cfr/18/157.5..157.14.md). Amendments to or withdrawals of applications must conform to the requirements of §§ [385.215](/cfr/18/385.215.md) and [385.216](/cfr/18/385.216.md) of this chapter. If the application involves an acquisition of facilities, it must conform to the additional requirements prescribed in §§ [157.15](/cfr/18/157.15.md) and [157.16](/cfr/18/157.16.md). If the application involves an abandonment of facilities or service, it must conform to the additional requirements prescribed in [§ 157.18](/cfr/18/157.18.md).
- (b) **General content of application.** Each application filed other than an application for permission and approval to abandon pursuant to [section 7(b)](/cfr/18/7.md?p=b) shall set forth the following information:
  - (1) The exact legal name of applicant; its principal place of business; whether an individual, partnership, corporation, or otherwise; State under the laws of which organized or authorized; and the name, title, and mailing address of the person or persons to whom communications concerning the application are to be addressed.
  - (2) The facts relied upon by applicant to show that the proposed service, sale, operation, construction, extension, or acquisition is or will be required by the present or future public convenience and necessity.
  - (3) **A concise description of applicant's existing operations.**
  - (4) A concise description of the proposed service, sale, operation, construction, extension, or acquisition, including the proposed dates for the beginning and completion of construction, the commencement of operations and of acquisition, where involved.
  - (5) A full statement as to whether any other application to supplement or effectuate applicant's proposals must be or is to be filed by applicant, any of applicant's customers, or any other person, with any other Federal, State, or other regulatory body; and if so, the nature and status of each such application.
  - (6) A table of contents which shall list all exhibits and documents filed in compliance with [§§ 157.5 through 157.18](/cfr/18/157.5..157.18.md), as well as all other documents and exhibits otherwise filed, identifying them by their appropriate titles and alphabetical letter designations. The alphabetical letter designations specified in §§ [157.14](/cfr/18/157.14.md), [157.16](/cfr/18/157.16.md), and [157.18](/cfr/18/157.18.md) must be strictly adhered to and extra exhibits submitted at the volition of applicant shall be designated in sequence under the letter Z (Z1, Z2, Z3, etc.).
  - (7) A form of notice of the application suitable for publication in the Federal Register in accordance with the specifications in [§ 385.203(d)](/cfr/18/385.203.md?p=d) of this chapter. This [paragraph (b)(7)](#b-7) shall cease to have effect on December 5, 2026, unless the Commission determines that the cessation deadline should be extended to a date not more than 5 years in the future after offering the public an opportunity to provide input on the costs and benefits of this [paragraph (b)(7)](#b-7) and considering that input. The Commission will publish a document in the Federal Register announcing its determination and revising or removing this [paragraph (b)(7)](#b-7) accordingly.
  - (8) For applications to construct new facilities, detailed cost-of-service data supporting the cost of the expansion project, a detailed study showing the revenue responsibility for each firm rate schedule under the pipeline's currently effective rate design and under the pipeline's proposed rates, a detailed rate impact analysis by rate schedule (including by zone, if applicable), and an analysis reflecting the impact of the fuel usage resulting from the proposed expansion project (including by zone, if applicable).
- (c) **Requests for shortened procedure.** If shortened procedure is desired a request therefor shall be made in conformity with [§ 385.802](/cfr/18/385.802.md) of this chapter and may be included in the application or filed separately.
- (d) **Landowner notification.**
  - (1) For all applications filed under this subpart which include construction of facilities or abandonment of facilities (except for abandonment by sale or transfer where the easement will continue to be used for transportation of natural gas), the applicant shall make a good faith effort to notify all affected landowners and towns, communities, and local, state and federal governments and agencies involved in the project:
    - (i) By certified or first class mail, sent within 3 business days following the date the Commission issues a notice of the application; or
    - (ii) By hand, within the same time period; and
    - (iii) By publishing notice twice of the filing of the application, no later than 14 days after the date that a docket number is assigned to the application, in a daily or weekly newspaper of general circulation in each county in which the project is located.
  - (2) All affected landowners includes owners of property interests, as noted in the most recent county/city tax records as receiving the tax notice, whose property:
    - (i) Is directly affected (i.e., crossed or used) by the proposed activity, including all facility sites (including compressor stations, well sites, and all above-ground facilities), rights of way, access roads, pipe and contractor yards, and temporary workspace;
    - (ii) Abuts either side of an existing right-of-way or facility site owned in fee by any utility company, or abuts the edge of a proposed facility site or right-of-way which runs along a property line in the area in which the facilities would be constructed, or contains a residence within 50 feet of the proposed construction work area;
    - (iii) Is within one-half mile of proposed compressors or their enclosures or LNG facilities; or
    - (iv) Is within the area of proposed new storage fields or proposed expansions of storage fields, including any applicable buffer zone.
  - (3) The notice shall include:
    - (i) The docket number of the filing;
    - (ii) The most recent edition of the Commission's pamphlet that explains the Commission's certificate process and addresses the basic concerns of landowners. Except: pipelines are not required to include the pamphlet in notifications of abandonments or in the published newspaper notice. Instead, they should provide the title of the pamphlet and indicate its availability at the Commission's Internet address;
    - (iii) A description of the applicant and the proposed project, its location (including a general location map), its purpose, and the timing of the project;
    - (iv) A general description of what the applicant will need from the landowner if the project is approved, and how the landowner may contact the applicant, including a local or toll-free phone number and a name of a specific person to contact who is knowledgeable about the project;
    - (v) A brief summary of what rights the landowner has at the Commission and in proceedings under the eminent domain rules of the relevant state. Except: pipelines are not required to include this information in the published newspaper notice. Instead, the newspaper notice should provide the Commission's Internet address and the telephone number for the Commission's Office of External Affairs; and
    - (vi) Information on how the landowner can get a copy of the application from the company or the location(s) where a copy of the application may be found as specified in [§ 157.10](/cfr/18/157.10.md).
    - (vii) A copy of the Commission's notice of application, specifically stating the date by which timely motions to intervene are due, together with the Commission's information sheet on how to intervene in Commission proceedings. Except: pipelines are not required to include the notice of application and information sheet in the published newspaper notice. Instead, the newspaper notice should indicate that a separate notice is to be mailed to affected landowners and governmental entities.
  - (4) If the notice is returned as undeliverable, the applicant will make a reasonable attempt to find the correct address and notify the landowner.
  - (5) Within 30 days of the date the application was filed, applicant shall file an updated list of affected landowners, including information concerning notices that were returned as undeliverable.
  - (6) If [paragraph (d)(3)](#d-3) of this section requires an applicant to reveal Critical Energy Infrastructure Information (CEII), as defined by [§ 388.113(c)](/cfr/18/388.113.md?p=c) of this chapter, to any person, the applicant shall follow the procedures set out in [§ 157.10(d)](/cfr/18/157.10.md?p=d).

