---
kind: "section"
citation: "14 C.F.R. § 5.55"
title: "14"
number: "5.55"
heading: "Safety risk assessment and control."
url: "https://uscodex.org/cfr/14/5.55"
---

# §5.55. Safety risk assessment and control.


Any person required to have an SMS under this part must:

- (a) Develop and maintain processes to analyze safety risk associated with the hazards identified in [§ 5.53(c)](/cfr/14/5.53.md?p=c).
- (b) Define a process for conducting risk assessment that allows for the determination of acceptable safety risk.
- (c) Develop and maintain processes to develop safety risk controls that are necessary as a result of the safety risk assessment process under [paragraph (b)](#b) of this section.
- (d) Evaluate whether the risk will be acceptable with the proposed safety risk control applied before the safety risk control is implemented.

## Notes

### Amendments

[Doc. No. FAA-2021-0419, Amdt. 5-2, 89 FR 33107, Apr. 26, 2024]

### Authority

Authority: 49 U.S.C. 106(f), 106(g), 40101, 40113, 40119, 41706, 44101, 44701-44702, 44705, 44709-44711, 44713, 44716-44717, 44722, 46105; Sec. 102, Pub. L. 116-260, 134 Stat. 2309; Sec 215, Pub. L. 111-216, 124 Stat. 2366.

### Source

Source: Doc. No. FAA-2009-0671, Amdt. 5-1, 80 FR 1326, Jan. 8, 2015, unless otherwise noted.

### Amendments

[Doc. No. FAA-2021-0419, Amdt. 5-2, 89 FR 33107, Apr. 26, 2024]
