---
kind: "section"
citation: "18 C.F.R. § 1304.301"
title: "18"
number: "1304.301"
heading: "Utilities."
url: "https://uscodex.org/cfr/18/1304.301"
---

# §1304.301. Utilities.


Upon application to and approval by TVA, utility lines (electric, water-intake lines, etc.) may be placed within the flowage easement area as follows:

- (a) Power lines, poles, electrical panels, and wiring shall be installed:
  - (1) In a way that would not be hazardous to the public or interfere with TVA operations; and
  - (2) In compliance with all State and local electrical codes (satisfactory evidence of compliance to be provided to TVA upon request).
- (b) Electrical service shall be installed with an electrical disconnect that is located above the 500-year floodplain or the flood risk profile, whichever is higher, and is accessible during flood events.
- (c) TVA's issuance of a permit does not mean that TVA has determined the facilities are safe for any purpose or that TVA has any duty to make such a determination.

## Notes

### Authority

Authority: 16 U.S.C. 831-831ee.

### Source

Source: 68 FR 46936, Aug. 7, 2003, unless otherwise noted.