# §157.7. Abbreviated applications.

- (a) **General.** When the operations sales, service, construction, extensions, acquisitions or abandonment proposed by an application do not require all the data and information specified by this part to disclose fully the nature and extent of the proposed undertaking, an abbreviated application may be filed in the manner prescribed in [§ 385.2011](/cfr/18/385.2011.md) of this chapter, provided it contains all information and supporting data necessary to explain fully the proposed project, its economic justification, its effect upon applicant's present and future operations and upon the public proposed to be served, and is otherwise in conformity with the applicable requirements of this part regarding form, manner of presentation, and filing. Such an application shall (1) state that it is an abbreviated application; (2) specify which of the data and information required by this part are omitted; and (3) relate the facts relied upon to justify separately each such omission.

# §157.8. Acceptance for filing or rejection of applications.


Applications will be docketed when received and the applicant so advised.

- (a) If an application patently fails to comply with applicable statutory requirements or with applicable Commission rules, regulations, and orders for which a waiver has not been granted, the Director of the Office of Energy Projects or the Director of the Office of Energy Market Regulation may reject the application within 10 business days of filing as provided by [§ 385.2001(b)](/cfr/18/385.2001.md?p=b) of this chapter. This rejection is without prejudice to an applicant's refiling a complete application. However, an application will not be rejected solely on the basis of:
  - (1) Environmental reports that are incomplete because the company has not been granted access by the affected landowner(s) to perform required surveys; or,
  - (2) Environmental reports that are incomplete, but where the minimum checklist requirements of [part 380](/cfr/18/part380.md), appendix A of this chapter have been met.
- (b) An application which relates to an operation, sale, service, construction, extension, acquisition, or abandonment concerning which a prior application has been filed and rejected, shall be docketed as a new application. Such new application shall state the docket number of the prior rejected application.
- (c) The Director of the Office of Energy Projects or the Director of the Office of Energy Market Regulation may also reject an application after it has been noticed, at any time, if it is determined that such application does not conform to the requirements of this part.

# §157.9. Notice of application and notice of schedule for environmental review.

- (a) Notice of each application filed, except when rejected in accordance with [§ 157.8](/cfr/18/157.8.md), will be issued within 10 business days of filing, and subsequently will be published in the Federal Register and copies of such notice sent to States affected thereby, by electronic means if practical, otherwise by mail. Persons desiring to receive a copy of the notice of every application shall so advise the Secretary.
- (b) For each application that will require an environmental assessment or an environmental impact statement, notice of a schedule for the environmental review will be issued within 90 days of the notice of the application, and subsequently will be published in the Federal Register.

# §157.10. Interventions and protests.

- (a) Notices of applications, as provided by [§ 157.9](/cfr/18/157.9.md), will fix the time within which any person desiring to participate in the proceeding may file a petition to intervene, and within which any interested regulatory agency, as provided by [§ 385.214](/cfr/18/385.214.md) of this chapter, desiring to intervene may file its notice of intervention.
  - (1) Any person filing a petition to intervene or notice of intervention shall state specifically whether he seeks formal hearing on the application.
  - (2) Any person may file to intervene on environmental grounds based on the draft environmental impact statement as stated at [§ 380.10(a)(1)(i)](/cfr/18/380.10.md?p=a-1-i) of this chapter. In accordance with that section, such intervention will be deemed timely as long as it is filed within the comment period for the draft environmental impact statement.
  - (3) Failure to make timely filing will constitute grounds for denial of participation in the absence of extraordinary circumstances or good cause shown.
  - (4) Protests may be filed in accordance with [§ 385.211](/cfr/18/385.211.md) of this chapter within the time permitted by any person who does not seek to participate in the proceeding.
- (b) A copy of each application, supplement and amendment thereto, including exhibits required by §§ [157.14](/cfr/18/157.14.md), [157.16](/cfr/18/157.16.md), and [157.18](/cfr/18/157.18.md), shall upon request be promptly supplied by the applicant to anyone who has filed a petition for leave to intervene or given notice of intervention.
  - (1) An applicant is not required to serve voluminous or difficult to reproduce material, such as copies of certain environmental information, to all parties, as long as such material is publicly available in an accessible central location in each county throughout the project area.
  - (2) An applicant shall make a good faith effort to place the materials in a public location that provides maximum accessibility to the public.
- (c) Complete copies of the application must be available in accessible central locations in each county throughout the project area, either in paper or electronic format, within three business days of the date a filing is issued a docket number. Within five business days of receiving a request for a complete copy from any party, the applicant must serve a full copy of any filing on the requesting party. Such copy may exclude voluminous or difficult to reproduce material that is publicly available. Pipelines must keep all voluminous material on file with the Commission and make such information available for inspection at buildings with public access preferably with evening and weekend business hours, such as libraries located in central locations in each county throughout the project area.
- (d) **Critical Energy Infrastructure Information.**
  - (1) If this section requires an applicant to reveal Critical Energy Infrastructure Information (CEII), as defined in [§ 388.113(c)](/cfr/18/388.113.md?p=c) of this chapter, to the public, the applicant shall omit the CEII from the information made available and insert the following in its place:
    - (i) A statement that CEII is being withheld;
    - (ii) A brief description of the omitted information that does not reveal any CEII; and
    - (iii) **This statement—** “Procedures for obtaining access to Critical Energy Infrastructure Information (CEII) may be found at [18 CFR 388.113](/cfr/18/388.113.md). Requests for access to CEII should be made to the Commission's CEII Coordinator.”
  - (2) The applicant, in determining whether information constitutes CEII, shall treat the information in a manner consistent with any filings that applicant has made with the Commission and shall to the extent practicable adhere to any previous determinations by the Commission or the CEII Coordinator involving the same or like information.
  - (3) The procedures contained in §§ [388.112](/cfr/18/388.112.md) and [388.113](/cfr/18/388.113.md) of this chapter regarding designation of, and access to, CEII, shall apply in the event of a challenge to a CEII designation or a request for access to CEII. If it is determined that information is not CEII or that a requester should be granted access to CEII, the applicant will be directed to make the information available to the requester.
  - (4) Nothing in this section shall be construed to prohibit any persons from voluntarily reaching arrangements or agreements calling for the disclosure of CEII.

