---
kind: "section"
citation: "14 C.F.R. § 217.6"
title: "14"
number: "217.6"
heading: "Extension of filing time."
url: "https://uscodex.org/cfr/14/217.6"
---

# §217.6. Extension of filing time.

- (a) If circumstances prevent the filing of a Schedule T-100(f) report on or before the due date prescribed in [section 22](/cfr/14/22.md) of [part 241](/cfr/14/part241.md) of this chapter and appendix A of this part, a request for an extension must be filed with the Director, Office of Airline Information.
- (b) The extension request must be received at the address provided in [§ 217.10](/cfr/14/217.10.md) at least 3 days in advance of the due date, and must set forth reasons to justify granting an extension, and the date when the report can be filed. If a request is denied, the air carrier must submit the required report within 5 days of its receipt of the denial of extension.

## Notes

### Amendments

[53 FR 46294, Nov. 16, 1988, as amended at 60 FR 66722, Dec. 26, 1995; Doc. No. DOT-OST-2014-0140, 84 FR 15926, Apr. 16, 2019]

### Authority

Authority: 49 U.S.C. 329, 41102, 41301, 41708, and 41709.

### Source

Source: 53 FR 46294, Nov. 16, 1988, unless otherwise noted.

### Amendments

[53 FR 46294, Nov. 16, 1988, as amended at 60 FR 66722, Dec. 26, 1995; Doc. No. DOT-OST-2014-0140, 84 FR 15926, Apr. 16, 2019]
