---
kind: "section"
citation: "10 C.F.R. § 835.3"
title: "10"
number: "835.3"
heading: "General rule."
url: "https://uscodex.org/cfr/10/835.3"
---

# §835.3. General rule.

- (a) No person or DOE personnel shall take or cause to be taken any action inconsistent with the requirements of:
  - (1) This part; or
  - (2) **Any program, plan, schedule, or other process established by this part.**
- (b) With respect to a particular DOE activity, contractor management shall be responsible for compliance with the requirements of this part.
- (c) Where there is no contractor for a DOE activity, DOE shall ensure implementation of and compliance with the requirements of this part.
- (d) Nothing in this part shall be construed as limiting actions that may be necessary to protect health and safety.
- (e) For those activities that are required by §§ [835.102](/cfr/10/835.102.md), [835.901(e)](/cfr/10/835.901.md?p=e), [835.1202 (a)](/cfr/10/835.1202.md?p=a), and [835.1202(b)](/cfr/10/835.1202.md?p=b), the time interval to conduct these activities may be extended by a period not to exceed 30 days to accommodate scheduling needs.

## Notes

### Amendments

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59682, Nov. 4, 1998]

### Authority

Authority: 42 U.S.C. 2201, 7191; 50 U.S.C. 2410.

### Source

Source: 58 FR 65485, Dec. 14, 1993, unless otherwise noted.

### Amendments

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59682, Nov. 4, 1998]