# §157.11. Hearings.

- (a) **General.** The Commission will schedule each application for public hearing at the earliest date possible giving due consideration to statutory requirements and other matters pending, with notice thereof as provided by [§ 1.19(b)](/cfr/18/1.19.md?p=b) of this chapter: Provided, however, That when an application is filed less than fifteen days prior to the commencement of a hearing theretofore ordered on a pending application and seeks authority to serve some or all of the markets sought in such pending application or is otherwise competitive with such pending application, the Commission will not schedule the new application for hearing until it has rendered its final decision on such pending application, except when, on its own motion, or on appropriate application, it finds that the public interest requires otherwise.
- (b) **Shortened procedure.** If no protest or petition to intervene raises an issue of substance, the Commission may upon request of the applicant dispose of an application in accordance with the provisions of [§ 385.802](/cfr/18/385.802.md) of this chapter.

# §157.12. Dismissal of application.


Except for good cause shown, failure of an applicant to go forward on the date set for hearing and present its full case in support of its application will constitute ground for the summary dismissal of the application and the termination of the proceedings.


# §157.13. Form of exhibits to be attached to applications.


Each exhibit attached to an application must conform to the following requirements:

- (a) **General requirements.** Each exhibit must be submitted in the manner prescribed in §§ [157.6(a)](/cfr/18/157.6.md?p=a) and [385.2011](/cfr/18/385.2011.md) of this chapter and contain a title page showing applicant's name, docket number (to be left blank), title of the exhibit, the proper letter designation of the exhibit, and, if of 10 or more pages, a table of contents, citing by page, section number or subdivision, the component elements or matters therein contained.
- (b) **Reference to annual reports and previous applications.** An application may refer to annual reports and previous applications filed with the Commission and shall specify the exact pages or exhibit numbers of the filing to which reference is made, including the page numbers in any exhibit to which reference is made. When reference is made to a previous application the docket number shall be stated. No part of a rejected application may be incorporated by reference.
- (c) **Interdependent applications.** When an application considered alone is incomplete and depends vitally upon information in another application, it will not be accepted for filing until the supporting application has been filed. When applications are interdependent, they shall be filed concurrently.
- (d) **Measurement base.** All gas volumes, including gas purchased from producers, shall be stated upon a uniform basis of measurement, and, in addition, if the uniform basis of measurement used in any application is other than 14.73 p.s.i.a., then any volume or volumes delivered to or received from any interstate natural-gas pipeline company shall also be stated upon a basis of 14.73 p.s.i.a.; similarly, total volumes on all summary sheets, as well as grand totals of volumes in any exhibit, shall also be stated upon a basis of 14.73 p.s.i.a. if the uniform basis of measurement used is other than 14.73 p.s.i.a.

