---
kind: "section"
citation: "10 C.F.R. § 963.11"
title: "10"
number: "963.11"
heading: "Suitability determination."
url: "https://uscodex.org/cfr/10/963.11"
---

# §963.11. Suitability determination.


DOE will evaluate whether the Yucca Mountain site is suitable for the location of a geologic repository on the basis of the preclosure and postclosure determinations described in §§ [963.12](/cfr/10/963.12.md) and [963.15](/cfr/10/963.15.md). If DOE's evaluation of the Yucca Mountain site for the location of a geologic repository under §§ [963.12](/cfr/10/963.12.md) and [963.15](/cfr/10/963.15.md) shows that the geologic repository is likely to meet the applicable radiation protection standards for the preclosure and postclosure periods, then DOE may determine that the site is a suitable location for the development of such a repository.


## Notes

### Authority

Authority: 42 U.S.C. 2011 et seq.; 42 U.S.C. 7101 et seq.; 42 U.S.C. 10101, et seq.

### Source

Source: 66 FR 57336, Nov. 14, 2001, unless otherwise noted.
