---
kind: "section"
citation: "14 C.F.R. § 145.206"
title: "14"
number: "145.206"
heading: "Notification of hazardous materials authorizations."
url: "https://uscodex.org/cfr/14/145.206"
---

# §145.206. Notification of hazardous materials authorizations.

- (a) Each repair station must acknowledge receipt of the [part 121](/cfr/14/part121.md) or [part 135](/cfr/14/part135.md) operator notification required under §§ [121.1005(e)](/cfr/14/121.1005.md?p=e) and [135.505(e)](/cfr/14/135.505.md?p=e) of this chapter prior to performing work for, or on behalf of that certificate holder.
- (b) Prior to performing work for or on behalf of a [part 121](/cfr/14/part121.md) or [part 135](/cfr/14/part135.md) operator, each repair station must notify its employees, contractors, or subcontractors that handle or replace aircraft components or other items regulated by 49 CFR parts [171](/cfr/49/part171.md) through [180](/cfr/49/part180.md) of each certificate holder's operations specifications authorization permitting, or prohibition against, carrying hazardous materials. This notification must be provided subsequent to the notification by the [part 121](/cfr/14/part121.md) or [part 135](/cfr/14/part135.md) operator of such operations specifications authorization/designation.

## Notes

### Amendments

[Docket FAA-2003-15085, 70 FR 58831, Oct. 7, 2005, as amended by Amdt. 145-25, 70 FR 75397, Dec. 20, 2005]

### Source

Source: Docket FAA-1999-5836, 66 FR 41117, Aug. 6, 2001, unless otherwise noted.

### Authority

Authority: 49 U.S.C. 106(f), 40113, 44701-44702, 44707, 44709, 44717.

### Amendments

[Docket FAA-2003-15085, 70 FR 58831, Oct. 7, 2005, as amended by Amdt. 145-25, 70 FR 75397, Dec. 20, 2005]