# §157.14. Exhibits.

- (a) **To be attached to each application.** All exhibits specified must accompany each application when tendered for filing. Together with each exhibit applicant must provide a full and complete explanation of the data submitted, the manner in which it was obtained, and the reasons for the conclusions derived from the exhibits. If the Commission determines that a formal hearing upon the application is required or that testimony and hearing exhibits should be filed, the Secretary will promptly notify the applicant that submittal of all exhibits and testimony of all witnesses to be sponsored by the applicant in support of his case-in-chief is required. Submittal of these exhibits and testimony must be within 20 days from the date of the Secretary's notice, or any other time as the Secretary will specify. Exhibits, except exhibits F, F- 1, G, G-I, and G-II, must be submitted to the Commission on electronic media as prescribed in [§ 385.2011](/cfr/18/385.2011.md) of this chapter. Receipt and delivery point information required in various exhibits must be labeled with a location point name and code in conformity with the location name and code the pipeline has adopted in conformance with [§ 284.13(f)](/cfr/18/284.13.md?p=f) of this chapter. Intervenors and persons becoming intervenors after the date of the Secretary's notice must be advised by the applicant of the afore-specified exhibits and testimony, and must be furnished with copies upon request. If this section requires an applicant to reveal Critical Energy Infrastructure Information (CEII), as defined by [§ 388.113(c)](/cfr/18/388.113.md?p=c) of this chapter, to any person, the applicant shall follow the procedures set out in [§ 157.10(d)](/cfr/18/157.10.md?p=d).
  - (1) **Exhibit A—Articles of incorporation and bylaws.** If applicant is not an individual, a conformed copy of its articles of incorporation and bylaws, or other similar documents.
  - (2) **Exhibit B—State authorization.** For each State where applicant is authorized to do business, a statement showing the date of authorization, the scope of the business applicant is authorized to carry on and all limitations, if any, including expiration dates and renewal obligations. A conformed copy of applicant's authorization to do business in each State affected shall be supplied upon request.
  - (3) **Exhibit C—Company officials.** A list of the names and business addresses of applicant's officers and directors, or similar officials if applicant is not a corporation.
  - (4) **Exhibit D—Subsidiaries and affiliation.** If applicant or any of its officers or directors, directly or indirectly, owns, controls, or holds with power to vote, 10 percent or more of the outstanding voting securities of any other person or organized group of persons engaged in production, transportation, distribution, or sale of natural gas, or of any person or organized group of persons engaged in the construction or financing of such enterprises or operations, a detailed explanation of each such relationship, including the percentage of voting strength represented by such ownership of securities. If any person or organized group of persons, directly or indirectly, owns, controls, or holds with power to vote, 10 percent or more of the outstanding voting securities of applicant—a detailed explanation of each such relationship.
  - (5) **Exhibit E—Other pending applications and filings.** A list of other applications and filings under sections 1, 3, 4 and 7 of the Natural Gas Act filed by the applicant which are pending before the Commission at the time of the filing of an application and which directly and significantly affect the application filed, including an explanation of any material effect the grant or denial of those other applications and filings will have on the application and of any material effect the grant or denial of the application will have on those other applications and filings.
  - (6) **Exhibit F—Location of facilities.** Unless shown on Exhibit G or elsewhere, a geographical map of suitable scale and detail showing, and appropriately differentiating between all of the facilities proposed to be constructed, acquired or abandoned and existing facilities of applicant, the operation or capacity of which will be directly affected by the proposed facilities or the facilities proposed to be abandoned. This map, or an additional map, shall clearly show the relationship of the new facilities to the applicant's overall system and shall include:
    - (i) **Location, length, and size of pipelines.**
    - (ii) **Location and size (rated horsepower) of compressor stations.**
    - (iii) **Location and designation of each point of connection of existing and proposed facilities with—**
      - (A) Main-line industrial customers, gas pipeline or distribution systems, showing towns and communities served and to be served at wholesale and retail, and
      - (B) **Gas-producing and storage fields, or other sources of gas supply.**
  - (7) **Exhibit F-I—Environmental report.** An environmental report as specified in §§ [380.3](/cfr/18/380.3.md) and [380.12](/cfr/18/380.12.md) of this chapter. Applicant must submit all appropriate revisions to Exhibit F-I whenever route or site changes are filed. These revisions should identify the locations by mile post and describe all other specific differences resulting from the route or site changes, and should not simply provide revised totals for the resources affected.
  - (8) **Exhibit G—Flow diagrams showing daily design capacity and reflecting operation with and without proposed facilities added.** A flow diagram showing daily design capacity and reflecting operating conditions with only existing facilities in operation. A second flow diagram showing daily design capacity and reflecting operating conditions with both proposed and existing facilities in operation. Both flow diagrams shall include the following for the portion of the system affected:
    - (i) Diameter, wall thickness, and length of pipe installed and proposed to be installed and the diameter and wall thickness of the installed pipe to which connection is proposed.
    - (ii) For each proposed new compressor station and existing station, the size, type and number of compressor units, horsepower required, horsepower installed and proposed to be installed, volume of gas to be used as fuel, suction and discharge pressures, and compression ratio.
    - (iii) **Pressures and volumes of gas at the main line inlet and outlet connections at each compressor station.**
    - (iv) Pressures and volumes of gas at each intake and take-off point and at the beginning and terminus of the existing and proposed facilities and at the intake or take-off point of the existing facilities to which the proposed facilities are to be connected.
  - (9) **Exhibit G-I—Flow diagrams reflecting maximum capabilities.** If Exhibit G does not reflect the maximum deliveries which applicant's existing and proposed facilities would be capable of achieving under most favorable operating conditions with utilization of all facilities, include an additional diagram or diagrams to depict such maximum capabilities. If the horsepower, pipelines, or other facilities on the segment of applicant's system under consideration are not being fully utilized due, e.g., to capacity limitation of connecting facilities or because of the need for standby or spare equipment, the reason for such nonutilization shall be stated.
  - (10) **Exhibit G-II—Flow diagram data.** Exhibits G and G-I shall be accompanied by a statement of engineering design data in explanation and support of the diagrams and the proposed project, setting forth:
    - (i) Assumptions, bases, formulae, and methods used in the development and preparation of such diagrams and accompanying data.
    - (ii) A description of the pipe and fittings to be installed, specifying the diameter, wall thickness, yield point, ultimate tensile strength, method of fabrication, and methods of testing proposed.
    - (iii) **When lines are looped, the length and size of the pipe in each loop.**
    - (iv) Type, capacity, and location of each natural gas storage field or facility, and of each dehydration, desulphurization, natural gas liquefaction, hydrocarbon extraction, or other similar plant or facility directly attached to the applicant's system, indicating which of such plants are owned or operated by applicant, and which by others, giving their names and addresses.
    - (v) If the daily design capacity shown in Exhibit G is predicated upon an ability to meet each customer's maximum contract quantity on the same day, explain the reason for such coincidental peak-day design. If the design day capacity shown in Exhibit G is predicated upon an assumed diversity factor, state that factor and explain its derivation.
    - (vi) The maximum allowable operating pressure of each proposed facility for which a certificate is requested, as permitted by the Department of Transportation's safety standards. The applicant shall certify that it will design, install, inspect, test, construct, operate, replace, and maintain the facilities for which a certificate is requested in accordance with Federal safety standards and plans for maintenance and inspection or shall certify that it has been granted a waiver of the requirements of the safety standards by the Department of Transportation in accordance with the provisions of section 3(e) of the Natural Gas Pipeline Safety Act of 1968. Pertinent details concerning the waiver shall be set forth.
  - (11) **Exhibit H—Total gas supply data.** A statement by applicant describing:
    - (i) Those production areas accessible to the proposed construction that contain sufficient existing or potential gas supplies for the proposed project; and
    - (ii) **How those production areas are connected to the proposed construction.**
    - (iii) This [paragraph (a)(11)](#a-11) shall cease to have effect on December 5, 2026, unless the Commission determines that the cessation deadline should be extended to a date not more than 5 years in the future after offering the public an opportunity to provide input on the costs and benefits of this [paragraph (a)(11)](#a-11) and considering that input. The Commission will publish a document in the Federal Register announcing its determination and revising or removing this [paragraph (a)(11)](#a-11) accordingly.
  - (12) **Exhibit I—Market data.** A system-wide estimate of the volumes of gas to be delivered during each of the first 3 full years of operation of the proposed service, sale, or facilities and during the years when the proposed facilities are under construction, and actual data of like import for each of the 3 years next preceding the filing of the application, together with:
    - (i) Names and locations of customer companies and municipalities, showing the number of residential, commercial, firm industrial, interruptible industrial, residential space-heating, commercial space-heating, and other types of customers for each distribution system to be served at retail or wholesale; and the names and locations of each firm and interruptible direct industrial customer whose estimated consumption totals 10,000 Mcf or more in any calendar month or 100,000 Mcf or more per year together with an explanation of the end use to which each of these industrial customers will put the gas.
    - (ii) Applicant's total annual and peak day gas requirements by classification of service in [paragraph (a)(11)(i)](#a-11-i) of this section, divided as follows: Gas requirements for each distribution area where gas is sold by applicant at retail; for each wholesale customer; for all main line direct industrial customers; and company use and unaccounted-for gas, for both the applicant and each wholesale customer.
    - (iii) Total past and expected curtailments of service by the applicant and each wholesale customer proposing to receive new or additional supplies of gas from the project, all to be listed by the classifications of service in [paragraph (a)(12)(i)](#a-12-i) of this section.
    - (iv) Explanation and derivation of basic factors used in estimating future requirements, including, for example: Peak-day and annual degree-day deficiencies, annual load factors of applicant's system and of its deliveries to its proposed customers; individual consumer peak-day and annual consumption factors for each class of consumers, with supporting historical data; forecasted saturation of space-heating as related to past experience; and full detail as to all other sources of gas supply available to applicant and to each of its customers, including manufacturing facilities and liquid petroleum gas.
    - (v) Conformed copy of each contract, letter of intent or other agreement for sale or transportation of natural gas proposed by the application. Indicate the rate to be charged. If no agreements have been made, indicate the basis for assuming that contracts will be consummated and that service will be rendered under the terms contemplated in the application.
    - (vi) A full description of all facilities, other than those covered by the application, necessary to provide service in the communities to be served, the estimated cost of such facilities, by whom they are to be constructed, and evidence of economic feasibility.
    - (vii) A copy of each market survey made within the past three years for such markets as are to receive new or increased service from the project applied for.
    - (viii) A statement showing the franchise rights of applicant or other person to distribute gas in each community in which service is proposed.
    - (ix) When an application requires a statement of total peak-day or annual market requirements of affiliates, whose operations are integrated with those of applicant, to demonstrate applicant's ability to provide the service proposed or to establish a gas supply, estimates and data required by this [paragraph (a)(12)(ix)](#a-12-ix) shall also be stated in like detail for such affiliates.
    - (x) When the proposed project is for service which would not decrease the life index of the total system gas supply by more than one year, the data required in [paragraphs (a)(12)(i) to (ix)](#a-12-i..a-12-ix), inclusive, of this section need be submitted only as to the particular market to receive new or additional service.
  - (13) **Exhibit J—Federal authorizations.** A statement identifying each Federal authorization that the proposal will require; the Federal agency or officer, or State agency or officer acting pursuant to delegated Federal authority, that will issue each required authorization; the date each request for authorization was submitted; why any request was not submitted and the date submission is expected; and the date by which final action on each Federal authorization has been requested or is expected.
  - (14) **Exhibit K—Cost of facilities.** A detailed estimate of total capital cost of the proposed facilities for which application is made, showing cost of construction by operating units such as compressor stations, main pipelines, laterals, measuring and regulating stations, and separately stating the cost of right-of-way, damages, surveys, materials, labor, engineering and inspection, administrative overhead, fees for legal and other services, allowance for funds used during construction, and contingencies. Include a brief statement indicating the source of information used as the basis for the above estimate. If not otherwise set forth, submit data on preliminary bids, if any, for the proposed facilities and recent experienced cost data for facilities of similar character.
  - (15) **Exhibit L—Financing.** Plans for financing the proposed facilities for which the application is filed, together with:
    - (i) A description of the class (e.g., commercial paper, long-term debt, preferred stock) and cost rates for securities expected to be issued with construction period and post- operational sources of financing separately identified.
    - (ii) Statement of anticipated cash flow, including provision during the period of construction and the first 3 full years of operation of proposed facilities for interest requirements, dividends, and capital requirements.
    - (iii) **A balance sheet and income statement (12 months) of most recent data available.**
    - (iv) Comparative pro forma balance sheets and income statements for the period of construction and each of the first 3 full years of operation, giving effect to the proposed construction and proposed financing of the project.
    - (v) Any additional data and information upon which applicant proposes to rely in showing the adequacy and availability of resources for financing its proposed project.
    - (vi) In instances for which principal operations of the company have not commenced or where proposed rates for services are developed on an incremental basis, a brief statement explaining how the applicant will determine the actual allowance for funds used during construction (AFUDC) rate, or if a rate is not to be used, how the applicant will determine the actual amount of AFUDC to be capitalized as a component of construction cost, and why the method is appropriate under the circumstances.
  - (16) **Exhibit M—Construction, operation, and management.** A concise statement setting forth arrangements for supervision, management, engineering, accounting, legal, or other similar service to be rendered in connection with the construction or operation of the project, if not to be performed by employees of applicant, including reference to any existing or contemplated agreements therefor, together with:
    - (i) **A statement showing affiliation between applicant and any parties to such agreements or arrangements.** See Exhibit D, [paragraph (a)(4)](#a-4) of this section.
    - (ii) Conformed copies of all construction, engineering, management, and other similar service agreements or contracts in any way operative with respect to construction, operation, or financing of facilities which are the subject of the application or will be applicable under system operations.
  - (17) **Exhibit N—Revenues—Expenses—Income.** When the estimated revenues and expenses related to a proposed facility will significantly affect the operating revenues or operating expenses of an applicant, there shall be submitted a system-wide statement for the last year preceding the proposed construction or service and pro forma system-wide and incremental statements for each of the first three full years of operation of the proposed facilities, showing:
    - (i) Gas system annual revenues and volumes of natural gas related thereto, subdivided by classes of service, and further subdivided by sales to direct industrial customers, sales to other gas utilities, and other sales, indicating billing quantities used for computing charges, e.g., actual demands, billing demands, volumes, heat-content adjustment or other determinants. In addition, if enlargement or extension of facilities is involved, the revenues attributable solely to the proposed facilities shall be stated separately, and the basis and data used in such computation shall be clearly shown.
    - (ii) Gas system annual operating expenses classified in accordance with the Commission's Uniform System of Accounts for Natural Gas Companies; the annual depreciation, depletion, taxes, utility income, and resulting rate of return on net investment in gas plant including working capital. In addition if enlargement or extension of facilities is involved, the cost of service attributable solely to the proposed facilities shall be stated separately with supporting data.
    - (iii) When the data required in paragraphs [(a)(17)(i)](#a-17-i) and [(ii)](#a-17-ii) of this section is not submitted, applicant shall provide in lieu thereof a statement in sufficient detail to show clearly the effect on the operating revenues and operating expenses of the estimated revenues and expenses related to the proposed facility.
  - (18) **Exhibit O—Depreciation and depletion.** Depreciation and depletion rates to be established, the method of determination and the justification therefor.
  - (19) **Exhibit P—Tariff.**
    - (i) **A statement of the rates to be charged for the proposed sales or service, including—**
      - (A) Identification of the applicable presently effective rate schedules, when no additional tariff filings will be required, or
      - (B) When changes are required in applicant's presently effective tariff, or if applicant has no tariff, pro forma copies of appropriate changes in or additions to the effective tariff or a pro forma copy of the new gas tariff proposed, or
      - (C) **When a new rate is proposed, a statement explaining the basis used in arriving at the proposed rate.** Such statement shall clearly show whether such rate results from negotiation, cost-of-service determination, competitive factors or others, and shall give the nature of any studies which have been made in connection therewith.
    - (ii) When new rates or changes in present rates are proposed or when the proposed facilities will result in a material change in applicant's average cost of service, such statement shall be accompanied by supporting data showing:
      - (A) System cost of service for the first calendar year of operation after the proposed facilities are placed in service.
      - (B) An allocation of such costs to each particular service classification, with the basis for each allocation clearly stated.
      - (C) **The proposed rate base and rate of return.**
      - (D) **Gas operating expenses, segregated functionally by accounts.**
      - (E) **Depletion and depreciation.**
      - (F) **Taxes with the basis upon which computed.**
- (b) **Additional exhibits.** Applicant shall submit additional exhibits necessary to support or clarify its application. Such exhibits shall be identified and designated as provided by [§ 157.6(b)(6)](/cfr/18/157.6.md?p=b-6).
- (c) **Additional information.** Upon request by the Secretary, prior to or during hearing upon the application, applicant shall submit such additional data, information, exhibits, or other detail as may be specified. An original and 7 conformed copies of such additional information shall be furnished to the Commission. The Commission reserves the right to request additional copies.
- (d) **Availability of Commission staff for advice prior to formal filing.** Prior to filing an application, any person may informally confer with the staff of the Commission to obtain advice on any problem of statement or presentation of an application or any part thereof.

# §157.15. Requirements for applications covering acquisitions.


An application for a certificate authorizing acquisition of facilities, in addition to complying with the applicable provisions of [§§ 157.5 through 157.14](/cfr/18/157.5..157.14.md), shall include a statement showing:

- (a) The exact legal name of the vendor, lessor, or other party in interest (hereinafter referred to as “vendor”) the State or other laws under which vendor was organized, location of vendor's principal place of business, and a description of the business, operation or property of vendor covered by the application.
- (b) Any certificate from the Commission, held by vendor, relating directly to the facilities which applicant seeks to acquire, citing the order, date thereof, docket designation, and title of the proceeding; reference to and designation of any companion applications by vendor for permission and approval pursuant to [section 7(b)](/cfr/18/7.md?p=b) of the Natural Gas Act.
- (c) The manner in which the facilities are to be acquired, the consideration to be paid, the method of arriving at the amount thereof, and anticipated expenses in addition to the consideration.
- (d) The facilities to be acquired, their present use, their proposed use after acquisition, and whether they constitute all of vendor's facilities.
- (e) Any franchise, license, or permit respecting the facilities involved, showing expiration date thereof, and the effect of the proposed acquisition thereon.

# §157.16. Exhibits relating to acquisitions.


In addition to the exhibits required by [§ 157.14](/cfr/18/157.14.md), every application involving acquisition of facilities must be accompanied by the exhibits listed below. Together with each exhibit applicant must provide a full and complete explanation of the data submitted, the manner in which it was obtained, and the reasons for the conclusions derived from the exhibits, unless the applicant includes a statement identifying the schedule and rate containing the required information and data filed as prescribed in [§ 385.2011](/cfr/18/385.2011.md) of this chapter. If the Commission determines that a formal hearing upon the application is required or that testimony and hearing exhibits should be filed, the Secretary will promptly notify the applicant that submittal of all the exhibits and testimony of all witnesses to be sponsored by the applicant in support of his case-in-chief is required. Submittal of these exhibits and testimony must be within 20 days from the date of the Secretary's notice, or any other time specified by the Secretary in the notice. Sections [157.6(a)](/cfr/18/157.6.md?p=a) and [385.2011](/cfr/18/385.2011.md) of this chapter will govern the submissions required to be furnished to the Commission. Interveners and persons becoming interveners after the date of the Secretary's notice must be advised by the applicant of the afore-specified exhibits and testimony, and must be furnished with copies upon request. If this section requires an applicant to reveal Critical Energy Infrastructure Information (CEII), as defined by [§ 388.113(c)](/cfr/18/388.113.md?p=c) of this chapter, to any person, the applicant shall follow the procedures set out in [§ 157.10(d)](/cfr/18/157.10.md?p=d).

- (a) **Exhibit Q—Effect of acquisition on existing contracts and tariffs.** A statement showing the effect of the proposed transaction upon any agreements for the purchase, sale, or interchange of natural gas, and upon any rate schedules or tariffs on file with this Commission, together with pro forma rate schedule sheets, notices of cancellation, or other tariff filings required to be made with this Commission.
- (b) **Exhibit R—Acquisition contracts.** A summary statement of all contracts, agreements or undertakings relating to the proposed acquisition, including:
  - (1) A conformed copy of each contract or other agreement covering or relating to the acquisition of the facilities.
  - (2) The names and addresses of all persons employed or to be employed concerning the transaction, including engineering, financial accounting, legal, or other services, and the compensation, fees, or other payments, paid or payable, to such persons.
  - (3) A disclosure of affiliation between applicant and vendor or between either of them and any other party in interest in the proposed acquisition. See Exhibit D, [§ 157.14(a)(4)](/cfr/18/157.14.md?p=a-4).
- (c) **Exhibit S—Accounting.** A statement showing:
  - (1) The amounts recorded upon the books of the vendor, as being applicable to the facilities to be acquired, and the related depreciation, depletion, and amortization reserves. Include a brief statement explaining the basis or methods used to derive the related depreciation, depletion and amortization reserves.
  - (2) The original cost of the facilities to be acquired, segregated by accounts prescribed in the Commission's Uniform System of Accounts for Natural Gas Companies; the method by which the original cost was determined; and whether such statement of original cost has been approved by any regulatory body.
  - (3) If the original cost has not been determined, an estimate thereof, based upon records or data of vendor or its predecessors, together with an explanation of the manner in which such estimate was made and the name and address of the present custodian of all existing pertinent records and data.
  - (4) The depreciation, depletion, and amortization reserve requirements applicable to the original cost of the facilities to be acquired, estimated service lives, the approximate average age of the facilities to which the depreciation reserve applies, the amortization period, and the depletion rates and estimated gas reserves upon which accruals to the depletion reserve are based.
  - (5) The amount at which applicant proposes to record the facilities upon its books; the amount of the original cost to be recorded, the depreciation, depletion, and amortization reserves; and the acquisition adjustments, if any, together with applicant's proposed disposition of all adjustments.
  - (6) Duplicate facilities to be acquired and retired, property which must be extensively rehabilitated, including a clear description of such property, the additional costs to be incurred, and the accounting therefor proposed.
  - (7) A balance sheet of the company to be acquired as of the most recent date available, if the acquisition involved is by purchase of capital stock and liquidation of the acquired company.
  - (8) A pro forma consolidating balance sheet, as of the date of the merger if the acquisition is by merger, showing the merging of the accounts and the adjustments relating thereto.

# §157.17. Applications for temporary certificates in cases of emergency.


In cases of emergency and pending the determination of any application on file with the Commission for a certificate of public convenience and necessity pursuant to section 7 of the Natural Gas Act, application may be made for a temporary certificate authorizing the construction and operation of extensions of existing facilities, interconnections of pipeline systems, or sales of natural gas that may be required to assure maintenance of adequate service, or to service particular customers. This application must be submitted in the manner prescribed in §§ [157.6(a)](/cfr/18/157.6.md?p=a) and [385.2011](/cfr/18/385.2011.md) of this chapter.

- (a) Whenever the waiver provisions of [§ 385.2011](/cfr/18/385.2011.md) of this chapter apply, the application must be submitted in writing, must be subscribed and verified by a responsible officer of applicant having knowledge of the facts, and must state clearly and specifically the exact character of the emergency, the proposed method of meeting it, and the facts claimed to warrant issuance of a temporary certificate.
- (b) The application must be submitted on electronic media as prescribed in [§ 385.2011](/cfr/18/385.2011.md) of this chapter, must be subscribed and verified by a responsible officer of applicant having knowledge of the facts, and must state clearly and specifically the exact character of the emergency, the proposed method of meeting it, and the facts claimed to warrant issuance of a temporary certificate.

# §157.18. Applications to abandon facilities or service; exhibits.


Applications for an order authorizing abandonment of facilities or service pursuant to section 7(b) of the Natural Gas Act must contain a statement providing in detail the reasons for the abandonment and must contain the exhibits listed below, unless the applicant includes a statement identifying the schedule and rate containing the required information and data filed as prescribed in [§ 385.2011](/cfr/18/385.2011.md) of this chapter. Any application for an abandonment that is not excluded by § [380.4(a)(28)](/cfr/18/380.4.md?p=a-28) or [(29)](/cfr/18/380.4.md?p=a-29), must include an environmental report as specified by [§ 380.3(c)(2)](/cfr/18/380.3.md?p=c-2). Sections [157.6(a)](/cfr/18/157.6.md?p=a) and [385.2011](/cfr/18/385.2011.md) of this chapter will govern the submission of applications and exhibits required to be furnished. Together with each exhibit, applicant must provide a full and complete explanation of the data submitted, the manner in which it was obtained, and the reasons for the conclusions derived from the data. The Secretary may, in addition, require that the testimony of all witnesses to be presented by the applicant be filed together with all exhibits upon which applicant will base its case-in-chief.

- (a) **Exhibit T—Related applications.** A statement showing:
  - (1) The docket numbers of the prior proceedings in which the facilities or services sought to be abandoned were certificated.
  - (2) The docket numbers of related applications pending before or which have been authorized by the Commission with an explanation of the interrelationship of those applications with the instant application.
- (b) **Exhibit U—Contracts and other agreements.** A conformed copy of each contract or other agreement pertaining directly or indirectly to the abandonment of facilities or service, including all agreements which influenced applicant to seek the abandonment and all agreements which are dependent upon the approval of the proposed abandonment.
- (c) **Exhibit V—** Flow diagram showing daily design capacity and reflecting operation of applicant's system after abandonment. Receipt and delivery point information required in various exhibits must be labeled with a location point name and code in accordance with the location name and code the pipeline has adopted in conformance with [§ 284.13(f)](/cfr/18/284.13.md?p=f) of this chapter. A flow diagram showing daily design capacity and reflecting operating conditions of applicant's system after abandonment of facilities on that segment of the system affected by the abandonment, including the following:
  - (1) **Diameter, wall thickness, and length of pipe remaining.**
  - (2) For each remaining compressor station, the size, type and number of compressor units, horsepower required, horsepower installed, volume of gas to be used as fuel, suction and discharge pressures, and compression ratio.
  - (3) **Pressures and volumes of gas at the main line inlet and outlet connections at each compressor station.**
  - (4) Pressures and volumes of gas at each intake and takeoff point and at the beginning and terminus of all remaining facilities.
- (d) **Exhibit W—Impact on customers whose service will be terminated.** A statement indicating the availability of natural gas from other sources to applicant's customers whose service will be terminated by the abandonment and a statement showing the economic effect of the abandonment on applicant's customers. If no other natural gas is available, indicate the availability of other fuels to those customers and explain why the abandonment of service to each customer is permitted by the public convenience and necessity.
- (e) **Exhibit X—Effect of the abandonment on existing tariffs.** A statement showing the effect of the proposed abandonment upon any rate schedules or tariffs on file with this Commission, together with pro forma rate schedule sheets, notices of cancellation, or other tariff filings required to be made with this Commission.
- (f) **Exhibit Y—Accounting treatment of abandonment.** Concisely describe the changes of property, indicating the cost of property to be abandoned in place, the cost of property to be removed and salvaged, the proposed disposition of salvaged material, and a description of equipment to be relocated setting forth its cost, its proposed new location, and the extent of rehabilitation required. Include the information required below.
  - (1) State the proposed accounting treatment for property changes, showing, for example, retirements by primary plant accounts, cost of removal, salvage realized for materials and equipment sold, original cost of reusable materials and equipment recovered (see Account 154 of the Uniform System of Accounts), and maintenance costs for reconditioning of reusable materials and equipment.
  - (2) If the abandonment will be by sale of property, describe the property to be sold, together with the proposed accounting treatment as required by paragraph F of Gas Plant Instruction 5 of the Uniform System of Accounts. Include a brief statement explaining the basis or methods used to derive the accumulated depreciation related to the property to be disposed of. Applicant may use pro forma accounting entries based on estimated amounts, provided that upon consummation of the sale he must file proposed accounting entries in conformity with the requirements of the Uniform System of Accounts. If the proposed sale will result in a taxable gain to the applicant, indicate the amount of federal and state income taxes to be allocated to the gain. If no allocation is to be made, explain the reasons.
  - (3) State the amount of accumulated deferred income taxes attributable to the property to be abandoned and the tax basis of the property. Indicate the proposed accounting treatment of those accumulated deferred taxes.
- (g) **Exhibit Z—Location of facilities.** Unless shown on Exhibit V or elsewhere, a geographic map of suitable scale and detail showing, and appropriately differentiating between, all of the facilities proposed to be abandoned and the other existing facilities of applicant, the operation or capacity of which will be directly affected by the facilities to be abandoned. This map shall clearly show the relationship of the facilities to be abandoned to the applicant's overall system and shall include:
  - (1) **Location, length and size of pipelines.**
  - (2) **Location and size (rated horsepower) of compressor stations.**
  - (3) Location and designation of each point of connection of existing facilities with (i) main line industrial and other consumers, pipeline or distribution companies and municipalities, indicating towns and communities served at wholesale or retail and (ii) gas-producing and storage fields, or other sources of gas supply. Designate on the map those facilities and services proposed to be abandoned.

